LIST OF STARTUP SOP AND CHECK LIST IN ECTS PLANT

Sr No Description of System
1 OWS system operation up to equilizationtank
2 OWS system operation from flash mixer feed pump to ACT inlet
3 ACT operation
4 SBR operation
5 CRWS: Operation
6 CRWS: DMF & ACF back wash
7 CRWS: Treated CRWS transferring to RW reservoir
8 Spent caustic treatment system operation
9 H2O2 dosing system line up and dosing
10 HCl dosing system line up and dosing
11 20% Caustic receiving and line up for dosing
12 Urea & DAP solution preparation and dosing
13 Slop oil collection and transferring
14 HCl tanker unloading
15 H2O2 tanker unloading
16 HCl transferring from main storage tank to dosing tanks
17 Sanitary system operation
18 Bio-remediation system operation

RO pre-treatment system operation (Feed collection tank to UF inlet)


19
20 UF operation & backwash
21 UF maintenance & recovery clean procedure
22 RO-I operation (RO-I feed tank to RO-I permeate tank)
23 RO-I clean up procedure
24 RO-II operation
25 RO-II clean up procedure
26 RO-III operation
27 RO-III clean up procedure
28 RO-I permeate transfer to Cooling tower / RO-II permeate tank
29 Dolomite, Lime and Poly solution preparation and dosing
30 Mixed Bed (MB) operation
31 Mixed Bed (MB) re-generation
32 DMW transferring to DM plant storage tank
33 Waste disposal system operation
34 Waste disposal system: PSF & ACF backwash
35 Centrifuge operation
36 GBT operation
Attendance
Date Shif Clock In Clock Out Status
05.04.2019 C 0:00:00 23:01:00 A
06.04.2019 C 7:16:00 23:00:00 A
07.04.2019 C 7:22:00 23:00:00 A
10.04.2019 A 0:00:00 15:21:00 A
11.04.2019 B 15:25:00 23:25:00 A
13.04.2019 C 0:00:00 23:03:00 A
14.04.2019 C 7:17:00 23:00:00 A
24.05.2019 C 7:22:00 23:00:00 A
22.06.2019 A 0:00:00 15:22:00 A

23.07.2019 A 0:00:00 0:00:00 A

26.07.2019 C 0:00:00 23:13:00 A


27.07.2019 C 7:20:00 23:02:00 A
31.07.2019 A 0:00:00 15:55:00 A
03.08.2019 C 0:00:00 23:09:00 A
04.08.2019 C 7:24:00 23:13:00 A
07.08.2019 A 15:25:00 6:59:00 A
08.08.2019 A 15:27:00 0:00:00 A
11.08.2019 C 0:00:00 23:06:00 A
12.08.2019 C 7:25:00 23:07:00 A
16.08.2019 A 0:00:00 0:00:00 A
27.08.2019 C 0:00:00 0:00:00 A
28.08.2019 C 0:00:00 0:00:00 A
31.08.2019 A 15:02:00 23:35:00 A
01.09.2019 A 0:00:00 0:00:00 A
19.09.2019 GEN 0:00:00 0:00:00 A
14.10.2019 GEN 9:00:00 0:00:00 A
REMARKS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Regulirization applied

Leave was applied and approved for 23.07.2019 ,but leave


showing on 24.07.2019 .I was present on 24.07.2019 and
punch in/out and leave both are showing in samarth on
24.09.2019.

Punch in/out showing OK as per shift in LAMS


Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Punch in/out showing OK as per shift in LAMS
Leave applied
Leave applied
Leave applied
Shif change to be done (B Shif)
Leave applied
Leave applied
Regulirization applied