Project- Swastik
Consultancy Services For Carrying Out Feasibility Study and Preparation of DPR for
Construction/Improvement of Existing Road from CL-9 Specification to NHDL
Specifications on EPC Mode from Km 10.00 to Km 32.70 on Singtham - Dikchu road and
From km 0.00 to km 7.360 on Dikchu— Rangrang road (Net Length 30.06 Km) in Sikkim
State Under 764 BRTF Area Under Project Swastik in Sikkim State.
FINAL FEASIBILITY REPORT
DETAILED INVENTORY SURVEY OF CULVERTS

L N Malviya Infra Projects Pvt. Ltd. ,BHOPAL (MP)


T-10, Third Floor above Vishal Mega Mart
Press complex M.P.Nagar Zone-1 Bhopal,
Email: lnm_bhopal@rediffmail.com
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27.280823' N
1 10+400 Slab 0.2 1x1.5 6.2 7.2 Retaining wall Fair Fair Not exist Not exist Fair 2 5 0.6 R-L No Adequate Poor 88.4482' E

Poor Condition/ 27.281863' N


IL=2.2
2 10+550 Slab 0.25 1x2.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.2 NA R-L No Adequate Parapet Not 88.448178' E
BL=5
Exist

27.282395' N
3 10+600 Slab 0.25 1x2.0 5.5 6 Retaining wall Fair Fair Not exist Not exist Fair 1.4 1.6 0.6 R-L No Adequate Fair 88.448157' E

Poor Condition/ 27.283078' N


IL=2.2
4 10+675 Slab 0.25 1x2.0 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1.4 NA R-L No Adequate Parapet Not 88.448278' E
BL=5
Exist

Fair Condition / 27.283627' N


5 10+770 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not 88.448918' E
Exist

27.284347' N
IL=2.2
6 10+875 Slab 0.25 1x2.5 5.5 6.5 Retaining wall Poor Poor Not exist Not exist Fair 1.5 0.6 R-L No Adequate Fair 88.449833' E
BL=5

27.285213' N
7 11+000 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not Exist Not exist Not Exist 1 1.2 NA R-L No Adequate Fair 88.449843' E

27.2861' N
8 11+090 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not Exist Not exist Not Exist 1 1.1 NA R-L No Inadequate Fair 88.449863' E

Both Side 27.286588' N


9 11+150 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Poor Not exist Not Exist Not Exist 0.5 0.6 NA R-L No Adequate Parapet Not 88.449872' E
Exist

Both Side 27.288282' N


10 11+345 Slab 0.25 1x2.0 5.5 6.5 Retaining wall Fair Poor Not exist Not Exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not 88.449812' E
Exist

Both Side 27.288673' N


11 11+400 Slab 0.2 1x1.5 5.5 7.5 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate Parapet Not 88.449018' E
Exist

Both Side 27.289527' N


1x1.5
12 11+500 Slab 0.2 5.5 7.5 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 0.6 R-L No Adequate Parapet Not 88.448823 E
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27.29003' N
13 11+575 Slab 0.4 1x5.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 1.8 2 Not Exist R-L No Adequate Fair 88.44902' E

27.290612' N
14 11+650 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 1 1.5 Not Exist R-L No Adequate Fair 88.449012' E

27.291573' N
15 11+740 Slab 0.25 1x2.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1.5 2 0.6 R-L No Adequate Fair 88.448772' E

IL=2 Parapet not 27.294827' N


16 12+070 Slab 0.3 1x3.8 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 1.5 R-L No Adequate Fair
BL=5 exist 88.449728' E

27.295528' N
17 12+125 Slab 0.2 1x1.0 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Fair 88.449048' E

27.296522' N
18 12+325 Slab 0.2 1x1.0 5 6.5 Retaining wall Fair Poor Not exist Not exist Fair 1 1 0.6 R-L No Adequate Fair 88.44892' E

27.297382' N
IL=2 Parapet not
19 12+400 Slab 0.2 1x1 5 6 Retaining wall Fair Fair Not exist Not exist Not exist 1 NA R-L NA Inadequate 88.448998' E
BL=5 exist

Vertical 27.297953' N
20 12+455 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1 1.2 0.6 R-L No Inadequate Clearance not 88.449265' E
adequate

Both Side 27.298423' N


1x0.9
21 12+465 Pipe 0.2 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88.44932' E
(Silting)
Exist

Both Side 27.298965' N


22 12+550 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1 1.1 NA R-L No Adequate Parapet Not 88.449967' E
Exist

27.303092' N
23 12+955 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 0.8 1 NA R-L No Adequate No Parapet 88.451873' E

27.303497' N
24 13+200 Slab 0.2 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Fair 1.5 3 0.6 R-L No Adequate RHS & LHS 88.452657' E
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

No Parapet 27.303552' N
25 13+300 Slab 0.2 1x2.0 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 2.5 2.6 NA R-L No Adequate Reinforcement 88.453163' E
Exponsed

27.30519 N
Parapet
26 13+575 Slab 0.2 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1.5 1.6 NA R-L No Adequate 88.454757' E
Damaged

27.305487'
1x1.5
27 13+650 Slab 0.2 5 6 Retaining wall Fair Poor Not exist Not exist Poor 1 1 NA R-L No Inadequate Poor 88⁰455115'
(Silting)

27⁰18.348'
28 13+860 Slab 0.2 1X1.5 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Fair 88⁰27.299'

27.309387' N
29 14+175 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Poor 1 1 NA R-L No Inadequate Poor 88.457563' E

27⁰18.623' N
RHS Parapet
30 14+285 Slab 0.3 1x4.3 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 2 1.5 0.6 R-L No Adequate 88⁰27.487' E
Not Exist

27.311468' N
31 14+435 Slab 0.15 1x1.5 6.5 7.5 Retaining wall Poor Poor Not exist Not exist Not Exist 1 1.5 NA R-L No Adequate Poor 88.458907' E

27.311418' N
32 14+455 pipe - 1x0.9 dia 6 7 Retaining wall Poor Poor Not exist Not exist Not Exist 0.8 1 NA R-L No Inadequate Poor 88.458965' E

27⁰18.763'
33 14+700 Slab 0.3 1x5.8 5 7.5 Retaining wall Fair Poor Not exist Not exist Not Exist 2.5 2.6 NA R-L No Adequate Fair 88⁰27.613'

27⁰18.783'
34 14+760 Slab 0.2 1x2.0 5 6 Retaining wall Fair Fair Not exist Not exist Fair 2 2.1 0.6 R-L No Adequate Fair 88⁰27.649'

27⁰18.859'
35 14+980 Slab 0.2 1x1.0 5 6 Retaining wall Fair Fair Not exist Not exist Fair 1 1.2 1.1 R-L No Adequate Fair 88⁰27.745'

Both Side 27⁰18.837'


36 15+050 Slab 0.2 1x1.2 6 7 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate Parapet Not 88⁰27.790'
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27⁰19.000'
1x1.0
37 15+635 Slab 0.2 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist chocked chocked NA R-L No Adequate Fair 88⁰28.074'
(Silting)

RHS Side
27⁰19.000' N
1.2
38 15+680 Slab 0.25 1x2.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1.8 2 R-L No Adequate Fair 88⁰28.080' E
LHS Side
0.6

27.318317' N
Parapet Not
39 16+055 Slab 0.2 1x1.5 5.5 6.8 Retaining wall Fair Poor Not Exist Not Exist Not Exist 0.5 0.5 NA R-L No Inadequate 88.471118' E
Exist

27.31873 N
Parapet Not
40 16+230 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Poor Not Exist Not Exist Not Exist 0.5 0.5 NA R-L No Inadequate 88.472798E
Exist

1x1.0 Parapet Not 27.319612 N


41 16+360 - 0.2 5.5 6.5 Retaining wall Fair Poor Not Exist Not Exist Not Exist 0.5 0.5 NA R-L No
(Silting) Exist 88.47556 E

27.319552 N
Parapet Not
42 16+575 Pipe 1x1.2 5.5 6.5 Retaining wall Fair Poor Not Exist Not Exist Not Exist 1 1.2 NA R-L No Inadequate 88.47665 E
Exist

27.31979 N
43 16+675 Slab 0.2 1x1 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 1.2 NA R-L No Inadequate Fair 88⁰.478063 E

27.32033 N
44 16+815 Slab 0.3 1x2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.2 1.3 NA R-L No Adequate Fair 88.478877 E

27.321487' N
45 16+920 Slab 0.25 1x2 6 7 Retaining wall Fair Fair Not exist Not exist Not Exist 2 2.4 NA R-L No Adequate Fair 88.480123' E

27.322422' N
Covered With
46 17+110 Slab 0.2 1x1.5 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate 88.480503' E
Bushes

27⁰19.126'
47 17+240 Slab 0.2 1x1.0 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate Fair 88⁰28.257'

27⁰19.438'
48 17+305 Slab 0.25 1x2.0 6.5 7.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Fair 88⁰29.986'
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27.32404' N
49 17+605 Slab 0.2 1x1 6.5 7.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Fair 88.483182'E

27.324365' N
50 17+840 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1.3 1.5 0.6 R-L No Adequate Fair 88.485453'E

27.32476 N
51 18+125 Slab 0.2 1x1 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1 NA R-L No Inadequate Fair 88.487923 E

Both Side 27.32476' N


52 18+190 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Poor Poor Not exist Not exist Not Exist 0.5 0.5 NA R-L No Inadequate Parapet Not 88.488905'E
Exist

Both Side 27.32557' N


53 18+315 Slab 0.3 1x2.0 6.2 7.5 Retaining wall Poor Poor Not exist Not exist Not Exist 1 1.2 NA R-L No Inadequate Parapet Not 88.490637'E
Exist

Both Side 27.325155' N


54 18+410 Slab 0.25 1x2.0 6.2 7.5 Retaining wall Poor Poor Not exist Not exist Not Exist 0.9 1.1 NA R-L No Adequate Parapet Not 88.491208' E
Exist

Both Side
27.325168
55 18+505 Slab 0.25 1x2.0 6 7 Retaining wall Poor Poor Not Exist Not Exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not
88.4925468
Exist

Both Side
27.325177
56 18+535 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Poor Poor Not Exist Not Exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not
88.492952
Exist

Both Side 27⁰19.476'


57 18+720 Slab 0.2 1x1.0 5.5 6.8 Retaining wall Poor Poor Not Exist Not Exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not 88⁰29.688'
Exist

Both Side
27.329452
58 19+340 Slab 0.2 1x1.5 5 6.5 Retaining wall Fair Fair Not Exist Not Exist Not Exist 0.9 1.3 NA R-L No Adequate Parapet Not
88.491532
Exist

Both Side
27.325434
59 19+620 Slab 0.2 2x1.0 R-L 5.5 Retaining wall Fair Fair Not exist Not Exist Not Exist 0.8 1.1 NA R-L No Adequate Parapet Not
88.546422
Exist

Both Side
27.330922
60 19+915 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not Exist Not Exist 0.8 1.1 NA R-L No Adequate Parapet Not
88.492745
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

Both Side
1x0.9 27.332528
61 19+975 pipe - 5.5 6.5 Retaining wall Poor Poor Not exist Not Exist Not Exist 0.6 0.9 NA R-L No Inadequate Parapet Not
(Silting) 88.491328
Exist

Both Side
27.334105
62 20+050 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.6 0.7 NA R-L No Inadequate Parapet Not
88.490667
Exist

Both Side
27.336943
63 20+130 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 1 1 NA R-L No Inadequate Parapet Not
88.491575
Exist

Both side
27.337856
64 20+320 Slab 0.2 1x1.5 6 7 Retaining wall Fair Fair Not exist Not exist Not exist 1 1 NA R-L No Inadequate Parapet Not
88.456477
Exist

Both side
27.336818
65 20+675 Slab 0.2 1x1.0 6 7 Retaining wall Fair Fair Not exist Not exist Not exist 1 1 NA R-L No Inadequate Parapet Not
88.49164
Exist

Both side
27.33762
66 20+775 Slab 0.2 1x1.5 6 7 Retaining wall Fair Fair Not exist Not exist Not exist 0.8 1 NA R-L No Inadequate Parapet Not
88.491848
Exist

Both side
1x1.0 27.338383
67 20+900 Slab 0.2 6 7 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
(Silting) 88.492382
Exist

Both side
1x1.0 27.339283
68 21+010 Slab 0.2 6 7 Retaining wall Fair Poor Not exist Not exist Not Exist 0.4 0.5 NA R-L No Inadequate Parapet Not
(Silting) 88.49294
Exist

Both side
27.340763
69 21+250 Slab 0.2 1x1.0 6 7 Retaining wall Fair Fair Not exist Not exist Not Exist 0.6 0.5 NA R-L No Inadequate Parapet Not
88.493658
Exist

Right Side
27.342033
70 21+575 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 0.5 0.5 NA R-L No Inadequate Parapet Not
88.490958
Exist

27.34238' N
71 21+625 Slab 0.2 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Fair 3 3 0.6 R-L No Adequate Fair 88.490887'E

Both Side
Parapet Not 27.343362' N
72 21+950 Slab 0.25 1x1.2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1 1.5 NA R-L No Adequate
Exist /Poor 88.488096'E
Condition
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27.344187' N
73 22+075 Slab 0.25 1x2.0 5.5 6.5 Retaining wall Poor Fair Not exist Not exist Fair 1 1.2 NA R-L No Adequate fair
88.487116'E

27.348525 N
74 22+645 Slab 0.3 1x3.6 5 7 Retaining wall Fair Fair Not exist Not exist Fair 1.8 1.8 0.6 R-L No Adequate Fair 88.485597 E

Both Side 27.349205' N


75 22+750 Slab 0.2 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 2 4 NA R-L No Adequate Parapet Not 88.48537' E
Exist

Both Side 27.349856' N


76 22+845 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 2 NA R-L No Adequate Parapet Not 88⁰.485099' E
Exist

Both Side
27.351737
77 23+065 Slab 0.2 1x1.0 5 6 Retaining wall Poor Poor Not exist Not exist Not Exist 0.5 0.5 NA R-L No Inadequate Parapet Not
88.484574
Exist

27.353397' N
78 23+250 Slab 0.2 1x1 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Poor 1 1 0.6 R-L No Adequate Poor Condition 88.484497' E

Left Side 27.355115' N


79 23+450 Slab 0.2 1x1 5.5 6.5 Retaining wall Fair Fair Not Exist Not Exist Poor 2 2.5 0.6 R-L No Adequate Parapet Not 88.484117' E
Exist

Right Side
27.356481' N
80 23+600 Slab 0.2 1x2 5 7 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Parapet Not
88.483893' E
Exist

1x1.0 27.359235
81 23+915 Slab 0.2 5.5 6.5 Retaining wall Poor Poor Not exist Not exist Poor 1 1.2 NA R-L No Adequate Fair
(Silting) 88.483854

27360416' N
82 24+050 Slab 0.3 1x4 5.5 7 Retaining wall Fair Fair Not exist Not exist Fair 3 2.5 0.6 R-L No Adequate Fair 88.483941'E

Both Side
27.360693
83 24+095 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 1 1.1 NA R-L No Adequate Parapet Not
88.484133
Exist

Both Side
27.36236' N
84 24+290 Slab 0.2 1x1.2 5.5 7.5 Retaining wall Fair Fair Not exist Not exist Poor 1.5 1.5 0.6 R-L No Adequate Parapet Not
88.484375'E
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

Both Side 27.362622' N


85 24+325 Slab 0.2 1x1 5.5 7.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88.48455' E
Exist

Both Side
27.363243' N
86 24+400 Slab 0.2 1x2 5 7 Retaining wall Fair Fair Not exist Not exist Not Exist 2 2 NA R-L No Adequate Parapet Not
88.48497' E
Exist

Both Side
27.366521' N
87 24+775 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
88.485342'E
Exist

Both Side
27.369402' N
S 25+100 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.8 0.9 NA R-L No Inadequate Parapet Not
88.485602'E
Exist

Both Side
27.253678
89 25+150 Slab 0.25 1x2.0 6 7 Retaining wall 0.5 0.7 NA R-L No Inadequate Parapet Not
88.786687
Exist

Both Side
27.370205' N
90 25+235 Slab 0.2 1x2.0 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.7 NA R-L No Inadequate Parapet Not
88.486012' E
Exist

Both Side
27.3725537' N
91 25+500 Pipe - 1x0.9dia 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not
88.487507' E
Exist

Both Side
27.373872' N
92 25+700 Slab 0.25 1x1.5 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.8 1.1 NA R-L No Adequate Parapet Not
88.488277' E
Exist

Both Side
27.374317' N
93 25+810 Slab 0.2 1x2.0 6.5 7.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.5 NA R-L No Inadequate Parapet Not
88.489068' E
Exist

Both Side
27.375137' N
94 25+925 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
88.49001' E
Exist

Both Side
1x1.5 27.3735' N
95 26+020 Slab 0.2 6 7 Retaining wall Fair Poor Not exist Not exist Not Exist 0.4 0.5 NA R-L No Inadequate Parapet Not
(Silting) 88.489732' E
Exist

Both Side 27.37558' N


96 26+080 Slab 0.2 1x1 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1 2 NA R-L No Adequate Parapet Not 88.491223' E
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

Both Side 27.37574' N


97 26+275 Slab 0.2 1x1 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1.6 1.6 NA R-L No Adequate Parapet Not 88.493033' E
Exist

Both Side
1x1.0 27.37671
98 26+500 Slab 0.2 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 0.9 1.2 NA R-L No Inadequate Parapet Not
(Silting) 88.493878
Exist

27.381518' N
99 26+595 Slab 0.2 1x1 5 7 Retaining wall Fair Fair Not exist Not exist Fair 1 1 0.5 R-L No Adequate Fair 88⁰29.694'

Both Side 27⁰22.593'


100 26+725 Slab 0.2 1x5.5 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 4.5 4.5 NA R-L No Adequate Parapet Not 88⁰29.728'
Exist

27⁰22.635'
101 26+880 Slab 0.25 1x1.5 5 7 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰29.788'

Both Side 27⁰22.700'


102 26+975 Slab 0.2 1x2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88⁰29.877'
Exist

Both Side
27.381953
103 27+395 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate Parapet Not
88.501587
Exist

Both Side
Parapet Not 27.382955
104 27+475 Slab 0.2 1x1.0 6 7 Retaining wall Fair Fair Not exist Not exist Not Exist 0.8 1 NA R-L No Inadequate
Exist / Covered 88.50231
with Bushes

Both Side 27⁰22.896'


105 27+625 Slab 0.35 1x6 5 7 Retaining wall Fair Fair Not exist Not exist Not Exist 4 5 NA R-L No Adequate Parapet Not 88⁰30.169'
Exist

Both Side 27⁰22.000'


106 27+875 Slab 0.2 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88⁰30.294'
Exist

Both Side
27.385018
107 28+230 Slab 0.2 1x1.0 6.5 8 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate Parapet Not
88.507543
Exist

Both Side 27⁰23.181'


108 28+525 Slab 0.2 1x2 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 2.5 1 NA R-L No Adequate Parapet Not 88⁰30.603'
Exist
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

Both Side
27.386818
109 28+650 Slab 0.2 1x1.5 6.5 7.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.1 1.5 NA R-L No Adequate Parapet Not
88.510762
Exist

Both Side 27⁰23.392'


110 29+155 Slab 0.2 1x1.8 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 2.5 2.5 NA R-L No Adequate Parapet Not 88⁰30.832'
Exist

27⁰23.581'
111 29+560 Slab 0.2 1x2.4 5 6 Retaining wall Fair Fair Not exist Not exist Fair 2 2 1.1 R-L No Adequate Fair 88⁰30.910'

Both Side 27⁰23.642'


112 29+695 Slab 0.2 1x1 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88⁰30.943'
Exist

Both Side
1x1.0 27.394277
113 29+770 Slab 0.2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 0.5 0.8 NA R-L No Adequate Parapet Not
(Silting) 88.5155
Exist

Both Side
1x1.0 27.395543
114 29+850 Slab 0.2 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
(Silting) 88.516048
Exist

Both Side 27⁰23.716'


115 29+875 Slab 0.2 1x3.2 5 6 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not 88⁰30.978'
Exist

Both Side 27⁰23.893'


116 30+210 Slab 0.2 1x1.5 4.5 5.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.5 1.5 NA R-L No Adequate Parapet Not 88⁰31.108'
Exist

Both Side
27.398693
117 30+250 Slab 0.2 1x1.5 5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.2 NA R-L No Adequate Parapet Not
88.518327
Exist

Both Side
27.4009
118 30+580 HPC - 1x0.9 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
88.519903
Exist

Both Side
27.401
119 30+620 Slab 0.2 1x1.5 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 0.4 0.5 NA R-L No Inadequate Parapet Not
88.520143
Exist

27⁰24.216'
120 31+000 Slab 0.2 1x2 5 6 Retaining wall Fair Poor Not exist Not exist Poor 1.5 1.5 0.6 R-L No Adequate Fair 88⁰31.235'
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27.405023
121 31+475 Slab 0.25 1x3.5 5 6 Retaining wall Fair Poor Not exist Not exist Poor 1 1.2 NA R-L No Inadequate Poor
88.521847

27⁰24..331'
122 31+550 Slab 0.25 1x3.5 5 6 Retaining wall Fair Fair Not exist Not exist Fair 1.5 1.6 0.6 R-L No Adequate Fair 88⁰31.244'

27⁰24..451'
123 31+800 Slab 0.2 1x5.5 5.5 6.5 Retaining wall Fair Fair Not exist Fair Not Exist 1.5 1.5 0.6 R-L No Adequate Fair 88⁰31.127'

27.408063
124 31+870 Slab 0.2 1x2.0 5.5 6.5 Retaining wall Fair Poor Not exist Fair Not Exist 0.5 0.8 NA R-L No Inadequate Poor
88.518695

Both Side 27⁰24..857'


125 32+625 Slab 0.25 1x1 4 5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.5 1.5 NA R-L No Adequate Parapet Not 88⁰30.922'
Exist

27⁰24..967'
126 32+840 Slab 0.3 1x2 12 12 Retaining wall Fair Fair Not exist Fair Not Exist 2.5 2.5 0.6 R-L No Adequate Fair 88⁰30.919'

Both Side 27⁰25..076'


127 33+075 Slab 0.2 1x1 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not Exist 1.5 1.5 NA R-L No Adequate Parapet Not 88⁰30.940'
Exist

Both Side 27⁰25..284'


128 33+300 Slab 0.3 1x2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 2 2 NA R-L No Adequate Parapet Not 88⁰30.930'
Exist

27⁰25..379'
129 33+640 Slab 0.25 1x2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰30.895'

27⁰25..412'
130 33+740 Slab 0.25 1x2 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰30.833'

27⁰25..543'
131 33+990 Slab 0.25 1x2 6.5 8.5 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰30.834'
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

1x1.5 Both Side


27.428272
132 34+285 Slab 0.2 (Boulder at 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Inadequate Parapet Not
88.51431
Upstream) Exist

27⁰25.753'
133 34+410 Slab HPC 1X0.9 5 6 Retaining wall Fair Fair Not exist Not exist Fair 0.6 1 NA R-L No Adequate Fair 88⁰30.886'

27⁰25..743'
134 34+460 Slab 0.25 1x5 5 6 Retaining wall Fair Fair Not exist Not exist Fair 4 5 0.6 R-L No Adequate Fair 88⁰30.898'

27.406174
135 34+680 Slab 0.2 1x1 4.5 5 Retaining wall Poor Poor Not exist Not exist Not Exist 0.5 0.3 NA R-L No Adequate Fair
88.521328

27⁰25..996'
136 34+920 Slab 0.3 1x2 10 11 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰30.883'

Parapet Not 27.434852


137 35+100 Pipe - 1x0.9 5 6 Retaining wall Fair Poor Not exist Not exist Not Exist 1 1.1 NA R-L No Adequate
Exist 88.51479

27⁰26.297'
138 35+525 Slab 0.3 1x1.5 10 11 Retaining wall Fair Fair Not exist Not exist Fair 1.5 2 0.6 R-L No Adequate Fair 88⁰30.866'

27⁰26..512'
139 36+050 Slab 0.3 1x2 10 11 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰30.873'

Parapet Not 27.44206


140 36+180 Slab 0.2 1x1.5 5 6.5 Retaining wall Fair Poor Not exist Not exist Not Exist 0.5 0.6 NA R-L No Adequate
Exist 88.515522

27⁰26.644'
141 36+365 Slab 0.25 1x2.0 7 8 Retaining wall Fair Fair Not exist Not exist Fair 1.2 1 0.6 R-L No Adequate Fair
88⁰30.967'

27⁰26..787'
142 36+715 Slab 0.3 1x2 10 11 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰31.096'

27.446798
143 36+765 Slab 0.25 1x2.0 5 8 Retaining wall Fair Fair Not exist Not exist Fair 1 1 0.6 R-L No Adequate Fair
88.519173
PROJECT
INVENTORY & CONDITION SURVEY FOR CULVERTS
PROJECT NAME - "SINGTAM TO DIKCHU"

Adequacy of Water way


Height above Bed level (Upto
Details of protection work Condition of various features of Culvert
Span parapet/railing top)
Type of Arrangement
Thickness Carriage- Height of Direction of
Structures and Total Width of Presence of
S. No Existing CH of Slab way width parapet/rail Flow (L-R Remarks Coordinates
(Pipe. Slab Ventway Culvert (m) Scour
(m) (m) Slab/ Pipe/ Parapet/ Hand ing (m) or R-L)
Box. Arch) (No.x Lengh) Type Condition Wing Wall Return wall U/S Side (m) D/S Side (m)
(m) Box/ Arch Rail

27⁰26..893'
144 36+955 Slab 0.3 1x3 10 11 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Fair 88⁰31.184'

1x1.5 27.452887
145 37+720 Slab 0.2 5.5 9 Retaining wall Poor Poor Not exist Not exist Poor 0.5 0.5 Na R-L No Inadequate Poor
(Silting) 88.521445

Both Side 27⁰27..196'


146 37+765 Slab 0.3 1x1.5 3.5 4.5 Retaining wall Fair Fair Not exist Not exist Not Exist 2 2 NA R-L No Adequate Parapet Not 88⁰31.303'
Exist

Both Side 27⁰27..249'


147 37+875 Slab 0.25 1x1.5 12 12 Retaining wall Fair Fair Not exist Not exist Fair 2 2 0.6 R-L No Adequate Parapet Not 88⁰31.313'
Exist

Both Side
27.456382
148 38+210 Slab 0.2 1x1.5 5.5 7 Retaining wall Fair Fair Not exist Not exist Not Exist 1 1 NA R-L No Adequate Parapet Not
88.520533
Exist

Both side 27⁰27..487'


149 38+750 Slab 0.3 1x1.5 5 6 Retaining wall Fair Fair Not exist Not exist Not exist 2 2 NA R-L No Adequate Parapet Not 88⁰31.357'
Exist

Both Side
Parapet Not 27.459
150 38+846 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.5 0.6 NA R-L No Inadequate
Exist / Covered 88.52292
with Bushes

Both Side
Parapet Not 27.459157
151 38+865 Slab 0.2 1x1.0 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.4 0.5 NA R-L No Inadequate
Exist / Covered 88.52295
with Bushes

Both Side
Parapet Not 27.460527
152 39+025 Slab 0.2 1x1.5 5.5 6.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.4 0.5 NA R-L No Inadequate
Exist / Covered 88.523167
with Bushes

Both Side
Parapet Not 27.438825
153 39+075 Slab 0.2 1x1.0 6.5 7.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.6 0.8 NA R-L No Inadequate
Exist / Covered 88.519817
with Bushes

Both Side
Parapet Not 27.462613
154 39+270 Slab 0.2 1x1.0 6.5 7.5 Retaining wall Fair Fair Not exist Not exist Not exist 0.8 0.9 NA R-L No Inadequate
Exist / Covered 88.523467
with Bushes
INDEX

S.No. Existing Ch. Items

Inventory and Condition Survery of 
1 10+400
culverts

Inventory and Condition Survery of 
2 10+550
culverts

Inventory and Condition Survery of 
3 10+600
culverts

Inventory and Condition Survery of 
4 10+675
culverts

Inventory and Condition Survery of 
5 10+770
culverts

Inventory and Condition Survery of 
6 10+875
culverts

Inventory and Condition Survery of 
7 11+000
culverts

Inventory and Condition Survery of 
8 11+090
culverts

Inventory and Condition Survery of 
9 11+150
culverts
Inventory and Condition Survery of 
10 11+345
culverts

Inventory and Condition Survery of 
11 11+400
culverts

Inventory and Condition Survery of 
12 11+500
culverts

Inventory and Condition Survery of 
13 11+575
culverts

Inventory and Condition Survery of 
14 11+650
culverts

Inventory and Condition Survery of 
15 11+740
culverts

Inventory and Condition Survery of 
16 12+070
culverts

Inventory and Condition Survery of 
17 12+125
culverts

Inventory and Condition Survery of 
18 12+325
culverts

Inventory and Condition Survery of 
19 12+400
culverts

Inventory and Condition Survery of 
20 12+455
culverts
Inventory and Condition Survery of 
21 12+465
culverts

Inventory and Condition Survery of 
22 12+550
culverts

Inventory and Condition Survery of 
23 12+955
culverts

Inventory and Condition Survery of 
24 13+200
culverts

Inventory and Condition Survery of 
25 13+300
culverts

Inventory and Condition Survery of 
26 13+575
culverts

Inventory and Condition Survery of 
27 13+650
culverts

Inventory and Condition Survery of 
28 13+860
culverts

Inventory and Condition Survery of 
29 14+175
culverts

Inventory and Condition Survery of 
30 14+285
culverts

Inventory and Condition Survery of 
31 14+435
culverts
Inventory and Condition Survery of 
32 14+455
culverts

Inventory and Condition Survery of 
33 14+700
culverts

Inventory and Condition Survery of 
34 14+760
culverts

Inventory and Condition Survery of 
35 14+980
culverts

Inventory and Condition Survery of 
36 15+050
culverts

Inventory and Condition Survery of 
37 15+635
culverts

Inventory and Condition Survery of 
38 15+680
culverts

Inventory and Condition Survery of 
39 16+055
culverts

Inventory and Condition Survery of 
40 16+230
culverts

Inventory and Condition Survery of 
41 16+360
culverts

Inventory and Condition Survery of 
42 16+575
culverts
Inventory and Condition Survery of 
43 16+675
culverts

Inventory and Condition Survery of 
44 16+815
culverts

Inventory and Condition Survery of 
45 16+920
culverts

Inventory and Condition Survery of 
46 17+110
culverts

Inventory and Condition Survery of 
47 17+240
culverts

Inventory and Condition Survery of 
48 17+305
culverts

Inventory and Condition Survery of 
49 17+605
culverts

Inventory and Condition Survery of 
50 17+840
culverts

Inventory and Condition Survery of 
51 18+125
culverts

Inventory and Condition Survery of 
52 18+190
culverts

Inventory and Condition Survery of 
53 18+315
culverts
Inventory and Condition Survery of 
54 18+410
culverts

Inventory and Condition Survery of 
55 18+505
culverts

Inventory and Condition Survery of 
56 18+535
culverts

Inventory and Condition Survery of 
57 18+720
culverts

Inventory and Condition Survery of 
58 19+340
culverts

Inventory and Condition Survery of 
59 19+620
culverts

Inventory and Condition Survery of 
60 19+915
culverts

Inventory and Condition Survery of 
61 19+975
culverts

Inventory and Condition Survery of 
62 20+050
culverts

Inventory and Condition Survery of 
63 20+130
culverts

Inventory and Condition Survery of 
64 20+320
culverts
Inventory and Condition Survery of 
65 20+675
culverts

Inventory and Condition Survery of 
66 20+775
culverts

Inventory and Condition Survery of 
67 20+900
culverts

Inventory and Condition Survery of 
68 21+010
culverts

Inventory and Condition Survery of 
69 21+250
culverts

Inventory and Condition Survery of 
70 21+575
culverts

Inventory and Condition Survery of 
71 21+625
culverts

Inventory and Condition Survery of 
72 21+950
culverts

Inventory and Condition Survery of 
73 22+075
culverts

Inventory and Condition Survery of 
74 22+645
culverts

Inventory and Condition Survery of 
75 22+750
culverts
Inventory and Condition Survery of 
76 22+845
culverts

Inventory and Condition Survery of 
77 23+065
culverts

Inventory and Condition Survery of 
78 23+250
culverts

Inventory and Condition Survery of 
79 23+450
culverts

Inventory and Condition Survery of 
80 23+600
culverts

Inventory and Condition Survery of 
81 23+915
culverts

Inventory and Condition Survery of 
82 24+050
culverts

Inventory and Condition Survery of 
83 24+095
culverts

Inventory and Condition Survery of 
84 24+290
culverts

Inventory and Condition Survery of 
85 24+325
culverts

Inventory and Condition Survery of 
86 24+400
culverts
Inventory and Condition Survery of 
87 24+775
culverts

Inventory and Condition Survery of 
S 25+100
culverts

Inventory and Condition Survery of 
89 25+150
culverts

Inventory and Condition Survery of 
90 25+235
culverts

Inventory and Condition Survery of 
91 25+500
culverts

Inventory and Condition Survery of 
92 25+700
culverts

Inventory and Condition Survery of 
93 25+810
culverts

Inventory and Condition Survery of 
94 25+925
culverts

Inventory and Condition Survery of 
95 26+020
culverts

Inventory and Condition Survery of 
96 26+080
culverts

Inventory and Condition Survery of 
97 26+275
culverts
Inventory and Condition Survery of 
98 26+500
culverts

Inventory and Condition Survery of 
99 26+595
culverts

Inventory and Condition Survery of 
100 26+725
culverts

Inventory and Condition Survery of 
101 26+880
culverts

Inventory and Condition Survery of 
102 26+975
culverts

Inventory and Condition Survery of 
103 27+395
culverts

Inventory and Condition Survery of 
104 27+475
culverts

Inventory and Condition Survery of 
105 27+625
culverts

Inventory and Condition Survery of 
106 27+875
culverts

Inventory and Condition Survery of 
107 28+230
culverts

Inventory and Condition Survery of 
108 28+525
culverts
Inventory and Condition Survery of 
109 28+650
culverts

Inventory and Condition Survery of 
110 29+155
culverts

Inventory and Condition Survery of 
111 29+560
culverts

Inventory and Condition Survery of 
112 29+695
culverts

Inventory and Condition Survery of 
113 29+770
culverts

Inventory and Condition Survery of 
114 29+850
culverts

Inventory and Condition Survery of 
115 29+875
culverts

Inventory and Condition Survery of 
116 30+210
culverts

Inventory and Condition Survery of 
117 30+250
culverts

Inventory and Condition Survery of 
118 30+580
culverts

Inventory and Condition Survery of 
119 30+620
culverts
Inventory and Condition Survery of 
120 31+000
culverts

Inventory and Condition Survery of 
121 31+475
culverts

Inventory and Condition Survery of 
122 31+550
culverts

Inventory and Condition Survery of 
123 31+800
culverts

Inventory and Condition Survery of 
124 31+870
culverts

Inventory and Condition Survery of 
125 32+625
culverts

Inventory and Condition Survery of 
126 32+840
culverts

Inventory and Condition Survery of 
127 33+075
culverts

Inventory and Condition Survery of 
128 33+300
culverts

Inventory and Condition Survery of 
129 33+640
culverts

Inventory and Condition Survery of 
130 33+740
culverts
Inventory and Condition Survery of 
131 33+990
culverts

Inventory and Condition Survery of 
132 34+285
culverts

Inventory and Condition Survery of 
133 34+410
culverts

Inventory and Condition Survery of 
134 34+460
culverts

Inventory and Condition Survery of 
135 34+680
culverts

Inventory and Condition Survery of 
136 34+920
culverts

Inventory and Condition Survery of 
137 35+100
culverts

Inventory and Condition Survery of 
138 35+525
culverts

Inventory and Condition Survery of 
139 36+050
culverts

Inventory and Condition Survery of 
140 36+180
culverts

Inventory and Condition Survery of 
141 36+365
culverts
Inventory and Condition Survery of 
142 36+715
culverts

Inventory and Condition Survery of 
143 36+765
culverts

Inventory and Condition Survery of 
144 36+955
culverts

Inventory and Condition Survery of 
145 37+720
culverts

Inventory and Condition Survery of 
146 37+765
culverts

Inventory and Condition Survery of 
147 37+875
culverts

Inventory and Condition Survery of 
148 38+210
culverts

Inventory and Condition Survery of 
149 38+750
culverts

Inventory and Condition Survery of 
150 38+846
culverts

Inventory and Condition Survery of 
151 38+865
culverts

Inventory and Condition Survery of 
152 39+025
culverts
Inventory and Condition Survery of 
153 39+075
culverts

Inventory and Condition Survery of 
154 39+270
culverts
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
(Singtam to Dikchu Road)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2019-17.01.2019

Location (Km) 10+400 Culvert No. 1 Design CH: -------------

Proposal as per I & C Survey : Slab Purpose of Culvert :For cross drainage
(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 28⁰35.816' N


77⁰02.414' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

Span Arrangement (No. x W x H) (m)


4 1X1.5x5 1X1.5x2
(Clear)
Span Arrangement (No. x W x H) (m)
5 1X1.0x5 1X1.0x2
(Exp. - Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.2

14 Carriageway Width (m) 6.2

Inner Width from Parapet to Parapet(m) 7.2

16 Total Outer Width 7.2

17 Horizontal Curve / Vertical Gradient Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.0/ 0.5 0.6/ 1.0/ 0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 5.6m 2.6

Vertical Clearance (GL to Soffit of Slab/


21 4.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Retaining wall
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 NA CRSM
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Exist Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair Not exist

35 Condition of Parapet Broked Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+550 Culvert No. 2 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 28⁰16.912' N


88⁰26.891' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.2 m 1.2m
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Retaining wall
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA CRSM
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Not exist Fair

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+600 Culvert No. 3 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰16.946'


88⁰26.890'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.2 2

Vertical Clearance (GL to Soffit of Slab/


21 1.6 1.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+675 Culvert No. 4 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰16.987' N


88⁰26.907' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.7 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.2 1.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+770 Culvert No. 5 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.028' N


88⁰26.942' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+875 Culvert No. 6 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.052'


88⁰26.994'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X2.0 1X2.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2.5 1X2.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 8

16 Total Outer Width 9

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.0/0.5 0.6/1.0/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.8 2.1

Vertical Clearance (GL to Soffit of Slab/


21 2 1.5
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Poor Poor

33 Condition of Pier / Abutment Poor Poor

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Culvert condition is Poor and Reconstruction of new culvert is required

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+000 Culvert No. 7 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.113' N


88⁰26.991' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.5 1X0.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.2 1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Chocked

33 Condition of Pier / Abutment Fair Chocked

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+090 Culvert No. 8 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.166' N


88⁰26.992' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.5/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+150 Culvert No. 9 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark


27⁰17.198' N
1 GPS Coordinate @Structure center 88⁰26.985' E

2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.7

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.5/1.5/0.4 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked Silting Silting

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Disilting required

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+345 Culvert No. 10 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark


27⁰17.297' N
1 GPS Coordinate @Structure center 88⁰26.951' E

2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2.0 1X2.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.2 1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked Silting Silting

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+400 Culvert No. 11 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.320' N


88⁰26.941' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 1.1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+500 Culvert No. 12 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.372' N


88⁰26.929' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.6/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 1.6

Vertical Clearance (GL to Soffit of Slab/


21 1.1 1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+575 Culvert No. 13 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.439' N


88⁰26.929' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X4.4 1X4.4

Span Arrangement (No. x W ) (m) (Exp. -


5 1X5 1X5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.4 0.4

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.6
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 11+650 Culvert No. 14 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.444' N


88⁰26.924' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 10+740 Culvert No. 15 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.690' N


88⁰26.986' E
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.1

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+070 Culvert No. 16 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.732'


88⁰26.943'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X3.4 1X3.4

Span Arrangement (No. x W ) (m) (Exp. -


5 1x3.8 1X3.8
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.7 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+125 Culvert No. 17 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.730'


88⁰26.940'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+325 Culvert No. 18 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.791'


88⁰26.935'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+400 Culvert No. 19 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.843'


88⁰26.940'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+455 Culvert No. 20 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.880'


88⁰26.955'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.0/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : 25/03/2014

Location (Km) 12+465 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 21

S.N. Description L.H.S. R.H.S. Remark


27⁰17.843'
1 GPS Coordinate @Structure center
88⁰26.946'

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow NV

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5.5 5.5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 6.5 6.5

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 FRL to GL (m) 1 1

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NP NP

19 Condition of Pipe Covered with Bushes Covered with Bushes

Recorded by ............................ Checked by ............................


(Name & Signature) Page 1 of 6 (Name & Signature)
20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway Inadequate Inadequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure

Sketch of Culvert

Recorded by ............................ Checked by ............................


(Name & Signature) Page 2 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 3 of 6 (Name & Signature)
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+550 Culvert No. 22 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰17.936'


88⁰26.982'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.0/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 12+955 Culvert No. 23 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.191'


88⁰27.116'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 13+200 Culvert No. 24 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.215'


88⁰27.162'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 0.6/1.5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 3.6 2.1

Vertical Clearance (GL to Soffit of Slab/


21 3.4 1.9
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA CRSM


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 13+300 Culvert No. 15 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.233'


88⁰27.174'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2.0 1X2.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.4 2.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 13+575 Culvert No. 26 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.315'


88⁰27.287'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.4 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 13+650 Culvert No. 27 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.348'


88⁰27.299'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.0 1x1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 8

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) 7

16 Total Outer Width 8

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 0.6/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+175 Culvert No. 29 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.576'


88⁰27.449'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.0 1x1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 8

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 8

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+285 Culvert No. 30 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.623'


88⁰27.487'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x3.8 1x3.8

Span Arrangement (No. x W ) (m) (Exp. -


5 1x4.3 1x4.3
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6 / 4.3 / 0.5 0.6 / 4.3 / 0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.1

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+435 Culvert No. 31 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.683'


88⁰27.542'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.0 1x3.8

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x4.3
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : Jun-19

Location (Km) 14+455 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 32

S.N. Description L.H.S. R.H.S. Remark


27⁰18.692'
1 GPS Coordinate @Structure center
88⁰27.547'

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow NV

8 Length of Head Wall NA NA

9 Carriageway Width (m) 6.5 6.5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 7.5 7.5

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 FRL to GL (m) 0.8 0.6

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NA NA

19 Condition of Pipe Covered with Bushes Covered with Bushes


20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway adequate adequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+700 Culvert No. 33 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.763'


88⁰27.613'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X5.0 1X5.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X5.8 1X5.8
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.3 2.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+760 Culvert No. 34 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.783'


88⁰27.649'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.9 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 14+980 Culvert No. 35 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.859'


88⁰27.745'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.8 1X0.8

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.2 1X1.2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 8

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) 7

16 Total Outer Width 8

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 1/1.2/0.5 0.6/1.2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.1 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.9 1.1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 15+050 Culvert No. 36 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰18.837'


88⁰27.790'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.8 1X0.8

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.2 1X1.2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 15+635 Culvert No. 37 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.000'


88⁰28.074'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 Chocked Chocked
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch Chocked Chocked

25 Material of Pier / Abutment Chocked Chocked

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Inadequate Inadequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 15+680 Culvert No. 38 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.000'


88⁰28.080'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X2.0 1X2.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2.5 1X2.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2.5/0.5 1/2.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.8 2.5

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.6
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) RHS Side Baffle Wall

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 16+055 Culvert No. 39 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.103'


88⁰28.273'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.0 1x1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 16+230 Culvert No.40 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.125'


88⁰28.370'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.0 1x1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 16+360 Culvert No.40 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.101'


88⁰28.436'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.0 1x1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor Bushes Minor Bushes

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : Jun-19

Location (Km) 16+575 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 42

S.N. Description L.H.S. R.H.S. Remark


27⁰19.178'
1 GPS Coordinate @Structure center
88⁰28.603'

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 1.2 1.2

5 Thickness of Pipe 0.12 0.12

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow NV

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5.5 5.5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 6.5 6.5

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 FRL to GL (m) 1.2 1

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NA NA

19 Condition of Pipe Covered with Bushes Covered with Bushes

Recorded by ............................ Checked by ............................


(Name & Signature) Page 1 of 3 (Name & Signature)
20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway adequate adequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure

Sketch of Culvert

Recorded by ............................ Checked by ............................


(Name & Signature) Page 2 of 3 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 3 of 3 (Name & Signature)
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 17+150 Culvert No. 24 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.190'


88⁰28.685'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 16+815 Culvert No. 44 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰16.946'


88⁰26.890'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 16+920 Culvert No. 45 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.287'


88⁰28.81'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.1 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 17+605 Culvert No. 49 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.438'


88⁰29.986'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 17+840 Culvert No. 50 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.441'


88⁰29.010'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.05
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 0.6/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.1 1.9

Vertical Clearance (GL to Soffit of Slab/


21 1.3 1.1
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 18+125 Culvert No. 51 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.507'


88⁰29.265'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1 1x1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Chocked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 18+410 Culvert No. 54 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰19.481'


88⁰29.337'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1x2 1x2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.2

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.7
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 18+505 Culvert No. 56 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.325177


88.492952
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.05
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 18+505 Culvert No. 56 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.329452


88.491532
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.1 0.7
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 19+915 Culvert No. 60 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.330922


88.492745
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.6
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : 25/03/2014

Location (Km) 19+975 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 61

S.N. Description L.H.S. R.H.S. Remark


27.332528
1 GPS Coordinate @Structure center
88.491328

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow NV

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5.5 5.5

Inner Width from C/L of CW to Parapet


10 6.5 6.5
(m)

11 Total Outer Width 7.5 7.5

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NP NP

19 Condition of Pipe Covered with Bushes Covered with Bushes

Recorded by ............................ Checked by ............................


(Name & Signature) Page 1 of 6 (Name & Signature)
20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway Inadequate Inadequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure

Sketch of Culvert

Recorded by ............................ Checked by ............................


(Name & Signature) Page 2 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 3 of 6 (Name & Signature)
R ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Remark

Recorded by ............................ Checked by ............................


(Name & Signature) Page 4 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 5 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 6 of 6 (Name & Signature)
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+050 Culvert No. 62 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.334105


88.490667
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.5 0.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+130 Culvert No. 63 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.336943


88.491575
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+675 Culvert No. 65 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.336818


88.49164
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+775 Culvert No. 66 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.33762


88.491848
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.6
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+900 Culvert No. 67 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.338383


88.492382
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.45 0.35
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 21+010 Culvert No. 68 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.339283


88.49294
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.35 0.25
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 21+250 Culvert No. 69 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.340763


88.493658
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.45 0.35
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Inadequate Vertical Clearance

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 21+575 Culvert No. 70 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.342033


88.490958
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.1 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Right Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 20+625 Culvert No. 71 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰20.527'


88⁰29.043'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.5/1.5/0.5 0.5/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 3.6 3.6

Vertical Clearance (GL to Soffit of Slab/


21 2.7 2.7
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 21+950 Culvert No. 72 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.343362


88.488096
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.2 1X1.2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 22+075 Culvert No. 73 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 37.344187


88.487116
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1x2 1x2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Not Exist Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

Covered with
32 Condition of Slab/ Box/ Arch Fair Fair Bushes

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 22+645 Culvert No. 74 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰20.90'


88⁰29.15'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X3.0 1X3.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X3.6 1X3.6
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/3.6/0.5 0.6/3.6/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.4

Vertical Clearance (GL to Soffit of Slab/


21 1.6 1.5
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 22+750 Culvert No. 75 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰20.945'


88⁰29.116'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 3.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 22+845 Culvert No. 76 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.005'


88⁰29.102'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.6

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) RHS side chocked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 23+065 Culvert No. 77 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.351737


88.484574
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.7

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.35 0.35
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Chocked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 23+250 Culvert No. 78 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.209'


88⁰29.063'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.6/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 23+450 Culvert No. 79 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.306'


88⁰29.047'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 3.1 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.3 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Rcc NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) RHS Side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 23+600 Culvert No. 40 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.387'


88⁰29.032'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.6 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 23+600 Culvert No. 40 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.387'


88⁰29.032'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 24+050 Culvert No. 82 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.616'


88⁰29.031
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X3.5 1X3.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X4 1X4
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.6/4/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 3.1

Vertical Clearance (GL to Soffit of Slab/


21 2.7 2.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair na

35 Condition of Parapet Fair Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 24+095 Culvert No. 83 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.360693


88.484133
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 24+290 Culvert No. 84 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.744'


88⁰29.070'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.2 1X1.2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.4 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 24+325 Culvert No. 85 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark


27⁰21.760
1 GPS Coordinate @Structure center 88⁰29.076'

2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 24+400 Culvert No. 86 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰21.797'


88⁰29.092'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 2

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 24+775 Culvert No. 86 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.366521


88.485342
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.15 0.15

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.45 0.35
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 25+100 Culvert No. 88 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.369402


88.485602
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.6 0.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 25+235 Culvert No. 90 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.370205


88.486012
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.5 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : 15/06/2019

Location (Km) 25+500 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 91

S.N. Description L.H.S. R.H.S. Remark


27.3725537
1 GPS Coordinate @Structure center
88.487507

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow NV

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5.5 5.5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 6.5 6.5

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NP NP

19 Condition of Pipe Covered with Bushes Covered with Bushes

Recorded by ............................ Checked by ............................


(Name & Signature) Page 1 of 6 (Name & Signature)
20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway Inadequate Inadequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure

Sketch of Culvert

Recorded by ............................ Checked by ............................


(Name & Signature) Page 2 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 3 of 6 (Name & Signature)
R ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Remark

Recorded by ............................ Checked by ............................


(Name & Signature) Page 4 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 5 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 6 of 6 (Name & Signature)
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 25+700 Culvert No. 92 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.373872


88.488277
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.85 0.55
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Covered with Bushes

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 25+810 Culvert No. 93 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.374317


88.489068
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.06.2019-17.06.2019

Location (Km) 25+925 Culvert No. 94 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.375137


88.49001
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.06.2019-17.06.2019

Location (Km) 26+020 Culvert No. 95 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.3735


88.489732
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 26+080 Culvert No. 96 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.533'


88⁰29.469'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 26+275 Culvert No. 97 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.546'


88⁰29.582'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.4 1.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both side parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 26+500 Culvert No. 98 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.37671


88.493878
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.7
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 26+595 Culvert No. 99 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.596'


88⁰29.694'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1/0.5 0.6/1.0/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 26+725 Culvert No. 100 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.593'


88⁰29.728'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X5.0 1X5.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X5.5 1X5.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 4.3 4.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 26+880 Culvert No. 53 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.635'


88⁰29.788'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.5 1x1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 0.6/1.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 26+975 Culvert No. 102 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.700'


88⁰29.877'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 27+395 Culvert No. 103 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.381953


88.501587
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 27+475 Culvert No. 104 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.382955


88.50231
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1.0 1x1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 27+625 Culvert No. 105 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.896'


88⁰30.169'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X5.4 1X5.4

Span Arrangement (No. x W ) (m) (Exp. -


5 1X6 1X6
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.35 0.35

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 4.65 3.65
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 27+875 Culvert No. 106 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰22.000'


88⁰30.294'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 28+230 Culvert No. 107 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.385018


88.507543
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 28+525 Culvert No. 108 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.181'


88⁰30.603'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 3.1 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.3 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 28+650 Culvert No. 109 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.386818


88.510762
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) Para

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 0.9
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 29+155 Culvert No. 110 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.392'


88⁰30.832'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.8 1X1.8
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 2.2 2.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Broked

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 29+560 Culvert No. 111 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.581'


88⁰30.910'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X2.0 1X2.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2.4 1X2.4
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) 6

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 1/2.4/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 3

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA RCC

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 29+695 Culvert No. 112 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.642'


88⁰30.943'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.4 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 29+770 Culvert No. 113 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.394277


88.5155
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.6 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 29+850 Culvert No. 114 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.395543


88.516048
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1 1X1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any) Both Side Parapet Not Exist

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 29+875 Culvert No. 115 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.716'


88⁰30.978'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X2.6 1X2.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X3.2 1X3.2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 5.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.0/0.5 0.6/1.0/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.7 1.6

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet RCC RCC

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 30+210 Culvert No. 116 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰23.893'


88⁰31.108'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist 2.1

Vertical Clearance (GL to Soffit of Slab/


21 Parapet Not Exist 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA CRSM


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 30+250 Culvert No. 117 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.398693


88.518327
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.8 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.9 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment SM SM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : 15/06/2019

Location (Km) 30+580 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 118

S.N. Description L.H.S. R.H.S. Remark


27.4009
1 GPS Coordinate @Structure center
88.519903

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow R-L

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5 5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 6 6

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 FRL to GL (m) 0.5 0.6

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NP NP

19 Condition of Pipe Covered with Bushes Covered with Bushes


20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Covered with Bushes Covered with Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway adequate adequate

29 Remarks (additional feature details if any)


*Kindly collect photographs for all necessary details on both side of Structure
R ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Remark

Recorded by ............................ Checked by ............................


(Name & Signature) Page 4 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 5 of 6 (Name & Signature)
Recorded by ............................ Checked by ............................
(Name & Signature) Page 6 of 6 (Name & Signature)
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 31+000 Culvert No. 119 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.401


88⁰31.235'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 31+000 Culvert No. 120 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰24.216'


88⁰31.235'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 5.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist 0.6/1/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.2 2.1

Vertical Clearance (GL to Soffit of Slab/


21 1.4 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 31+475 Culvert No. 121 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.405023


88.521847
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X3.0 1X3.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X3.5 1X3.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 31+550 Culvert No. 122 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰24..331


88⁰31.244'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X3.0 1X3.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X3.5 1X3.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.35 1.25
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 31+800 Culvert No. 123 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰24..451'


88⁰31.127'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X5.0 1X5.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X5.5 1X5.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 5.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5.5/0.5 0.6/5.5/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.1 2.1

Vertical Clearance (GL to Soffit of Slab/


21 1.2 1.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 31+870 Culvert No. 124 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.408063


88.518695
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.6 0.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 32+625 Culvert No. 125 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰24..857'


88⁰30.922'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1 1x1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 32+840 Culvert No. 126 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰24..967'


88⁰30.919'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1 1x1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 11

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/1.5/0.5 0.6/1.5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 3.1 3.1

Vertical Clearance (GL to Soffit of Slab/


21 2.3 2.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 33+075 Culvert No. 127 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25..076'


88⁰30.940'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1 1x1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.3 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 NA NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway Adequate Adequate

42 Remarks (additional feature details if any)

Photographs For All Necessary Details Of Slab/Box/Arch Culvert


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 33+300 Culvert No. 128 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25.284'


88⁰30.930'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.7 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.9 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 33+640 Culvert No. 129 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25.379'


88⁰30.895'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.7 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.9 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 33+740 Culvert No.130 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25.412'


88⁰30.833'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.7 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.85 1.75
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 33+990 Culvert No. 131 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25..543


88⁰30.834'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 8.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) 7.5

16 Total Outer Width 8.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/2/0.5 0.6/2/0.5
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.7 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.85 1.75
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 34+285 Culvert No. 132 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.428272


88.51431
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.5 1X1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 6

Inner Width from Parapet to Parapet(m) Parapet not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet not Exist Parapet not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet not Exist Parapet not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.4 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet not Exist Parapet not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth No No

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 34+460 Culvert No.134 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25..743'


88⁰30.898'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x4.5 1x4.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1x5 1x5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 5.6 4.6

Vertical Clearance (GL to Soffit of Slab/


21 5.75 4.75
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 34+680 Culvert No.135 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.406174


88.521328
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x0.6 1x0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1x1 1x1
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

15 Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 34+920 Culvert No. 136 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰25..996'


88⁰30.883'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1x2 1x2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 10

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 5.6 4.6

Vertical Clearance (GL to Soffit of Slab/


21 5.75 4.75
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS ( Singtam to Dikchu)

Project Name : Singtam To dikchu Date : 15/06/2019

Location (Km) 35+100 Purpose of Culvert : Pipe Culvert


(Functional Requirement)
Structure No. 137

S.N. Description L.H.S. R.H.S. Remark


27.434852
1 GPS Coordinate @Structure center
88.51479

2 Type of Culvert: Hume Pipe or Siphon Hume Pipe Hume Pipe

3 Number of Pipes 1 1

4 Diameter of Pipe(s) (m) 0.9 0.9

5 Thickness of Pipe 0.09 0.09

Inner Dimension of Chamber, in case of


6 NA NA
Siphon (LxBxH)

7 Direction of Flow R-L

8 Length of Head Wall NA NA

9 Carriageway Width (m) 5 5

Inner Width from C/L of CW to Parapet


10 Parapet Not Exist Parapet Not Exist
(m)

11 Total Outer Width 6 6

12 Skew Angle (Straight / Inclined Width) None

13 Height of Parapet above FRL (m) Parapet Not Exist Parapet Not Exist

14 FRL to GL (m) 1.1 1

15 Pipe Top to Parapet Top (m) Parapet Not Exist Parapet Not Exist

Thickness of Headwall or Chamber (in


16 NA NA
case of Siphon)

17 Material of Headwall/ Chamber NA NA

18 Condition & Details of Protection Works NA NA

19 Condition of Pipe Poor Poor


20 Condition of Head Wall NA NA

21 Condition of Parapet Parapet Not Exist Parapet Not Exist

Details of Pitching (Slope in terms of horizontal


22 NA NA
length & vertical height, Material)

23 Condition of Pitching NA NA

24 Details of Vegetation Growth Minor Bushes Minor Bushes

25 Whether Choked No No

Details of any Scour on Upstream or


26 No No
Downstream

27 Stream Characteristics Undefined Undefined

28 Adequacy of Waterway adequate adequate

29 Remarks (additional feature details if any) Both Side Parapet Damaged


INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 35+525 Culvert No. 138 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰26.297'


88⁰30.866'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1 1x1

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 10

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.1

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 36+090 Culvert No. 139 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰26..512'


88⁰30.873'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 10

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 26+180 Culvert No. 140 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.44206


88.515522
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.4 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 36+365 Culvert No. 141 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰26.644'


88⁰30.967'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 5.5

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 36+715 Culvert No. 142 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰26..787'


88⁰31.967'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 10

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 36+765 Culvert No. 143 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.446798


88.519173
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1x1.5 1x1.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X2 1X2
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.25 0.25

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) 6.5

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 1.6 Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC NA


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 36+955 Culvert No. 144 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰26..893


88⁰31.184'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X2.5 1X2.5

Span Arrangement (No. x W ) (m) (Exp. -


5 1X3 1X3
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.3 0.3

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 10

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 37+720 Culvert No. 145 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.452887


88.521445
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 9

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 9

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : 9.01.2018-17.01.2018

Location (Km) 37+765 Culvert No. 146 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰27..196'


88⁰31.303'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Not exist Not exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Not exist Not exist

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet NA NA
Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 37+875 Culvert No. 147 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰27..249'


88⁰31.313'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 12

14 Carriageway Width (m) 7

Inner Width from Parapet to Parapet(m) 11

16 Total Outer Width 12

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 0.6/5/0.5 0.6/5/0.6
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) 2.6 2.6

Vertical Clearance (GL to Soffit of Slab/


21 1.8 1.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet RCC RCC


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet Fair Fair

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 38+210 Culvert No. 148 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.456382


88.520533
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.8 0.8
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 38+750 Culvert No. 149 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27⁰27..487'


88⁰31.357'
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6

14 Carriageway Width (m) 5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 1.7 1.7
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 38+846 Culvert No. 150 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.459


88.52292
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.3
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 38+865 Culvert No. 151 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.459157


88.52295
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 39+025 Culvert No. 152 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.460527


88.523167
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X1.0 1X1.0

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.5 1X1.5
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 6.5

14 Carriageway Width (m) 5.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 6.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.3 0.2
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 39+075 Culvert No. 153 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.438825


88.519817
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.6 0.4
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert
INVENTORY AND CONDITION SURVEY FOR ARCH/ SLAB/ BOX CULVERTS
( Sikkim Singtam to Dikchu ) Road, Length-86 km)

Project Name : Singtam to Dikchu NH No : 1 Date : Jun-19

Location (Km) 39+270 Culvert No. 154 Design CH: -------------

Proposal as per I & C Survey : Purpose of Culvert :For cross drainage


(Functional Requirement)

S.N. Description L.H.S. R.H.S. Remark

1 GPS Coordinate @Structure center 27.462613


88.523467
2 Type of Culvert: Slab/ Box/ Arch SLAB SLAB

3 Number of Spans 1 1

4 Span Arrangement (No. x W ) (m) (Clear) 1X0.6 1X0.6

Span Arrangement (No. x W ) (m) (Exp. -


5 1X1.0 1X1.0
Exp. Joint)
Span Arrangement (No. x a x b) (m)
6 NA NA
(for RCC Box)

7 Thickness of Slab or Rib (for Arch) (m) 0.2 0.2

8 d / e / f / g (for RCC Box) (m) NA NA

Pier Thickness (Top) NA NA


9
Pier Thickness (Bottom) NA NA

10 Wearing Coat type & thickness (mm) Bitumen coat

11 Skew Angle (Straight / Inclined Width) No

12 Direction of Flow Right to Left

13 Width of Culvert (Old + New) 0 7.5

14 Carriageway Width (m) 6.5

Inner Width from Parapet to Parapet(m) Parapet Not Exist

16 Total Outer Width 7.5

17 Horizontal Curve / Vertical Gradient Not Exist

Height/ Length/ Thickness of Parapet or


18 Parapet Not Exist Parapet Not Exist
Railling (m)
Height/ Length/ Thickness of Crash
19 Not exist Not exist
Barrier (m)

20 Parapet Top to GL (m) Parapet Not Exist Parapet Not Exist

Vertical Clearance (GL to Soffit of Slab/


21 0.7 0.6
Box/ Arch)

22 Details of Approach Slab (if any) Not exist Not exist

Details of Return/ Wing/ Retaining Wall


23 Retaining wall Not exist
(if any)

24 Material of Slab/ Box/ Arch RCC RCC

25 Material of Pier / Abutment CRSM CRSM

26 Material of Parapet Parapet Not Exist Parapet Not Exist


Material of Return/ Wing/ Retaining Wall
27 CRSM NA
(if any)

28 Fill over Structures (For Arch) NA NA

29 Condition & Details of Protection Works NA NA

30 Condition & Details of Drainage System Not exist Not exist

31 Condition & Details of Weep Holes Not Exist Not Exist

32 Condition of Slab/ Box/ Arch Fair Fair

33 Condition of Pier / Abutment Fair Fair

34 Condition of Return/ Wing/ Retaining Wall Fair NA

35 Condition of Parapet NA NA

36 Details of Vegetation Growth Minor grass Minor grass

37 Whether Choked No No

38 Details & Condition of pitching (if any) Not found Not found

Details of any Scour on Upstream or


39 Not observed Not observed
Downstream

40 Stream Characteristics Not defined Not defined

41 Adequacy of Waterway adequate adequate

42 Remarks (additional feature details if any)


Photographs For All Necessary Details Of Slab/Box/Arch Culvert