ROCKS - Road Costs Knowledge System

Road Works Composition


Version 2.3, 12/12/06

The World Bank


Roads and Highways Thematic Group

Disclaimer
The World Bank provides no warranty in terms of correctness, accuracy, currentness
reliability or otherwise regarding the database. The user relies on the products
of the software and the results solely at his or her own risk. In no event will the
World Bank or anyone else who has been involved in the creation of this product
be liable for its application or misapplication in the field. The World Bank reserves the
right to make revisions and changes from time to time without obligation to notify any
person of such revisions and changes.

Instructions
This workbook contains the average road works composition of a series of road works
computed using the ROCKS GLOBAL Database.

View and/or print the corresponding tables using the Excel tools.
Road Costs Knowledge System - Typical Road Works Costs Composition

Periodic Maintenance and Rehabilitation Works


Periodic Maintenance Rehabilitation
Concrete Bituminous
Pavement Pavement Surface Asphalt Concrete
Gravel Preventive Preventive Treatment Mix Pavement Reconstruction
Grading Resurfacing Treatment Treatment Resurfacing Resurfacing Strengthening Restoration Earth Gravel Bituminous Concrete
Mobilization (%) 0% 8% 0% 0% 0% 4% 2% 9% 0% 8% 5% 4%
Demolition and Site Clearance (%) 0% 6% 0% 0% 4% 2% 1% 5% 0% 2% 3% 4%
Earthworks (%) 0% 11% 0% 0% 2% 2% 2% 8% 0% 29% 8% 15%
Drainage, P Works ,Culv. & Min. Bridges (%) 0% 20% 0% 0% 0% 4% 5% 8% 0% 26% 11% 4%
Major Bridges and Structures (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 4% 8%
Accesses and Junctions (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Pavement Courses (%) 0% 50% 0% 51% 73% 70% 66% 51% 0% 27% 56% 60%
Shoulder Works (%) 0% 0% 0% 0% 7% 9% 14% 0% 0% 0% 2% 0%
Line Markings and Signs (%) 0% 2% 0% 49% 12% 6% 4% 8% 0% 0% 5% 0%
Environment (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 2% 0% 0%
Dayworks (%) 0% 0% 0% 0% 0% 0% 1% 0% 0% 2% 1% 1%
Other (%) 0% 1% 0% 0% 0% 1% 1% 3% 0% 3% 2% 4%
Contingencies (%) 0% 2% 0% 0% 2% 3% 6% 9% 0% 2% 1% 0%
Total (%) 0% 100% 0% 100% 100% 100% 100% 100% 0% 100% 100% 100%
Number of Observations 0 16 0 2 13 40 24 1 0 5 82 1

Improvement Works
Improvement
Partial Partial Widening
Widening and Reconstruction Widening
to to to to to to Adding Adding Adding Adding Adding Adding
Gravel 2L Bituminous 2LConcrete 2L Gravel 2L Bituminous 2LConcrete 2LBituminous 1LConcrete 1LBituminous 2LConcrete 2LBituminous 4LConcrete 4L
Mobilization (%) 0% 0% 0% 0% 0% 0% 3% 0% 1% 0% 0% 0%
Demolition and Site Clearance (%) 0% 4% 0% 0% 0% 0% 0% 0% 22% 0% 0% 0%
Earthworks (%) 0% 5% 0% 0% 0% 0% 23% 0% 0% 0% 0% 0%
Drainage, P Works ,Culv. & Min. Bridges (%) 0% 15% 0% 0% 0% 0% 31% 0% 12% 0% 0% 0%
Major Bridges and Structures (%) 0% 0% 0% 0% 0% 0% 7% 0% 0% 0% 0% 0%
Accesses and Junctions (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Pavement Courses (%) 0% 64% 0% 0% 0% 0% 33% 0% 56% 0% 0% 0%
Shoulder Works (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Line Markings and Signs (%) 0% 13% 0% 0% 0% 0% 1% 0% 7% 0% 0% 0%
Environment (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Dayworks (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Other (%) 0% 0% 0% 0% 0% 0% 2% 0% 3% 0% 0% 0%
Contingencies (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Total (%) 0% 100% 0% 0% 0% 0% 100% 0% 100% 0% 0% 0%
Number of Observations 0 1 0 0 0 0 1 0 1 0 0 0

Page 2 of 3
Road Costs Knowledge System - Typical Road Works Costs Composition

Improvement Works
Improvement

Widening and Reconstruction Upgrading


Adding Adding Adding Adding Adding Adding to to to to to
Bituminous 1LConcrete 1LBituminous 2LConcrete 2LBituminous 4LConcrete 4L Earth 2L Gravel 2L Block 2L Bituminous 2LConcrete 2L
Mobilization (%) 1% 0% 2% 0% 0% 0% 0% 0% 2% 6% 0%
Demolition and Site Clearance (%) 0% 0% 1% 0% 0% 0% 0% 0% 1% 2% 0%
Earthworks (%) 16% 0% 11% 0% 6% 0% 0% 27% 10% 16% 0%
Drainage, P Works ,Culv. & Min. Bridges (%) 7% 0% 18% 0% 31% 0% 0% 15% 19% 10% 0%
Major Bridges and Structures (%) 17% 0% 3% 0% 0% 0% 0% 0% 0% 3% 0%
Accesses and Junctions (%) 0% 0% 1% 0% 0% 0% 0% 0% 0% 0% 0%
Pavement Courses (%) 48% 0% 52% 0% 47% 0% 0% 42% 66% 51% 0%
Shoulder Works (%) 0% 0% 2% 0% 0% 0% 0% 0% 0% 0% 0%
Line Markings and Signs (%) 11% 0% 4% 0% 1% 0% 0% 0% 1% 2% 0%
Environment (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0%
Dayworks (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Other (%) 1% 0% 1% 0% 0% 0% 0% 5% 2% 5% 0%
Contingencies (%) 0% 0% 5% 0% 14% 0% 0% 11% 0% 4% 0%
Total (%) 100% 0% 100% 0% 100% 0% 0% 100% 100% 100% 0%
Number of Observations 4 0 18 0 2 0 0 2 10 15 0

New Construction Works


New Construction
New 1L Road New 2L Highway New 4L Highway New 4L Expressway
Earth 1L Gravel 1L Bituminous 1LConcrete 1L Earth 2L Gravel 2L Bituminous 2LConcrete 2LBituminous 4LConcrete 4LBituminous 4LConcrete 4L
Mobilization (%) 0% 0% 0% 0% 0% 0% 23% 0% 0% 0% 1% 0%
Demolition and Site Clearance (%) 0% 0% 0% 0% 0% 0% 2% 0% 0% 0% 0% 0%
Earthworks (%) 0% 0% 0% 0% 0% 0% 29% 0% 19% 0% 8% 0%
Drainage, P Works ,Culv. & Min. Bridges (%) 0% 0% 0% 0% 0% 0% 9% 0% 4% 0% 49% 0%
Major Bridges and Structures (%) 0% 0% 0% 0% 0% 0% 0% 0% 17% 0% 19% 0%
Accesses and Junctions (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Pavement Courses (%) 0% 0% 0% 0% 0% 0% 29% 0% 46% 0% 11% 0%
Shoulder Works (%) 0% 0% 0% 0% 0% 0% 2% 0% 0% 0% 0% 0%
Line Markings and Signs (%) 0% 0% 0% 0% 0% 0% 0% 0% 1% 0% 2% 0%
Environment (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0%
Dayworks (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1% 0%
Other (%) 0% 0% 0% 0% 0% 0% 6% 0% 12% 0% 0% 0%
Contingencies (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 7% 0%
Total (%) 0% 0% 0% 0% 0% 0% 100% 0% 100% 0% 100% 0%
Number of Observations 0 0 0 0 0 0 2 0 1 0 29 0

Number of lanes: 1L - One Lane 2L - Two Lane 4L - Four Lane 6L - Six Lane

Page 3 of 3