Professional Documents
Culture Documents
Contingency Plan Latest July 2011
Contingency Plan Latest July 2011
Contingency Plan Latest July 2011
En-mass
Delivery Performance of (Refer Undertaking
Absentee by Total Absentee of Skilled Labour Availability Assurance from contracting
1 products to customer will Ex (HRD) Ex (HRD) HR from Agency held by
Skilled and Unskilled Labour Agency
severity dip down HRD)
Labour
Compressor
Unserviceable Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM and 350
Ex (Maint) Manager (Maint) Plant
1219 CFM stop CFM compressor
Compressor Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM
Ex (Maint) Manager (Production) Plant
Unserviceable 1000 stop compressor
Compressor Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM
Ex (Maint) Manager (Production) Plant
Unserviceable 1187 stop compressor
Hammer
Delivery to customer stops Uma Shankar Khandelwal Forgings Limited VP MD Plant
(5TON)
Hammer
Delivery to customer stops 2 Ton 2nd Hammer can be used Manager (Prod) Manager (HTM) Plant
(2TON Ist)
Hammer
Delivery to customer stops 2 Ton Ist Hammer can be used Manager (Prod) Manager (HTM) Plant
(2TON 2nd)
Key Hammer
Delivery to customer stops 2 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
Manufacturin (1.5TON)
3 g Machines
Pneumatic Hammer
( HFM ) Delivery to customer stops 1.5 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
(1.25TON)
Pneumatic Hammer
Delivery to customer stops 2 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
(2.5TON)
DELIVERY
Delivery
En-mass Total Absentee of Performance of (Refer Undertaking
Labour Availability Assurance from
1 Absentee by Skilled and products to Ex (HRD) Ex (HRD) HR from Agency held by
contracting Agency
Skilled Labour Unskilled Labour customer will HRD)
severity dip down
All Production
Power Failure Change over to 1010 KVA DG Set Ex (Maint) Manager (Maint) Utility Block
comes to a Stop
Compressor
Unserviceable Total Prod Comes to Sw on the Standby 750 CFM and 356
Ex (Maint) Manager (Maint) Plant
1219 CFM a stop CFM and 350 CFM compressor
Compressor
Total Prod Comes to Sw on the Standby 750 CFM and 356
Unserviceable Ex (Maint) Manager (Production) Plant
a stop CFM compressor
1000
Compressor
Utility Total Prod Comes to
2 Unserviceable Sw on the standby 356 CFM compressor Ex (Maint) Manager (Production) Plant
Breakdown a stop
350
Compressor
Total Prod Comes to
Unserviceable Sw on the standby 350 CFM compressor Ex (Maint) Manager (Production) Plant
a stop after 24 Hrs
356
Compressor
Total Prod Comes to
Unserviceable Sw on the standby 750 CFM compressor Ex (Maint) Manager (Production) Plant
a stop
750
Compressor
Total Prod Comes to Sw on the Standby 750 CFM and 356
Unserviceable Ex (Maint) Manager (Production) Plant
a stop CFM compressor
1187
Key
Manufacturing Hammer Delivery to Manager
3 2.0 Ton Hammer can be used Manager (HTM) Plant
Machines (1.5TONS) customer stops (Prod)
( HFM )
Screw Press 400 Delivery to Screw Press 300 tons or Embross Manager
Manager (HTM) Plant
tons customer stops Forgings, Barwala (Prod)
Screw Press 300 Delivery to Screw Press 400 tons or Embross Manager
Manager (HTM) Plant
tons customer stops Forgings, Barwala (Prod)
DELIVERY
Approved By
Rev 01 Reviewed By MR
Jt MD
F/HR/632/01 SAMRAT FORGINGS LIMITED Maintained By
28 DEC 2011 DERABASSI HOD
En-mass
Delivery Performance of (Refer Undertaking
Absentee by Total Absentee of Skilled Labour Availability Assurance from contracting
1 products to customer will Ex (HRD) Ex (HRD) HR from Agency held by
Skilled and Unskilled Labour Agency
severity dip down HRD)
Labour
Compressor
Unserviceable Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM and 350
Ex (Maint) Manager (Maint) Plant
1219 CFM stop CFM compressor
Compressor Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM
Ex (Maint) Manager (Production) Plant
Unserviceable 1000 stop compressor
Compressor Total Prod Comes to a Sw on the Standby 750 CFM and 356 CFM
Ex (Maint) Manager (Production) Plant
Unserviceable 1187 stop compressor
Hammer
Delivery to customer stops Uma Shankar Khandelwal Forgings Limited VP MD Plant
(5TON)
Hammer
Delivery to customer stops 2 Ton 2nd Hammer can be used Manager (Prod) Manager (HTM) Plant
(2TON Ist)
Hammer
Delivery to customer stops 2 Ton Ist Hammer can be used Manager (Prod) Manager (HTM) Plant
(2TON 2nd)
Key Hammer
Delivery to customer stops 2 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
Manufacturin (1.5TON)
3 g Machines
Pneumatic Hammer
( HFM ) Delivery to customer stops 1.5 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
(1.25TON)
Pneumatic Hammer
Delivery to customer stops 2 Ton Hammer can be used Manager (Prod) Manager (HTM) Plant
(2.5TON)
DELIVERY
Type of contingency
reviewed
Current status
Alternate
arrangements
Action plan
Responsibility/
Target date
Action completion
status
Production slow
Use of toggle clamp and new
Drill Fixture Of Power due to Ball Pin
3 design of fixture. EX (Quality) Manager (Quality) 8/15/2017 8/14/2017 OK
Steering Ball Pin clamping on
Fixture.
CONTINGENCY PLANS
Standby
Action
Responsibility in
Type of contingency Contingency Responsibility Completion completion
S.No. Contingency plan case of non- Target date
Reviewed Severity (Primary) date status
availability of
Main Person