This inspection checklist summarizes the requirements for earthing installation on Project: Corridor VI Section II. It includes requirements for conducting material, installation, and connections. The inspector is to check off "yes", "no", or provide observations for 19 items regarding the delivered material meeting standards, the installation matching approved designs, and connections being made according to technical drawings for different earthing components. Upon completion, the inspector signs and dates the checklist.
This inspection checklist summarizes the requirements for earthing installation on Project: Corridor VI Section II. It includes requirements for conducting material, installation, and connections. The inspector is to check off "yes", "no", or provide observations for 19 items regarding the delivered material meeting standards, the installation matching approved designs, and connections being made according to technical drawings for different earthing components. Upon completion, the inspector signs and dates the checklist.
This inspection checklist summarizes the requirements for earthing installation on Project: Corridor VI Section II. It includes requirements for conducting material, installation, and connections. The inspector is to check off "yes", "no", or provide observations for 19 items regarding the delivered material meeting standards, the installation matching approved designs, and connections being made according to technical drawings for different earthing components. Upon completion, the inspector signs and dates the checklist.
ELEMENT: ELEVATION: TICK THE APPLICABLE RESPONSE *CIRCLE THE APPLICABLE RESPONSE If a requirement is not applicable, write N/A CONDUCTING MATERIAL REQUIREMENT YES NO OBSERVATION 1. Is the delivered material according to MSS No. 138? (Steel strip 40x4mm galvanized with a zinc coating of 70μm from FCZ 11 Oktomvri/ MetalNet) 2. Delivery ticket of the conducting material? ― ― 3. *Visual inspection for damage and corrosion Damage: YES / NO performed on the delivered material? Corrosion: YES / NO INSTALLATION REQUIREMENT YES NO OBSERVATION 4. Has the design for the earthing system for this structure/object been submitted and approved by the Engineer? 5. Drawing number specifying the earthing ― ― Drawing no: measurements? 6. Has the earthing installation been executed according to the design for this element? 7. Cover in concrete? (Galvanisation not required if ― ― Cover: concrete cover >50mm) 8. Inside the ballast prism will the earthing conductor interfere with track maintenance? 9. Outside the ballast prism has the earthing conductor been placed 20cm below the ground surface? 10. [If under the pavement, concrete or asphalt] Has the earthing conductor been placed into a pipe to allow future inspection and replacement? CONNECTION REQUIREMENT YES NO OBSERVATION 11. *Connection between railway earthing conductors? ― ― Welded / Cross clamps ED6417 12. [Only for cross clamps] According to ED6417? 13. *Connection between railway earthing conductor ― ― Welded / Tied with wires and reinforcement? 14. [Only for welding] Each weld: total min. length 100mm, min. thickness 4mm, connected to different reinforcing bars? 15. [Only for wires] Max. interval of wire ties 30mm? 16. Connection with formwork executed with Variant A ― ― (screwed) or Variant B (nailed) from ED5414? (If Variant B, threaded hole must be sealed) 17. [Only for ED6409-6] Executed as per drawing ED6409-6? 18. [Only for ED6409-8] Executed as per drawing ED6409-8? 19. [Only for ED6409-8] Copper cable free from obstructions? ED refers to earthing drawings from Appendix 3 of the Technical Requirements