1.fire Detection and Alarm System Cables Installation Verification
1.fire Detection and Alarm System Cables Installation Verification
1.fire Detection and Alarm System Cables Installation Verification
1.0 Fire Resistant/fire rated cable & accessories material verification is cleared Signed MV Document
2.0 Validate the following for the fire rated (FR) cables from devices to device:- -
2.2 Cables clips/saddles provided in regular intervals from device to device. OEM procedure
Indoor - Plastic & Outdoor -
2.3 Cables identification tag at devices end
Stainless Steel
2.4 Minimum bending radius OEM procedure
4.0 Validate the availability of conduit pipe for the following places:- -
6.0 Unused gland holes closed by dummy covers for device enclosures -
7.1 Wall -
7.2 Floor -
7.3 Ceiling -
8.0 No earthing of fire rated cable at the devices/cabinets/loop IN/OUT connections OEM procedure
9.0 Fire rated cables are wounded and supported at celling/ floor void Extended cables
☐ Can proceed to Cable IR test. ☐ Rejected, Re-site visit required to clear the pending points.
Comments if Any:-
© DEWA/TP/TCD
TRANSMISSION POWER DIVISION
TRANSMISSION COMMISSIONING DEPARTMENT
TP/TCD/FPS/I/MKE/ * Basement Floor Fire Detection and Alarm system Cables Installation Verification Issue.1/ Rev.0
1.0 Fire Resistant/fire rated cable & accessories material verification is cleared Signed MV Document
2.0 Validate the following for the fire rated (FR) cables from devices to device:- -
2.2 Cables clips/saddles provided in regular intervals from device to device. OEM procedure
Indoor - Plastic/Stainless
2.3 Cables identification tag at devices end
Steel & Outdoor - Stainless
2.4 Minimum bending radius OEM procedure
4.0 Validate the availability of conduit pipe for the following places:- -
6.0 Unused gland holes closed by dummy covers for device enclosures -
7.1 Wall -
7.2 Floor -
7.3 Ceiling -
8.0 No earthing of fire rated cable at the devices/cabinets/loop IN/OUT connections OEM procedure
9.0 Fire rated cables are wounded and supported at celling/ floor void Extended cables
☐ Can proceed to Cable IR test. ☐ Rejected, Re-site visit required to clear the pending points.
Comments if Any:-
© DEWA/TP/TCD
TRANSMISSION POWER DIVISION
TRANSMISSION COMMISSIONING DEPARTMENT
TP/TCD/FPS/I/MKE/ * First Floor Fire Detection and Alarm system Cables Installation Verification Issue.1/ Rev.0
1.0 Fire Resistant/fire rated cable & accessories material verification is cleared Signed MV Document
2.0 Validate the following for the fire rated (FR) cables from devices to device:- -
2.2 Cables clips/saddles provided in regular intervals from device to device. OEM procedure
Indoor - Plastic/Stainless
2.3 Cables identification tag at devices end
Steel & Outdoor - Stainless
2.4 Minimum bending radius OEM procedure
4.0 Validate the availability of conduit pipe for the following places:- -
6.0 Unused gland holes closed by dummy covers for device enclosures -
7.1 Wall -
7.2 Floor -
7.3 Ceiling -
8.0 No earthing of fire rated cable at the devices/cabinets/loop IN/OUT connections OEM procedure
9.0 Fire rated cables are wounded and supported at celling/ floor void Extended cables
☐ Can proceed to Cable IR test. ☐ Rejected, Re-site visit required to clear the pending points.
Comments if Any:-
© DEWA/TP/TCD
TRANSMISSION POWER DIVISION
TRANSMISSION COMMISSIONING DEPARTMENT
TP/TCD/FPS/I/MKE/ * Fire Pump Room Fire Detection and Alarm system Cables Installation Verification Issue.1/ Rev.0
2.0 Fire Resistant/fire rated cable & accessories material verification is cleared Signed MV Document
3.0 Validate the following for the fire Rated (FR) cables from devices to device:- -
3.2 Cables clips/saddles provided in regular intervals from device to device. OEM procedure
Indoor - Plastic/Stainless
3.3 Cables identification tag at devices end
Steel & Outdoor - Stainless
3.4 No power cables along with fire resistant/fire rated cable OEM procedure
5.0 Validate the availability of conduit pipe for the following places:- -
7.0 Unused gland holes closed by dummy covers for device enclosures -
8.1 Wall -
8.2 Floor -
8.3 Ceiling -
9.0 No earthing of fire rated cable at the devices/cabinets/loop IN/OUT connections OEM procedure
10.0 Fire rated cables are wounded and supported at celling/ floor void Extended cables
☐ Can proceed to Cable IR test. ☐ Rejected, Re-site visit required to clear the pending points.
Comments if Any:-
© DEWA/TP/TCD
TRANSMISSION POWER DIVISION
TRANSMISSION COMMISSIONING DEPARTMENT
TP/TCD/FPS/I/MKE/ * Security Room Fire Detection and Alarm Cables Installation Verification Issue.1/ Rev.0
2.0 Fire Resistant/fire rated cable & accessories material verification is cleared Signed MV Document
3.0 Validate the following for the fire Rated (FR) cables from devices to device:- -
3.2 Cables clips/saddles provided in regular intervals from device to device. OEM procedure
Indoor - Plastic/Stainless
3.3 Cables identification tag at devices end
Steel & Outdoor - Stainless
3.4 No power cables along with fire resistant/fire rated cable OEM procedure
5.0 Validate the availability of conduit pipe for the following places:- -
7.0 Unused gland holes closed by dummy covers for device enclosures -
8.1 Wall -
8.2 Floor -
8.3 Ceiling -
9.0 No earthing of fire rated cable at the devices/cabinets/loop IN/OUT connections OEM procedure
10.0 Fire rated cables are wounded and supported at celling/ floor void Extended cables
☐ Can proceed to Cable IR test. ☐ Rejected, Re-site visit required to clear the pending points.
Comments if Any:-