FDD-GSB GR I
GR-I Test 1
FIELD DENSITY TEST BY SAND REPLACEMENT METHOD:-
Mass of pouring cylinder + sand, W1
1
( Before pouring in the hole ).
( gm ) 6475
Mass of pouring cylinder + sand, W2
2 ( gm ) 4430
( After pouring in the hole ).
Mass of sand used in the hole and cone, W3
3 ( gm ) 2045
= ( W1 - W2 )
4 Mass of sand in the cone only, W4 ( gm ) 373
5 Mass of sand in the hole only,
( gm ) 1672
W5 = ( W3 - W4 )
6 Density of sand, Ys. gm/cc 1.45
7 Volume of sand, V = W5/ Ys cc 1153.1
8 Mass of Excavated G.S.B, W ( gm ) 2744
9 Wet Density of G.S.B. Yt = W/V gm/cc 2.38
10 Water content from moisture meter (w) % 8
11 Field Dry density, Yd = Yt/1+w% gm/cc 2.2
12 Max. Dry Density (MDD) as per OMC gm/cc 2.21
13 OMC % 8.11
14 Degree of Compaction % 99.55