LOI in fly ash at ESP % 37 Imported coal used TPD 122.8 Indian Coal used TPD 32 Fly ash to ESP % 0.3 Qty of ash in Imported coal TPD 9.554 Qty of ash in Indian coal coal TPD 12.8 Total qty of ash in coal TPD 22.354 Qty of fly ash in total coal TPD 20.118 Qty of fly ash to ESP TPD 0.060 Eqv GCV of combined fuel kCal/kg 6224.92 Eqv Carbon in Fuel % 62.01 GCV of Carbon kCal/kg 8050 Case I: When MDC Bypass hrs hrs 0 % 0.0458 Ash% of fly ash in ESP % 0.270
Case II: When MDC Bypass for 2 hours hrs 2
Extra fly Ash collected in ESP TPD 0.543 Total fly ash to ESP TPD 0.604 Carbon loss % 0.4584 US Coal: C % 67.95 H % 4.83 N % 1.22 S % 4.52 O % 5.28 M % 8.42 A 7.78 100 GCV kCal/kg 6935
w.r.t. total fly ash
2.7 % ash to MDC when MDC is in operation
Indian Coal: C % 39.2 H % 2.75 N % 2.5 S % 0.3 O % 7.25 M % 8 A 40 100 GCV kCal/kg 3500