Project: Corridor VI Section II Revision 01

Contractor’s Inspection Checklist Page 1 of 1

Concrete Placement RFI(S) No.

STRUCTURE: LOCATION: DATE:


ELEMENT: ELEVATION:

CONCRETE PLACEMENT YES NO OBSERVATIONS


1. Is there a site manager? Name:
2. Concrete supplier? Name:
3. Concrete project available on site?
4. Cubes required by the Concrete Project? Cubes:
Cubes for resistance against freezing?
5. Concrete type? MB M V
3
6. Quantity placed? M placed
7. Air Temp. 5°C < T <30°C?
8. Weather Sunny/Clear/Cloudy/Rain/Snow
9. Wind Still/Breeze/Moderate/High/Storm
10. Method of placing?
11. Diameter of needle:
Compaction equipment?
No.:
12. Is the free fall of concrete from Bucket/Pump
less than 1.5m?
13. Has the concrete been properly compacted? Thickness of layer:
14. Curing method? Duration (days):
Frequency(hours):
15. Is the concrete covered during curing? Material:
16. Additives used in concrete? Additive used:
17. Is the construction joint prepared if there is a
break in the concreting?

1 2 3 4 5 6 7 8
Delivery Arrival of Start of End of Volume Concrete Slump (cm) Cubes
Ticket No. mixer Placement Placement Placed (m3) Temp. °C taken

Name of Inspector: Signature: Date: