Span 22.

4 m

weight of girder 270.0 t 135.0 t


slab 285.6 t 142.8 t
WC 52.9 t 26.4 t
CB 40.3 t 20.1 t
END and INTER. Beam 39.02344 t 19.5 t
total 687.8 t Reaction 343.9 t

pier cap 1 44.1875 t


2 21.0375 t
3 29.9625 t
106.3438 t
4 5.9*1.5*.7t
5 5.578125 t
6 5.578125 t

pier 52.36124 t 52.36124 t


foundation 18.75 73.27275 t 73.27275 t
78.225
Reaction 575.9 t

live load Max 211.716 t 211.716 t


Reaction 789.7 t
including LL
MAX LL Trans Moment 1098.54 tm
MAX LL Long Moment 0 tm

Breaking force 31.08 t updown reaction due to breaking


Moment due Breaking force 46.51122 tm 2.076394 t

Wind 42.7 m/s Area G CD


Wind 36 m/s with live load 67.0432 2 2.11694
pressure 776.3632 N/m 2 67.0432 2 2.11694
pressure 551.8413 N/m2 with live load 450.5 2 0.75
450.5 2 0.75
Ft 22.03729 t
Ft 15.66417 t with live load

Fv 52.46275 t
Fv 37.29068 t with live load
e to breaking