Observation (Write 01
(Write 01 in respective Name of the Area In-
below in respective column)
Sr. Description of the Safety Observation column) Exact location of the safety charge (where the
No. (SO) observation safety observation was
noticed)
At Risk Unsafe
H M L
Behaviour Condition
1 2 3 4 5 6 7 8 9
3 1 Security guard without reflective vests 1 Train yard track no. 1 Baldev Singh
4 1 PCS labour without safety shoes. 1 Train yard track no. 2 Munish Kumar
12 1 Light bulb required near oil gate. 1 Edible oil gate Tejinder Singh
Work at height being conducted
13 1 1 ICD entrance point Tejinder Singh
without permit.
TOTAL 8 20 7 12 9
Instruction:
1) Safety Observation shall be identified by Project EHS Coordinator on daily basis. UH and TM/FH can also submit their Safety observations to Site EHS Coordinator.
2) It shall be the responsibility of the Area in-charge to correct and implement CAPA for the Safety Observation.
3) Site EHS Coordinator shall support and coordinate with the Area / Block in-charge in implementing the CAPA.
4) Site EHS Coordinator shall submit the Safety observation status to respective UH, Corp. EHS team and send on weekly basis.
5) Resources required to correct the Safety observation shall be provided by the UH.
Note: High risk means- Chances of Fatality (Red); Medium risk means- Chances of LTI/MTI (Orange); Low risk means- Chances of First aid (Yellow). FOR HIGH RISK WORK TO B
6) Non-compliance by contractors should attract penalty as applicable for the project.
7) Habitual negligence on the part of our employees would need to be addressed, initially at UH/TM level .
8) Site EHS Coordinator should present a update during safety committee meeting to the entire site team on closures effected in the previous week and any open issues requiring
ervations (SO) at site -2017-18
d
Whether
repeat Safety
Safety observation
Observation
carried out by
(Write 01 in Whether
Name of the (Write 01 in Date of safety
respective Correction Give details of the correction carried CAPA planned to avoid
Contractor respective column) observation (in
Column) carried out out to control the SO reoccurence
involved dd/mm/yy)
(Yes/ No)
TM/F
UH EHS-C Yes No
H
10 11 12 13 14 15 16 17 18 19
Harpreet Services 1 11.09.2017 1 NO Clearing waste oil that is on ground. Proper inspection of edible oil
decanting pipes after its use.
Entrance or walkway to be
Periodic Cleaning plan to be
PMLPPL 1 14.09.2017 1 YES cleared off grass for preventing made
any snake movement.
Dustbin to be provided at weigh-
Trainings and periodic
PMLPPL 1 14.09.2017 1 NO bridge for proper disposal of inspection
waste.
Open Closed
Date
H M L H M L
20 21 22 23 24 25 26
1 15.09.2017
1 Immediate
1 Immediate
1 Immediate
1 Immediate
1 Immediate
1 13.09.2017
1
12.09.2017
1
12.09.2017
1
Immediate
1
16.09.2017
1
Immediate
1
1
16.09.2017
1
Immediate
1
Immediate
1
16.09.2017
1 6 5 6 6 4
Real timeOpen
Observed by Closed
status of the Safety O bservations (SO ) at Site -2017-18
PH DPH EHS High Medium Low High Medium Low
20
0 8 20 1 6 5 6 6 4
20
18
16
14
12
10
8
8
6 6 6
6 5
4
4
2 1
0
0
PH DPH EHS High Medium Low High Medium Low
Observed by Open Closed
um Low
ed