SAIC-Q-1043 Asphalt Core Density Testing Inspection
SAIC-Q-1043 Asphalt Core Density Testing Inspection
00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Asphalt Core Density Testing Inspection SAIC-Q-1043 15-Nov-17 MAH-SA-C-3189
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSIO10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-006-02 3.7
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H
ITEM RE-INSP
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A
No. DATE
A Field Sampling
Cores for density and thickness test shall be taken daily from previous days
production at the following rates:
SAES Q-006
A1 For 0 to 4000m2 1 core per 600 m2 Sec.
For 4000 m2 to 20,000 m2 1 core per 900 m2 5.4.4.3
SAES Q-006
Core compaction requirements shall be equal to or greater than 95% of
B3 Sec.
Marshall density per ASTM D6926, using material sampled at the road site.
5.4.3.B
Areas of asphalt which fail to meet the required tolerances/compaction shall be SAES Q-006
B4 removed by saw cutting to the full depth of the wearing course and base Sec.
course. 5.4.3.D
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-Q-006 -- Asphalt and Sulfur Extended Asphalt Concrete Paving, 22 May 2016
2- Schedule "Q" -- Project Quality Requirements
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Core compaction requirements shall be equal to or greater than 95% SAES Q-006
B3 of Marshall density per ASTM D6926, using material sampled at the Sec.
road site. 5.4.3.B
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-Q-006 -- Asphalt and Sulfur Extended Asphalt Concrete Paving, 22 May 2016
2- Schedule "Q" -- Project Quality Requirements