1.

C07 is the approved form of security furnished by the Contractor as a guarantee of good
faith on the part of the contractor to execute the work in accordance with the terms of the
Contract. PERFORMANCE BOND
2. C09 Which of the following conditions is NOT TRUE in Design-Build Services on
Guaranteed Maximum Cost?
3. CO3 Fire involving flammable liquids and gases is classified as? CLASS B
4. C08 SPP Documents replaced the 1979 UAP Doc. 203
5. C07 is the period of effectivity of the Guarantee Bond.
6. C07 In a typical owner-general contractor agreement, which of the following is
7. CO2 What is referred to as construction in an existing building involving change in
materials used, partitioning, location/size of openings but does not increase the overall
area? ALTERATION
8. C06 Mr. Juan Zubiri commissioned you for a restaurant project last year. Due to the
success of the restaurant, he wants you to do a 2nd restaurant using the same design.
What would be your fee? 50% OF BASIC FEE
9. C01 4. Under the Civil Code, how long is the liability of the Architect for the regular
design of structures? 15 YEARS
10. C09 Which of the following conditions:
1Services rendered the same as that of design-build by administration
2. Payment by lump sum according to work progress
3. Architect given a revolving capital by client
4. Saving on project construction cost divided equally between architect and client
11. C08 Should the client hire separately the services of consultant for Architectural Interior,
the fee of the architect is
12. C07 What is meant by Fabricate and Delivered to Site?
13. C07 What should the Architect do if the Owner makes Change Orders?
14. C04 It is the housing program of the government only for the underprivileged and
homeless citizens? COMMUNITY MORTGAGE PROGRAM
15. C04 As per PD 957, what is the maximum block length without an alley? 250 METERS
16. CO2 13.Under the NBC, open spaces for corner and through lots is 10% 15%
17. CO3 For parking areas of PWD, a walkway between the front ends of parked cars shall
have a minimum clear width of 1.20 METERS
18. C08 The Architect in this area of practice must have much more than the basic
knowledge of Specification Writing, Estimation and Quantity Survey, Architectural
Production, ArchitecturalSoftware, Architectural Support Services. CONTRACT
DOCUMENTATION AND REVIEW SERVICES
19. C06 During what stage are the provisions of BP344 adopted?
20. CO3 As per BP 344, what is the minimum size of an elevator car? 800 MM
21. C09 Under the architect's design-build services on a guaranteed maximum cost, which of
the following conditions should be observed?
22. C06 Percentage fee if Owner gets all Contract Documents? 85%
23. CO2 11. Under the NBC, for Group A Dwellings, stairs shall have a minimum width of
750 MM
24. C07 Within what period of time can a contractor, after giving due notice to the
Owner/Architect suspend work or terminate a contract? 15 DAYS
25. CO3 What is the Fire Code of the Philippines? RA NO. 9514
26. CO4 As per PD 957, maximum number of saleable lots?
27. CO4 What is the minimum lot frontage for Rowhouses under PD 957? 4 METERS
28. C09 What is the normal fee for design-build services by administration? seven percent
(7%) of the Project Construction Cost in addition to the Architect's fee for the
Regular Design Services
29. C04 As per BP 220, the maximum length of a block is 400 meters. However, block
lengths exceeding 250 meters should be provided with an alley approximately at
midlength. How wide is the alley? 2 METERS
30. CO2 22. The is what remains when the mas PSO and max ISA is deducted from the Total
Lot Area.
31. C06 At what phase does the Architect prepare the Architectural Layout for Electrical,
Mechanical and Plumbing system? CONTRACT DOCUMENT PHASE
32. CO3 Which is not a Fire Safety Device?
33. CO3 There is a new version of the Fire Code of the Philippines. RA 9514 FIRE CODE
OF THE PHILIPPINES OF 2008
34. C01 5. An Architect can take part in paid advertisement provided he is truly the architect
of the said project.
35. CO5 Three siblings decided to form their own architectural firm. One is an Architect,
another is an Engineer and the last is an Interior Designer. If they are to apply for a
business permit, where should they go? CITY HALL
36. CO3 What is minimum clear width of door as per BP 344? .80 METERS
37. CO5 Three siblings decided to form their own architectural firm. One is an Architect,
another is an Engineer and the last is an Interior Designer. How much should be the
architectural composition of the corporation? 75%
38. C07 The is the penalty for every day of delay in the contract time. LIQUIDATED
DAMAGES
39. CO8 The Architect undertakes the site planning of a project that requires a composite
arrangement of several buildings/ structures and their requisite amenities, facilities,
services and utilities within a natural or built setting SCOPE OF SERVICES
40. C07 Who is responsible for insurance for liabilities on materials, workmanship, labor and
property?
41. CO3 What do you call the portion of a roadway or public way that should be kept opened
and unobstructed at all times FIRE LANE
42. C05 Ana wants to build a resthouse in her lot for Tagaytay. She talked with her friend,
Arch. A, about the project. Ana's daughter also recommended Interior Designer B to her
mom. However, while browsing a magazine, she learned about Architect C, who also
happens to be an Interior Designer at the same time. Why is it best to select Architect C?
SHE CAN BEST INTERPRET THE ARCHITECTURAL DRAWINGS FOR THE
INTERIOR
43. C03 What do you call the space in another building provided just after a horizontal exit
on approximately the same level? MEANS OF EGRESS
44. C04 As per PD 957, minimum lot size for rowhouse? 50 SQM
45. C06 The architect's fee for repetititive housing?
46. C02 20. Setbacks and easements can be waived conditionally.
47. C03 Distance of parking for PWD from building entrance. 60 M
48. C03 Under BP 344, handrails attached to walls should have a minimum clearance from
the wall measuring 50 MM
49. C03 Minimum dimension of an elevator door width? 0.80 METERS
50. C06 At what stage are Specifications done? DESIGN PHASE (CONTRACT
DOCUMENTATION)
51. C03 A circle of 0 out of 1 points in diameter is a suitable guide in the planning of
wheelchair turning spaces.
52. C05 Arch. Casia was commissioned by his friend as the Architect for a Townhouse
Project. He was specifically asked to prepare brochures for the marketing of the project.
For helping his friend market the project, what type of compensation should Arch. Casia
receive? PRE DESIGN SERVICES
53. C06 Which among the following should not be the basis of Architect's fee? CLIENT’S
PROFILE DIRECTORY
54. C04 Where will you have a Subdivision Plan approved? HLURB
55. C05 Ana wants to build a resthouse in her lot for Tagaytay. She talked with her friend,
Arch. A, about the project. Ana's daughter also recommended Interior Designer B to her
mom. However, while browsing a magazine, she learned about Architect C, who also
happens to be an Interior Designer at the same time. If
56.
57. COI 2. Architects are people who are Professionally and qualified to practice
Architecture. Architect" means a person professionally and academically qualified,
registered and licensed.
58. C02 8. Which of the following is not considered in the assessment of building permit
fees? LOT AREA
59. C06 Who is responsible for the fee of an additional Full-time Supervisor at the Project?
OWNER
60. C06 A Client hires an Architect to prepare the Plans and corresponding documents but
changed his mind and did not implement the Plans for construction. How much will the
Client pay the Architect? 85%
61. C08 The suitably trained and experienced Consulting Architect in this area of
architectural practice provides research, assessment, recording, management,
interpretation and conservation of historical heritage. HISTORIC AND HERITAGE
CONSERVATION AND PLANNING
62. C07 In case of discrepancy between drawings and Specifications, the prevails?
SPECIFICATIONS
63. C08 For extensive detailing such as furniture design, built-in equipment and special
fittings, the fee of the Architect is 15% OF PROJECT CONSTRUCTION COST
64. C03 Fires involving combustible materials such as sodium, magnesium, potassium, and
other similar materials are CLASS D
65. C07 Before submitting sketches to a Client, what must the Architect first do? SIGN A
SERVICE AGREEMENT
66. C07 The 1 out of 1 points is the legal bond for Client- Architect
67. C05 Arch. Casia was commissioned by his friend as the Architect for a Townhouse
Project. He was specifically asked to prepare brochures for the marketing of the project.
What type of service did Arch. Casia rendered for the project? PRE-DESIGN
SERVICES
68. C07 Whose responsibility is it to obtain a Certificate of Occupancy upon completion of
the Project? CONTRACTOR
69. C05 If the Owner continuously make changes. what tvoe of compensation should the
architect employ? PERCENTAGE OF CONSTRUCTION COST
70. C05 Three siblings decided to form their own architectural firm. One is an Architect,
another is an Engineer and the last is an Interior Designer. What kind of business
organization will they form? CORPORATION
71. C08 The Consulting Architect in this area of practice places value on the building /
structure condition and defects, and on its repair and maintenance, including the required
improvements. BUILDING APPRAISAL
72. COI 3. The Architect has a duty to God, his country and to HIMSELF
73. COI The is the Law institutionalizing the Architecture profession in the Philippines? RA
9266
74. C02 26. Firewalls are used in lieu of setbacks and easements
75. C02 25. Type of construction which is four- hour fire-resistive throughout and the
structural elements are made of steel, iron, concrete or masonry construction. TYPE IV
BUILDINGS
76. C02 16. The purpose of the NBC is to provide for all buildings and structures, a
framework of standards and requirements which is the PD 1096
77. COI 7. Practice of architecture is a privilege to be enjoyed of all. Q
78. C02 19. Under the NBC, the minimum dimension of court is less than 2.00 meters
79. C02 24. This refers to the percentage of the maximum allowable floor area of any paved,
tiled or hardscaped surface at the ground floor/ grade level in relation to the Total Lot
Area (TLA) MAXIMUM ALLOWABLE ISA
80. C07 For every day of delay in construction time, contractor is obligated to pay the owner.
What do you call this payment?
81. CO3 As per BP 344, what is the distance of the Main building Entrance to the elevator?
30 METERS
82. CO8 The Architect in this area of practice engages in methods of producing building
components in a highly engineered, efficient and cost-effective manner, particularly for
residential and commercial applications BUILDING SYSTEMS DESIGN
83. CO7 Under the owner-contractor agreement, who pays for taxes, licenses, permits and
fees? CONTRACTOR
84. CO6 An Architect makes a minature model of the project for his own design study. Who
should pay for it? ARCHITECT
85. CO2 23. MACA is the combined total of the maximum PSO and maximum ISA
86. CO2 A per PD 957, what is the minimum width for roads right-of-way for residential
condominium projects? 8 METERS
87. CO5 Three siblings decided to form their own architectural firm. One is an Architect,
another is an Engineer and the last is an Interior Designer. Where should they register
their business? SEC
88. CO9 What is the normal fee for design build services on a guaranteed maximum cost?
10% EXCLUDING DESIGN FEE SERVICES
89. CO4 What is the minimum lot frontage of a regular lot for single-detached units as
provided for in BP 220? 8 METERS
90. CO2 18. Cathedrals are exempted from payment of building permit fees TRUE
91. CO8 Architects are compensated by __________ for Planning Services.
92. CO2 9. Which is not a factor in determining the height of buildings and structures?
93. CO1 6. The IAPOA fees are paid every three years
94. CO3 Fire involving flammable liquids and gases is classified as? CLASS B
95. CO2 12. Under the NC exemption from payments of building permit fees shall be granted
to PUBLIC BUILDINGS AND TRADITIONAL INDIGENOUS FAMILY
DWELLING
96. CO5 Ana wants to build a rest house in her lot for Tagaytay. She talked with her friend,
Arch. A, about the project. Ana’s daughter also recommended Interior Designer B to her
mom. However, while browsing a magazine, she learned about Architect C, who also
happens to be an Interior Designer at the same time. What is the best method for her to
select the designers? COMPARATIVE SELECTION
97. CO3 What is the minimum width for parking slots of PWD? 3.70 METERS
98. CO7 Who owns the Plans? ARCHITECT
99. CO3 What is the preferred design for a stair considering use of crutches?
100. CO2 14. Under the NBC, open spaces required for inside lots is 20%
101. CO2 15. Elevators are not mandatory for all 8-storey building. FALSE
102. Co2 21. Under the NBC, rooms for human habitation shall have a minimum size
of 6 SQM
103. Co2 17. Under the NBC, the vertical distance between landings shall not be more
than 1.2 METERS
104. CO4 As per PD 957, minimum lot sizes for duplexes? 80 SQM