Assuming Fly ash % 90

Assuming bed ash % 10


LOI in fly ash at ESP % 37
Imported coal used TPD 122.8
Indian Coal used TPD 32
Fly ash to ESP % 0.3
Qty of ash in Imported coal TPD 9.554
Qty of ash in Indian coal coal TPD 12.8
Total qty of ash in coal TPD 22.354
Qty of fly ash in total coal TPD 20.118
Qty of fly ash to ESP TPD 0.060
Eqv GCV of combined fuel kCal/kg 6224.92
Eqv Carbon in Fuel % 62.01
GCV of Carbon kCal/kg 8050
Case I: When MDC Bypass hrs hrs 0
% 0.0458
Ash% of fly ash in ESP % 0.270

Case II: When MDC Bypass for 2 hours hrs 2


Extra fly Ash collected in ESP TPD 0.543
Total fly ash to ESP TPD 0.604
Carbon loss % 0.4584
US Coal:
C % 67.95
H % 4.83
N % 1.22
S % 4.52
O % 5.28
M % 8.42
A 7.78 100
GCV kCal/kg 6935

w.r.t. total fly ash

2.7 % ash to MDC when MDC is in operation


Indian Coal:
C % 39.2
H % 2.75
N % 2.5
S % 0.3
O % 7.25
M % 8
A 40 100
GCV kCal/kg 3500