Construction of CategoryIII Apartments Block 2 at Nust

Client : PMO ( NUST) (004/PMO/CTIII/IPC-018)

( CA NO.PD-PMO/27/2017 )

IPC No :4th Interim Payement Certificate

Grand Summary of Cos


Summary of Boq Item
S.No Description CA Amount
BOQ items Building works

1 Civil Work 49659275.78

2 Internal Electification Work 4657294.24

2 External Electification Work 2305591.66


Submitted By Checked By Tech.Checked By
3 Plumbing Work 3825936.2

TOTAL 60448097.88

Provisional Lump Sum (P


S.No Description Unit

1 Civil Work Rs

Total

NON BOQ
S.No Description Unit

1 External and internal earth filling Rs

Submitted By Checked By Tech.Checked By


G.Total Boq items,Non BoQ and PLS

Submitted By Checked By Tech.Checked By


ts Block 2 at Nust Campus Sector H-12, Islamabad

IPC-018)

MO/27/2017 )

ertificate

Summary of Cost
ary of Boq Items
Updated IPC Previous Current I.P.C

Err:509 Err:509 Err:509

Submitted By Checked By Tech.Checked By


Err:509 Err:509 Err:509

al Lump Sum (PLS)


Updated IPC Previous Current I.P.C

Err:509 798220.76 Err:509

Err:509 798,220.76 Err:509

NON BOQ
Updated IPC Previous Current I.P.C

Err:509 158025.77 Err:509

Submitted By Checked By Tech.Checked By


Err:509 Err:509 Err:509

Submitted By Checked By Tech.Checked By


Err:509

Err:509

Err:509

Submitted By Checked By Tech.Checked By


Err:509

Submitted By Checked By Tech.Checked By


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Contractor name

S.No S.I No

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Excavation over areas as in Hard Rock Required Blasting


but blasting is prohibited up to 1.5 M depth, in
foundation / to obtain earth for filling under floors / areas
etc, or for
Submitted By shafts, wells exec 30 sum each,
Checked By throw earth Tech.checked by
clear of edges of excavation within 10 M.
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Excavation as in Hard Soil upto 1.5m depth, in


foundation and pipe trenches upto 1.5 m wide in shafts,
wells and independent holes upto 30 Sqm each and
throw earth
Submitted By clear of edges of excavation
Checked By within 10 m. Tech.checked by
Timbering to be paid extra (Trench over 1.5 m width will
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Excavation as in Hard rock blasting but blasting is


prohibited upto 1.5m depth, in foundation and pipe
trenches upto 1.5 m wide in shafts, wells and
independent
Submitted By holes upto 30 Sqm each and
Checked By throw earth Tech.checked by
clear of edges of excavation within 10 m. Timbering to
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Load “Excavated spoil", as in soil / rock on truck / trolley


or any other means, carry beyond 10 M (specified in
items 01-1 to 01-10) upto 100 M or part thereof, unload
and stack
Submitted By or spread. Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Add for carrying soil / rock beyond 100M upto


500 KM or part thereof, on Macadam / Katcha road
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Add for carrying soil / rock for each subsequent 500 M


upto 2 Km or part thereof, on Macadam / Katcha road.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying of sand cushion under floor.


Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Termite proofing of new buildings incl wood-work therein


with approved chemicals.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

CONCRETE

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying of cement concrete 1:4:8 using


Crushed or Broken Stone graded as specified
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying reinforced cement concrete Type B


using crushed or broken stone in foundations,
independent column footings, solid floors etc including
form work as specified. Reinforcement measured and
Submitted By Checked By Tech.checked by
paid separately
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying reinforced cement concrete Type B


using crushed or broken stone in roof slabs, landings,
walls, plinth beams and bands etc as specified requiring
shuttering. Reinforcement measured and paid
Submitted By Checked By Tech.checked by
separately
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying reinforced cement concrete Type B


using crushed or broken stone in columns, beams,
stairs, posts, struts, piers, lintols, and the like requiring
shuttering, as specified. Reinforcement measured and
Submitted By Checked By Tech.checked by
paid separately
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Brick work and DPC


Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Burnt brick work in wall over 115 mm thick laid and


jointed in cement mortar 1:6 straight or to curve with
inner radius of 6 m and over upto 4.25 m depth
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Burnt brick work in wall over 115 mm thick laid and


jointed in cement mortar 1:6 straight or to curve with
inner radius of 6 m and over upto G.F roof level.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Burnt brick work in wall 115 mm thick laid and jointed in


cement mortar 1:4 straight or to curve with inner radius
of 6 m and over upto G.F roof level
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Burnt brick work in wall over 115 mm thick laid and


jointed in cement mortar 1:6 straight or to curve with
inner radius of 6 m and over upto 1st.F roof level.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Doors, Windows and Wood Work


Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply Aluminium Swing door, single shutter (Premium


Model), of Anodized Aluminium extruded section as
specified, incl fixing on concrete, wood or steel frames
complete with all necessary fitting except glass, lock and
Submitted By Checked By Tech.checked by
handle.
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fix, Aluminium door closer, single action,


(Premium model) Anodized Bronze.
Submitted By Checked By Tech.checked by
Each
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supplying of Aluminium sliding window (Deluxe Model)


of Anodized Champagne extruded section upto height of
1524 mm as specified incl fixing on concrete, wooden or
steel frames complete with all necessary fittings except
Submitted By Checked By Tech.checked by
glass.
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply of Aluminium sliding window (Premium Model),


of Anodized Bronze Aluminium extruded section exc
1524mm, but not exc 3048mm height as specified, incl
fixing on concrete, wood or steel frames, complete with
Submitted By Checked By Tech.checked by
all necessary fittings except glass.
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply of Aluminium Fly / Insect screening with imported


mesh (Economy Deluxe and Premium Model), of
Anodized Champagne extruded section as specified, incl
fixing on concrete, wood or steel frames, complete with
Submitted By Checked By Tech.checked by
all necessary fittings.
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supplying of Aluminium sliding window (Deluxe Model)


of Anodized Champagne extruded section exc-1524mm
but not exc 3048mm height as specified incl fixing on
concrete, wooden or steel frames complete with all
Submitted By
neccesary fittings except glass. Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fix 5mm thick Tinted glass fixed to timber or


steel sashes with hard/softwood beads and screws or by
the use of rubber lining.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Steel and Iron Work

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fix bars round, using deformed bars grade -


60 including cutting, bending, binding and placing
reinforcement in position.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fix bars round, using deformed bars grade -


40 including cutting, bending, binding and placing
reinforcement in position.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Floors and Wall Tiling

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying CC Type 'C" using crushed or


broken stone laid in floor slabs, as under layer for
Terrazzo / Stonolithic/tiles to finished.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying CC Type 'B" using crushed or


broken stone laid in floor slabs, as under layer for
Terrazzo / Stonolithic/tiles top finished.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying 75mm thick CC Type 'C' as in plinth


protection, surface finished and smoothed with neat
cement and steel trowel, incl form work, using crushed
or broken
Submitted By stone. Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying,20mm thick Granite marble in Black


colour (China) polishing complete as in floors, steps,
walls &Kitchen tops etc, laid & jointed in white / coloured
cement By(1: 2), complete.
Submitted Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying, Porcelain Tiles glazed/ unglazed in


any colour/print/texture exc 1600 sqcm on walls and
floors,set in neat cement and jointed in white / coloured
cement,Bycomplete, as specified,imported
Submitted Checked By (China). Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying of dark colour/printed/ textured.


glazed/non skid tiles exceeding 900 SqCm each,on walls
and floors, set in neat cement and jointes grouted with
white /colour cement complete all as specified.(Pak
Submitted By Checked By Tech.checked by
made).
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Plastering

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

13mm thick cement plaster 1:4 finished as specified.


Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

13mm thick cement plaster 1:6 finished as specified.


Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Painting

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Surface preparation by using putty on plastered wall or


ceiling to form smooth base for distemper, plastic
emulsion paint all as specified..and 3 coats of plastic
emulsion
Submitted By paint on new or old work such
Checked Byas walls Tech.checked by
including all detached attachment . (Internal)
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Wall finish, coat of Graffi to Wall coating 1.5 mm to 3.00


mm thick, in any colour, (straight and swirl),.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Two coat of Elastomeric Cementitious Water Proofing


Coating, applied as per manufacturer's instructions as
specified.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying CC type B as screed on roof,


surface finished smooth with neat cement and steel
trowel using crushed or broken stone
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Sewerage

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Excavation as in Hard Soil upto 1.5m depth, in


foundation and pipe trenches upto 1.5 m wide in shafts,
wells and independent holes upto 30 Sqm each and
throw earth
Submitted By clear of edges of excavation
Checked By within 10 m. Tech.checked by
Timbering to be paid extra (Foundation and Trench over
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Manhole complete rectangular or circular as described,


exceeding 600mm but not exceeding 1800mm deep with
iron steps (in angles 380mm centres), 230mm thick brick
Submitted
walls. By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying RCC type B manhole cover (precast


complete with angle iron frame embedded in concrete all
as per information sheet No. Svcs-341 dated 10-11-99.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Non Schedule Items

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying Porcelain Tile (imported)


(2'x1') on external wall surface complete all as
per drawings and as directed by engineer
incharge.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying M.S louvers using MS box


pipe 3"x5" including 3 x coat of paint complete
all as per drawings and as directed by engineer
incharge.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying M.S louvers using MS box


pipe 2"x2" including 3 x coat of paint complete
all as per drawings and as directed by engineer
incharge.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying wooden texture tile


(imported) on exterior wall complete all as per
drawings and as directed by engineer incharge.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Providing and laying 1:2:4 cement concrete


Khuras 2"(51mm) thick 2 ft x 2 ft (610x610) size
on roof including finishing with cement plaster
1:3 curing etc. complete.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fixing writing of words and NUST


logo on wall complete all as directed by
engineer incharge.
Submitted By Checked By Tech.checked by
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Supply and fixing footpath side grills using MS


Pipe 2"x2", 2"x1", 1"x1" & 1/2" x 1/2", including
3 coat of paint complete all as per drawings or
as directed by engineer incharge.
Submitted By Checked By Tech.checked by
Sqm
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Dismantling/Loading on truck or trolley/shift to


desired location dismantled material of old
check post, Barriers, hydraulic barriers, car
parking shade, school gate shade, sliding gates,
Submitted By Checked By Tech.checked by
footpaths, roads, shifting of Networking cables /
Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Submitted By Checked By Tech.checked by


Cons

M/S Musharraf Concr

DESCRIPTION
Unit

Total amount

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted
08-281 By 4.00 Checked By
2382.43 Tech.checked
9,529.72 by
Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

15-125,
Submitted By Checked By Tech.checked by
Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


M/R 123.14 6,388.75 786,710.68
Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

Submitted By Checked By Tech.checked by


Construction of CategoryIII Apartments Block 2 at Nust Campus Sector H-

Abstract of Cost IPC 4

harraf Concrete builders

BILL OF QUANTITY

S.I QTY Rates(Rs) Amount(Rs)

ount

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

0.00 0.00

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted
4.00 By Checked By
9,529.72 Tech.checked by
Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

0.00 0.00
Submitted By Checked By Tech.checked by
Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

0.00 0.00

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

0.00 0.00
Submitted By Checked By Tech.checked by
Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


Sector H-12, Islamabad

Client Name PMO

To Date Previous

Quantity Amount(Rs) Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

0.00

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By 4 9529.72 Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

0.00
Submitted By Checked By Tech.checked by
PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

0.00

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

0.00
Submitted By Checked By Tech.checked by
PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

0.00
Submitted By Checked By Tech.checked by
PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


121.98 779296.88
PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

Submitted By Checked By Tech.checked by


PMO ( NUST)

This IPC

Quantity Amount(Rs)

9758601.86
Submitted By Checked By Tech.checked by
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : M/S Musharraf Conc

Supply and fixing footpath side grills using MS Pipe 2"x2", 2"x1", 1"x1" & 1/2" x 1/2
paint complete all as per drawings or as directed by engineer inchar

S/NO DESCRIPTIPON NOS LENGTH BREADTH

Railing on C4 columns
1 side 1 280
Railing on check post
2 side 1 245

Excavation

S/NO DESCRIPTIPON NOS LENGTH BREADTH

Railing on C4 columns
1 side 1 280 1
Railing on check post
2 side 1 245 1
Brick work

S/NO DESCRIPTIPON NOS LENGTH BREADTH

Railing on C4 columns
1 side 1 280 0.75
Railing on check post
2 side 1 245 0.75

plaster
S/NO DESCRIPTIPON NOS LENGTH BREADTH

Railing on C4 columns
1 side 1 280
Railing on check post
2 side 1 245

Grafi
S/NO DESCRIPTIPON NOS LENGTH BREADTH

Railing on C4 columns
1 side 1 280
Railing on check post
2 side 1 245
pus,

S Musharraf Concrete Builders

"x1" & 1/2" x 1/2", including 3 coat of


by engineer incharge.

HEIGHT QUANTITY UNIT

2.5 700.00 Sft 263

2.5 612.50 Sft 234.08


Total 1312.50 Sft
Total 121.98 Sqm

HEIGHT QUANTITY UNIT

2 560.00 Cft

2 490.00 Cft
Total 1050.00 Cft
Total 29.73 Cum
HEIGHT QUANTITY UNIT

3.5 735.00 Cft

3.5 643.13 Cft


Total 1378.13 Cft
Total 39.02 Cum

HEIGHT QUANTITY UNIT

6.75 1890.00 Sft 3+3+.75

6.75 1653.75 Sft


Total 3543.75 Sft
Total 329.34 Sqm

HEIGHT QUANTITY UNIT

6.75 1890.00 Sft


6.75 1653.75 Sft
Total 3543.75 Sft
Total 329.34 Sqm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:


Page. /
IPC -1

Excavation as in Hard Soil upto 1.5m depth, in foundation and pipe trenches upto 1
independent holes upto 30 Sqm each and throw earth clear of edges of excavation w
paid extra (Foundation and Trench over 1.5 m width will be treated as areas).inclu
S/NO DESCRIPTIPON No NOS LENGTH

1 Excavation for pipes 1 1 31.75


Gate 10 at NUST Campus,
r H-12, Islamabad

Consultant : PMO NUST

Contractor : M/S Musharraf Concrete Builders

oundation and pipe trenches upto 1.5 m wide in shafts, wells and
w earth clear of edges of excavation within 10 m. Timbering to be
width will be treated as areas).including backfill with same soil.
BREADTH HEIGHT QUANTITY UNIT

2 2 127.00 CFT
Total 3.60 CUM
Construction of Gate 10 at NUST Campu
Sector H-12, Islamabad

BOQ item NO:


Page. /

IPC -1

EXCAVATION

S/NO DESCRIPTIPON No NOS LENGTH


Excavation of Check post
1

2 CF3 1 1 11.5

3 CF1 1 1 9

4 CF2 1 1 13.25

5 Sec A-A 1 1 10.5

5 Sec A-A 1 1 3.75

5 Sec B-B 1 1 10.5


Excavation of Guard Room
7

9 CF-6 1 1 16

10 CF-5 1 1 17

11 Sec A-A 1 2 6.74


Excavation of CF-4

14 CF4 1 1 10.75

Excavation

S/NO DESCRIPTIPON NOS NOS LENGTH

1 Railing on C4 columns side 1 1 280

2 Railing on check post side 1 1 245

Sand filling

S/NO DESCRIPTIPON No NOS LENGTH


Excavation of Check post
1

2 CF3 1 1 11.5
3 CF1 1 1 9

4 CF2 1 1 13.25

5 Sec A-A 1 1 10.5

5 Sec A-A 1 1 3.75

5 Sec B-B 1 1 10.5


Excavation of Guard Room
7

9 CF-6 1 1 16

10 CF-5 1 1 17

11 Sec A-A 1 2 6.74


Excavation of CF-4

14 CF4 1 1 10.75

DEDUCTION

Raft Concrete

Concrete of stem Column

Brick work

Concrete of plinth Beam


LEAN

S/NO DESCRIPTIPON No NOS LENGTH


Lean of Check post
1

2 CF3 1 1 11.5

3 CF1 1 1 9

4 CF2 1 1 13.25

5 Sec A-A 1 1 10.5

5 Sec A-A 1 1 3.75

6 Sec B-B 1 1 10.5


Lean of Guard Room
7

9 CF-6 1 1 16

10 CF-5 1 1 17

11 Sec A-A 1 2 6.74


Lean of CF-4

14 CF4 1 1 10.75
Raft Concrete

S/NO DESCRIPTIPON No NOS LENGTH


Raft of Check post
1

2 CF3 1 1 11

3 CF1 1 1 8.5

4 CF2 1 1 12.75

5 Sec A-A 1 1 10.5

5 Sec B-B 1 1 10.5


6 Sec A-A Grid 3 1 1 3.75

6 FB-2 1 1 11.25

6 FB-1 1 1 7.22
Lean of Guard Room
7

9 CF-6 1 1 15.5

10 CF-5 1 1 16.5

11 Sec A-A 1 2 6.74


Lean of CF-4

14 CF4 1 1 10.25

Concrete of stem colu

S/NO DESCRIPTIPON No NOS LENGTH


Columns
1

2 C1 1 3 2

3 C2 1 2 3

4 C3 1 1 4

5 C4 1 3 3
6 C5 1 3 4

7 C6 1 1 2
Brick work below G.

S/NO DESCRIPTIPON No NOS LENGTH


Brick work
1
Brick work on Grid 3 (Cf3)
2 1 1 13
Brick work on Grid B (Cf3)
3 1 1 10
Brick work on Grid 2 (Cf1&
4 CF2) 1 1 14.24
Brick work on Grid F (Cf2&
5 CF3) 1 1 6.75
Brick work on Grid 1 (Cf2&
6 CF3) 1 1 20.99
Brick work on Grid 4 ,5 (Cf6&
7 CF5) 1 2 12.99

Brick work on Grid 6 ( CF4)


1 2 13.62

Concrete of plinth be

S/NO DESCRIPTIPON No NOS LENGTH


Plinth beam
1

2 Beam on Grid 2,3,4,5 1 4 16.99

3 Beam on Grid B, F 1 2 11.5

4 Beam on Grid 1 1 1 26.99


Concrete of Ground floor

S/NO DESCRIPTIPON No NOS LENGTH


Columns
1

2 C1 1 3 2

3 C2 1 2 3

4 C3 1 1 4

5 C4 1 3 3

6 C5 1 3 4

7 C6 1 1 2

Slab Concrete G.floo

S/NO DESCRIPTIPON No NOS LENGTH


Slabs
1

2 Check post 1 1 11.5

3 Guard room 1 1 8.25


G.F beam
4

5 Beam1 1 1 11.5

6 Beam 2 1 1 8.25

7 Beam 3 1 1 11.5

Beam4 1 1 8.25

Beam5 1 1 15.5

Beam6 1 1 15.5

Beam7 1 2 15.5
10 at NUST Campus,
, Islamabad

Consultant : PMO NUST

Contractor : M/S Musharraf Concrete Builders

ON

BREADTH HEIGHT QUANTITY UNIT

22.5 5.5 1423.13 CFT

10.25 5.5 507.38 CFT

11.5 5.5 838.06 CFT

3 5.5 173.25 CFT

3.5 5.5 72.19 CFT

3.5 5.5 202.13 CFT

0.00

9 4.25 612.00 CFT

9 4.25 650.25 CFT

3 4.25 171.87 CFT


0.00

24 4 1032.00 CFT

TOTAL 5682.25 CFT

TOTAL 160.88 CUM

Excavation

BREADTH HEIGHT QUANTITY UNIT

1 2 560.00 Cft

1 2 490.00 Cft

Total 1050.00 Cft

Total 29.73 Cum

Sand filling

BREADTH HEIGHT QUANTITY UNIT

22.5 5.5 1423.13 CFT


10.25 5.5 507.38 CFT

11.5 5.5 838.06 CFT

3 5.5 173.25 CFT

3.5 5.5 72.19 CFT

3.5 5.5 202.13 CFT

0.00

9 4.25 612.00 CFT

9 4.25 650.25 CFT

3 4.25 171.87 CFT

0.00

24 4 1032.00 CFT

TOTAL 5682.25 CFT

TOTAL 160.88 CUM

47.59 CUM

2.66 CUM

11.88 CUM

2.82 CUM
Total 64.95 CUM
Sand
Filling 95.93 CUM

LEAN

BREADTH HEIGHT QUANTITY UNIT

22.5 0.25 64.69 CFT

10.25 0.25 23.06 CFT

11.5 0.25 38.09 CFT

3 0.25 7.88 CFT

3.5 0.25 3.28 CFT

3.5 0.25 9.19 CFT

9 0.25 36.00 CFT

9 0.25 38.25 CFT

3 0.25 10.11 CFT

24 0.25 64.50 CFT


TOTAL 295.05 CFT

TOTAL 8.35 CUM

aft Concrete

BREADTH HEIGHT QUANTITY UNIT

22 1.5 363.00 CFT

10 1.5 127.50 CFT

11 1.5 210.38 CFT

2.5 1.5 39.38 CFT

3 1.5 47.25 CFT


3 1.5 16.88 CFT

0.75 1.75 14.77 CFT

2.75 2.25 44.67 CFT

8.5 1.5 197.63 CFT

8.5 1.5 210.38 CFT

2.5 1.5 50.55 CFT

23.5 1.5 361.31 CFT

TOTAL 1683.68 CFT

TOTAL 47.67 CUM

e of stem column

BREADTH HEIGHT QUANTITY UNIT

0.75 3.75 16.88 CFT

0.75 3.75 16.88 CFT

0.75 3.75 11.25 CFT

1.125 2.5 25.31 CFT


0.75 2.25 20.25 CFT

0.75 2.25 3.38 CFT

TOTAL 93.94 CFT

TOTAL 2.66 CUM


work below G.L

BREADTH HEIGHT QUANTITY UNIT

1.125 3.75 54.84 CFT

1.125 3.75 42.19 CFT

1.125 3.75 60.08 CFT

1.125 2.25 17.09 CFT

1.125 2.25 53.13 CFT

1.125 2.25 65.76 CFT

1.125 3.25 99.60 CFT

TOTAL 392.68 CFT

TOTAL 11.12 CUM

te of plinth beam

BREADTH HEIGHT QUANTITY UNIT

1.125 0.75 57.34 CFT

1.125 0.75 19.41 CFT

1.125 0.75 22.77 CFT


TOTAL 99.52 CFT

TOTAL 2.82 CUM

Ground floor column

BREADTH HEIGHT QUANTITY UNIT

0.75 11 49.50 CFT

0.75 11 49.50 CFT

0.75 11 33.00 CFT

1.125 19.5 197.44 CFT

0.75 11 99.00 CFT

0.75 11 16.50 CFT

TOTAL 444.94 CFT

TOTAL 12.60 CUM

Concrete G.floor

BREADTH HEIGHT QUANTITY UNIT

16.99 0.5 97.69 CFT

16.99 0.5 70.08 CFT


0.75 1 8.63 CFT

0.75 1 6.19 CFT

0.75 1 8.63 CFT

0.75 1 6.19 CFT

0.75 1 11.63 CFT

0.75 1 11.63 CFT

0.75 1 23.25 CFT


TOTAL 243.90
CFT
TOTAL 6.91 CUM
Construction of Category-lll Apartments (Block-II) at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : M/S Musharraf Concrete

Aluminum
S/NO DESCRIPTIPON NOS LENGTH BREADTH
Doors
1 D1 3 3.5
2 D2 1 2.5

Aluminum
S/NO DESCRIPTIPON NOS LENGTH BREADTH
window
1 W1 (7.875'+7.33') 1 15.2
2 W2 (7.875'+7.33') 1 15.2
3 W3 1 4.25
4 w4 2 6

5 Ventilator 1 3

Mesh
S/NO DESCRIPTIPON NOS LENGTH BREADTH
window
1 W1 1 15.2
2 W2 1 15.2
3 W3 1 4.25

Glass
S/NO DESCRIPTIPON NOS LENGTH BREADTH
Doors
1 D1 3 3.5
2 D2 1 2.5
3 W1 1 15.2
4 W2 1 15.2
5 W3 1 4.25
6 w4 2 6
7 Ventilator 1 3
ST Campus,

S Musharraf Concrete Builders

HEIGHT QUANTITY UNIT

7.75 81.38 SFT


7.75 19.38 SFT
Total 100.75 SFT
Total 9.36 Sqm

HEIGHT QUANTITY UNIT 32.22

7.67 116.58 SFT


1.5 22.80 SFT
6 25.50 SFT
6 72.00 SFT
Total 236.88 SFT
Total 22.02 Sqm
3 9.00 SFT
Total 0.84 Sqm

HEIGHT QUANTITY UNIT

7.67 116.58 SFT


1.5 22.80 SFT
6 25.50 SFT
Total 164.88 SFT
Total 15.32 Sqm

HEIGHT QUANTITY UNIT

7.75 81.38 SFT


7.75 19.38 SFT
7.67 116.58 SFT
1.5 22.80 SFT
6 25.50 SFT
6 72.00 SFT
3 9.00 SFT
Total 346.63 SFT
Total 32.22 Sqm
Construction of Category-lll Apartments (Block-II) at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:


Page. /
IPC -1

Termite proofing
S/NO DESCRIPTIPON No NOS LENGTH
Termite proofing

Raft of Check post


1

2 CF3 1 1 11

3 CF1 1 1 8.5

4 CF2 1 1 12.5

5 Sec A-A 1 1 10.5

5 Sec B-B 1 1 10.5

6 Sec A-A Grid 3 1 1 3.75

6 FB-2 1 1 11.25

6 FB-1 1 1 7.22
Lean of Guard Room
7

9 CF-6 1 1 15.5
10 CF-5 1 1 16.5

11 Sec A-A 1 2 6.74


Lean of CF-4

14 CF4 1 1 23.5

Sorrunding

Plaster below G.L Raft Plaster

Check post CF1 CF2 CF3 1 1 135

Guard Room CF5 CF6 1 2 48

CF4 1 1 67.5

SEC AA IN GUARD ROOM 2 2 6.75

SEC AA IN Check Post 1 2 10.5

SEC BB IN Check Post 1 1 22


Space b/w SEC AA &BB IN
Check Post 1 2 2.5

F.B 1 1 1 10

F.B 2 1 2 5.58
Termite proofing
S/NO DESCRIPTIPON No NOS LENGTH
Termite proofing
1 Raft of Check post
2 Check post 1 1 15.5
3 Guard room 1 1 15.5
nts (Block-II) at NUST Campus,
amabad

Consultant : PMO NUST

Contractor : M/S Musharraf Concrete Builders

proofing
BREADTH HEIGHT QUANTITY UNIT

22 242.00 SFT

10 85.00 SFT

11 137.50 SFT

2.5 26.25 SFT

3 31.50 SFT

3 11.25 SFT

0.75 8.44 SFT

2.75 19.86 SFT

8.5 131.75 SFT


8.5 140.25 SFT

2.5 33.70 SFT

10.25 240.88 SFT

1.5 202.50 SFT

1.5 144.00 SFT

1.5 101.25 SFT

0.75 20.25 SFT

0.75 15.75 SFT

0.75 16.50 SFT

1.5 7.50 SFT

4.25 42.50 SFT

7.25 80.91 SFT


Total 1739.53 SFT
Total 161.67 SQM
Termite proofing
BREADTH HEIGHT QUANTITY UNIT

10 155.00 SFT
6.75 104.63 SFT
259.63 SFT
24.13 Sqm
185.79
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : M/S Musharraf Conc

P.C.C 1:4:8
S/NO DESCRIPTIPON No NOS LENGTH BREADTH

1 Check Post
2 Check Post 1 1 10 15.5
3 Guard Room 1 1 6.75 15.5
ampus,

S Musharraf Concrete Builders

HEIGHT QUANTITY UNIT

0.33 51.15 SFT


0.33 34.53 SFT
Total 85.68 SFT
Total 2.43 SQm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:


Page. /
IPC -1

Sand cushion
S/NO DESCRIPTIPON No NOS LENGTH

1 Check Post
2 Check Post 1 1 10
3 Guard Room 1 1 6.75

Sand filling
S/NO DESCRIPTIPON No NOS LENGTH
1 Excavation of Check post
2 CF3 1 1 11.5
3 CF1 1 1 9
4 CF2 1 1 13.25
5 Sec A-A 1 1 10.5
5 Sec A-A 1 1 3.75
5 Sec B-B 1 1 10.5
7 Excavation of Guard Room
9 CF-6 1 1 16
10 CF-5 1 1 17
11 Sec A-A 1 2 6.74
Excavation of CF-4
14 CF4 1 1 10.75

DEDUCTION
Raft Concrete
Concrete of stem Column
Brick work
Concrete of plinth Beam
of Gate 10 at NUST Campus,
or H-12, Islamabad

Consultant : PMO NUST

Contractor : M/S Musharraf Concrete Builders

ushion
BREADTH HEIGHT QUANTITY UNIT

15.5 0.25 38.75 CFT


15.5 0.25 26.16 CFT
Total 64.91 CFT
Total 1.84 CUM

filling
BREADTH HEIGHT QUANTITY UNIT

22.5 5.5 1423.13 CFT


10.25 5.5 507.38 CFT
11.5 5.5 838.06 CFT
3 5.5 173.25 CFT
3.5 5.5 72.19 CFT
3.5 5.5 202.13 CFT
0.00
9 4.25 612.00 CFT
9 4.25 650.25 CFT
3 4.25 171.87 CFT
0.00
24 4 1032.00 CFT
TOTAL 5682.25 CFT
TOTAL 160.88 CUM
47.59 CUM
2.66 CUM
11.88 CUM
2.82 CUM
Total 64.95 CUM
Total
Sand
Filling 95.93 CUM
Total
Sand
Filling 97.77 CUM
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : M/S Musharraf Conc

P.C.C 1:2:4
S/NO DESCRIPTIPON No NOS LENGTH BREADTH

1 Check Post
2 Check Post 2 1 10 15.5
3 Guard Room 1 1 6.75 15.5

Construction of Gate 10 at NUST Campus,


Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : M/S Musharraf Conc

Sand cushion
S/NO DESCRIPTIPON No NOS LENGTH BREADTH

1 Check Post
2 Check Post 1 1 10 15.5
3 Guard Room 1 1 6.75 15.5
ampus,

S Musharraf Concrete Builders

HEIGHT QUANTITY UNIT

0.16 49.60 Cft


0.16 16.74 Cft
Total 66.34 Cft
Total 1.88 CUM

ampus,

S Musharraf Concrete Builders

HEIGHT QUANTITY UNIT

0.25 38.75 CFT


0.25 26.16 CFT
Total 64.91 CFT
Total 1.84 CUM
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Construction of Category III Appartments Block II IPC 4th Consultant: NUST
Steel Summary Contractor: Musharraf Concrete
Schedule ITEM # 9-56 Schedule ITEM #
Steel Reinforcement as per ASTM 615 yield strength 60000 PSI, and Steel Reinforcement as per ASTM 615 yiel
hot rolled deformed steel as specified in drawings, as per ASTM 615, hot rolled deformed steel as specified in d
with a proof strength 60000 PSI as manufactured from billet of with a proof strength 40000 PSI as man
Pakistan Steel and fixing in any height, level or shape, including Pakistan Steel and fixing in any height, l
cutting, bending, placing and binding wire including laps, spacers, cutting, bending, placing and binding wir
chairs etc., complete as per drawings and specification chairs etc., complete as per drawing

Grade 60 Grade 40
S.No. Description UNIT
1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia 1"Dia 3/4"Dia

1 Raft steel KG 83.73 1716.12 1200.81 77.30

1 Column Steel KG 818.85 1646.24 940.01

2 Beams Steel KG 529.56 957.05 542.95 668.78

Submitted By: Checked by: Tech.checked by:


3 Slab Steel KG

Steel Total 529.56 1859.64 3362.36 1743.76 1686.09 - -

Total steel KG 9181.40 4015.19


13196.58
G.TOTAL STEEL KG

9181.40

Submitted By: Checked by: Tech.checked by:


12 ISLAMABAD

ant: NUST
or: Musharraf Concrete Builders
Schedule ITEM #9-54
forcement as per ASTM 615 yield strength 40000 PSI, and
deformed steel as specified in drawings, as per ASTM 615,
roof strength 40000 PSI as manufactured from billet of
Steel and fixing in any height, level or shape, including
ending, placing and binding wire including laps, spacers,
rs etc., complete as per drawings and specification

Grade 40
5/8"Dia 1/2"Dia 3/8"Dia

3077.96 0.00

3405.10

2698.34

Submitted By: Checked by: Tech.checked by:


441.05 3,574.14 4,015.19

- 441.05 3,574.14

4015.19

4015.19

Submitted By: Checked by: Tech.checked by:


Construction of GATE 10

Item : Columns

S.No. Description

1 C1 9"x24"

2 vertical Bars

3 Ties So 6"x21"

4 Ties So 7"x6"

6 C2 9"x36"

7 vertical Bars
8 Ties So 6"x33"

9 Stick bar So 7"x6"

10

11 C3 9"x48"

12 vertical Bars

13 Ties So 6"x27"

14

15 C4 13.5"x 36"

16 vertical Bars

17 vertical Bars

18 Ties So 10.5"x33"

19 Stick bar So

20

21 C5 9"x 24"
22 vertical Bars

23 vertical Bars

24 Ties So 21"x6"

25 Ties So 21"x6"

26

27 C6 9"x 24"

28 vertical Bars

29 Ties So 6"x21"

30 Ties So 7"x6"

31
Columns above G.L

1 C1 9"x24"

2 vertical Bars
3 Ties So 6"x21"

4 Ties S 6"x21"

5 small Ties So 6"x21"

6 small Ties S 6"x21"

8 C2 9"x36"

9 vertical Bars

10 Ties So 6"x33"

11 Ties S 6"x21"

12 Stick Bars So

13 Stick Bars S

14
15

16 C3 9"x48"

17 vertical Bars

18 Ties So 6"x27"

19 Ties S 6"x27"

20

21 C4 13.5"x 36"

22 vertical Bars

23 vertical Bars

24 Ties So 10.5"x33"

25 Ties S 10.5"x33"

26 Stick bar So
27 Stick bar S

28

29 C5 9"x 24"

30 vertical Bars

31 vertical Bars

32 Ties So 21"x6" H/4 x2

33 Ties S 21"x6" H/2

34

35

36 C6 9"x 24"

37 vertical Bars

38 Ties So 6"x21" H/4 X 2


39 Ties S 6"x21" H/2

40 Ties So 7"x6" H/4 X 2

41 Ties So 7"x6" H/2


Columns of 1st Floor

1 C1 9"x24"

2 vertical Bars

3 Ties So 6"x21"

4 Ties S 6"x21"

5 small Ties So 6"x21"


6 small Ties S 6"x21"

10 C3 9"x48"

11 vertical Bars

12 Ties So 6"x27"

13 Ties S 6"x27"

14
15 C5 9"x 24"

16 vertical Bars

17 vertical Bars

18 Ties So 21"x6" H/4 x2

19 Ties S 21"x6" H/2

20
22 C6 9"x 24"

23 vertical Bars

24 Ties So 6"x21" H/4 X 2

25 Ties S 6"x21" H/2

26 Ties So 7"x6" H/4 X 2

27 Ties So 7"x6" H/2


Total Steel in Rft

Weght Lbs/RFT

Total Weight Lbs

Total Weight Kg

TOTAL steel QTY


NATIONAL UNIVERSITY OF

No of
Remarks Dia C/C columns

Height 5'-6"

# 5 3

5.5-1.5-.25=3.75 # 3 4.5" 3

5.5-1.5-.25=3.75 # 3 4.5" 3

Height 5'-6"

# 5 2
5.5-1.5-.25=3.75 # 3 4.5" 2

5.5-1.5-.25=3.75 # 3 4.5" 2

Height 5'-6"

# 5 1

5.5-1.5-.25=3.75 # 3 4.5" 1

Height 4'-3"

# 6 3

# 5 3

4.25-1.5-.25=2.5/6" # 3 6" 3

4.25-1.5-.25=2.5/6" # 3 6" 3

Height 4'
4-0.16-0.25=3.59 # 6 3

# 5 3

4-1.5-.25=2.25 # 3 4.5" 3

4-1.5-.25=2.25 # 3 4.5" 3

Height 4'

# 5 1

4-1.5-.25=2.25 # 3 4.5" 3

4-1.5-.25=2.25 # 3 4.5" 3

Height 12.5'

# 5 3
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 3
12.5-1.5=11'/2
=5.5/.75 # 3 9" 3
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 3
12.5-1.5=11'/2
=5.5/.75 # 3 9" 3

Height 12.5'

# 5 2
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 2
12.5-1.5=11'/2
=5.5/.75 # 3 9" 2
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 2
12.5-1.5=11'/2
=5.5/.75 # 3 9" 2
Height 12.5'

# 5 1
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 1
12.5-1.5=11'/2
=5.5/.75 # 3 4.5" 1

Height 24.5'

# 6 3

# 5 3
24.5-0.5=24'/4 =6
6x2=12/.50= # 3 6" 3
24.5-2.5=24'/2 =12
12/1= # 3 12" 3
24.5-2.5=22'/4 =5.5
5.5x2=11/.50= # 3 6" 3
24.5-2.5=22'/2 =11
11/1= # 3 12" 3

Height 12.5'

# 6 3

# 5 3
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 3
12.5-1.5=11'/2
=5.5/.75 # 3 9" 3

Height 12.5'

# 5 1
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 1
12.5-1.5=11'/2
=5.5/.75 # 3 9" 1
12.5-1.5=11'/4 =2.75
2.75x2=5.5/.375= # 3 4.5" 1
12.5-1.5=11'/2
=5.5/.75 # 3 9" 1

Height 12.75'

# 5 3

12.75-1.5=11.25'/4
=2.81
2.81x2=5.62/.375= # 3 4.5" 3

12.75-1.5=11.25'/2
=6.375/.75 # 3 9" 3

12.75-1.5=11.25'/4
=2.81
2.81x2=5.62/.375= # 3 4.5" 3
12.75-1.5=11.25'/2
=6.375/.75 # 3 9" 3

Height 12.75'

# 5 1

12.75-1.5=11.25'/4
=2.81
2.81x2=5.62/.375= # 3 4.5" 1

12.75-1.5=11.25'/2
=6.375/.75 # 3 4.5" 1
Height 8.5'

# 6 3

# 5 3

8.5-2.5=6'/4 =1.5
1.5x2=3/.375= # 3 4.5" 3

8.5-2.5=6'/2 =3
3=3/.75= # 3 9" 3
Height 8.5'

# 5 1

8.5-2.5=6'/4 =1.5
1.5x2=3/.375= # 3 4.5" 1

8.5-2.5=6'/2 =3
3=3/.75= # 3 9" 1

8.5-2.5=6'/4 =1.5
1.5x2=3/.375= # 3 4.5" 1

8.5-2.5=6'/2 =3
3=3/.75= # 3 9" 1
steel QTY
UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in each Total No's Actual length Overlap


of steel bar

8 24 5.09 3.02

11 33 4.5

11 33 2.16

10 20 5.09 3.02
11 22 6.5

11 22 0.5

12 12 5.09 3.02

22 22 5.5

6 18 3.84 3.62

6 18 3.84 3.02

6 18 7.25

6 18 0.875
5 15 3.59 3.62

7 21 3.59 3.02

7 21 4.5

7 21 4.5

8 8 3.59 3.02

7 21 4.5

7 21 2.16

8 24 12.5 3.02
16 48 4.5

7 21 4.5

16 48 2.16

7 21 2.16

10 20 12.5 3.02

16 32 6.5

7 14 6.5

16 32 0.5

7 14 0.5
12 12 12.5 3.02

32 32 5.5

14 14 5.5

6 18 24.5 3.62

6 18 24.5 3.02

25 75 7.25

12 36 7.25

25 75 0.875
12 36 0.875

5 15 12.5 3.62

7 21 12.5 3.02

32 96 4.5

14 42 4.5

8 8 12.5 3.02

16 16 4.5
7 7 4.5

16 16 2.16

7 7 2.16

8 24 12.75

16 48 4.5

9 27 4.5

16 48 2.16
9 27 2.16

12 12 12.5

32 32 5.5

18 18 5.5
5 15 8.5

7 21 8.5

18 54 4.5

8 24 4.5
8 8 12.5

9 9 4.5

4 4 4.5

9 9 2.16

4 4 2.16
AMABAD

Consultant: NUST

Contractor: Musharraf Concrete Build


Cut Length of
#3=Grade40 #4,#5#6 =Gr
Hook
steel bar 1"Dia 3/4"Dia

0.84 8.95

0.5 5.00

0.5 2.66

0.84 8.95
0.5 7.00

0.5 1.00

0.84 8.95

0.5 6.00

1 8.46 152.28

0.84 7.70

0.5 7.75

0.5 1.38
1 8.21 123.15

0.84 7.45

0.5 5.00

0.5 5.00

0.84 7.45

0.5 5.00

0.5 2.66

15.52
0.5 5.00

0.5 5.00

0.5 2.66

0.5 2.66

15.52

0.5 7.00

0.5 7.00

0.5 1.00

0.5 1.00
15.52

0.5 6.00

0.5 6.00

2 30.12 542.16

1.68 29.20

0.5 7.75

0.5 7.75

0.5 1.38
0.5 1.38

16.12 241.80

15.52

0.5 5.00

0.5 5.00

15.52

0.5 5.00
0.5 5.00

0.5 2.66

0.5 2.66

0.84 13.59

0.5 5.00

0.5 5.00

0.5 2.66
0.5 2.66

12.50

0.5 6.00

0.5 6.00
1 9.50 142.50

0.84 9.34

0.5 5.00

0.5 5.00
0.84 13.34

0.5 5.00

0.5 5.00

0.5 2.66

0.5 2.66
0.00 1201.89
2.67 1.502

0.00 1805.24

0.00 818.85

3.41

TOTAL QTY G-40


TOTAL QTY G-60
#REF!
ST

sharraf Concrete Builders

ade40 #4,#5#6 =Grade60

5/8"Dia 1/2"Dia 3/8"Dia

214.80

165.00

87.78

179.00
154.00

22.00

107.40

132.00

138.60

139.50

24.75
156.45

105.00

105.00

59.60

105.00

55.86

372.48
240.00

105.00

127.68

55.86

310.40

224.00

98.00

32.00

14.00
186.24

192.00

84.00

525.60

581.25

279.00

103.13
49.50

325.92

480.00

210.00

124.16

80.00
35.00

42.56

18.62

326.16

240.00

135.00

127.68
71.82

150.00

192.00

108.00
196.14

270.00

120.00
106.72

45.00

20.00

23.94

10.64
3479.67 0.00 5511.57
1.043 0.668 0.376

3629.30 0.00 2072.35

1646.24 0.00 940.01

Tons 3405.10 KG

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

#REF!
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Plinth Beam

1 Beam on Grid 2,3,4,5 16.99'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

2 Main bars

3 Stirupps 16.74/.75+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

5 Beam on Grid B, F 11.5'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

6 Main bars

7 Stirupps 10/.75+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

9 Beam on Grid 1 26.99'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

10 Main bars

11 Stirupps 20.99/.75+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

12

13 Ground floor Slab Beams

14 Beam 1 on Grid F (9'x18") 11.5'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

15 Top bars

16 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

17 Stirupps 6.75/.33+1

18
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

19 Beam 2 on Grid F (9'x18") 8.25'

20 Top bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

21 Bottom bars

22 Stirupps 4.25/.33+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

23

24 Beam 3 on Grid F (9'x18") 11.5'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

25 Top bars

26 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

27 Stirupps near supports

28 Stirupps in mid 3.4/.66+1


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

29

30 Beam 4 on Grid F (9'x18") 7'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

31 Top bars

32 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

33 Stirupps 5.5/.33+1

34
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

35 Beam 5 on Grid F (9'x18") 17'

36 Top bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

37 Bottom bars

38 Stirupps near supports 3.33+3.33/.33


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

39 Stirupps in mid 7.59/.66+1

40
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

41 Beam 6 on Grid 3 (9'x18") 17'

42 Top bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

43 Bottom bars

44 Stirupps 6.75+5.5/0.33+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

45

46 Beam 7 on Grid 4,5 (9'x18") 17'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

47 Top bars

48 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

49 Stirupps near supports 3.33+3.33/.33

50 Stirupps in mid 6.34/.66+1


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

51

Band Beam in check post 11.5


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Main bars

Stirupps 10/.75+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Band Beam of Guard Room 8.25+8.25+17+17


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Main bars

Stirupps 45/.75+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Lintels of guard room 6+.5+.5

Main bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Stirupps 7/.5+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Lintels of Check post D1,D2 (3.5+.5+.5) (2.5+.5+.5)

Main bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Stirupps 8/.5+1
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Inverted beam Top floor


Beams
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

1 inverted Beam 1 (15'x30") 101.25'

2 Top bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

3 Bottom bars

4 Bottom EXtra bars 42+4+2-.25


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

5 Bottom EXtra bars 34.5+2+3-.25


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

6 Bottom EXtra bars 34.5+2+3-.25


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

7 Top EXtra bars (5+4+14)+(12.25+3+4.5)


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

8 Top EXtra bars (14+2+4.25+2+12.25)


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Stirupps near Vertical supports


9 12"x27" 5+7.5+7.5+4.25+7.5+7.5+4.5

10 Stirupps in mid 27+19.5


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

11

12 inverted Beam 2 (15'x30") 101.25'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

13 Top bars

14 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

15 Bottom EXtra bars 34.5-4.25-4.25

16 Bottom EXtra bars 34.5+2+3-.25


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

17 Bottom EXtra bars 34.5+2+3-.25

Top EXtra bars


(6+0.75+11.5)+(11.5+0.75+5.5
18 +2+12.25)+(12.25+3+4.5)
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Stirupps near Vertical supports 5+10+7.5+7.5+5.5+7.5+7.5+4.5


19 12"x27" /0.5

20 Stirupps in mid 26+19.5/1


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

21

22 inverted Beam 3 (9'x24") 17'


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

23 Top bars

24 Bottom bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Top EXtra bars


25
Stirupps near Vertical supports
26 6"x21"
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

27 Stirupps in mid 5.62+5.62-14.23=3/.75

28
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

29 inverted Beam 4 (9'x24") 17'

30 Top bars
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

31 Bottom bars
Top EXtra bars
32
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Stirupps near Vertical supports


33 6"x21" 6.75+5.5=12.25/.375
NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Total Steel in Rft


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Weght Lbs/RFT

Total Weight Lbs


NATI

Construction Category III appartments Block II

Item :Beams

S.No. Description Remarks

Total Weight Kg

TOTAL QTY
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 4 4 16 16.74

# 3 9" 4 23 92 2.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 2 4 8 11.25

# 3 9" 2 14 28 2.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 4 4 26.74

# 3 9" 1 29 29 2.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 11.25

# 6 1 2 2 11.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4" 1 21 21 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 8
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 8

# 3 4" 1 14 14 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 11.25

# 6 1 2 2 11.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4" 1 20 20 3.5

# 3 4" 1 6 6 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 6.75

# 6 1 2 2 6.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4" 1 18 18 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 16.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 16.75

# 3 4" 1 20 20 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4" 1 13 13 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 16.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 16.75

# 3 4" 1 38 38 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 2 2 4 16.75

# 6 2 2 4 16.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4" 2 20 40 3.5

# 3 4" 2 11 22 3.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 4 4 11.5

# 3 9" 1 14 14 2
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 4 4 50

# 3 9" 1 61 61 2
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 2 6 12 7
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 9" 1 15 15 2
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 4 4 8
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 9" 1 17 17 2
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 101 9.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 3 3 101 9.25

# 8 1 3 3 47.75 6
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 8 1 2 2 39.25 6
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 1 1 39.25 3.62
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 42.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 8 1 2 2 34.5 3.62
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 6" 1 89 89 6.5

# 3 12" 1 47 47 6.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 3 3 101 6.16

# 6 1 3 3 101 9.25
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 26

# 8 1 2 2 39.25 6
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 1 1 39.25 3.62

# 4 1 3 3 70
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 6" 1 111 111 6.5

# 3 12" 1 46 46 6.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 16.75

# 6 1 2 2 16.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 4.5

# 3 4.5" 1 30 30 4.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 9" 1 5 5 4.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 4 1 2 2 16.75
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 6 1 2 2 16.75

# 6 1 2 2 6
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar

# 3 4.5" 1 34 34 4.5
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET

No's in Total No's Actual length Overlap


Dia C/C No of beams each of steel bar
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.08 289.28

0.5 2.75 253.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 12.59 100.72

0.5 2.75 77.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 28.08 112.32

0.5 2.75 79.75


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 12.59 25.18

2 13.25 26.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 4.00 84.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 9.34 18.68


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 10.00 20.00

0.5 4.00 56.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 12.59 25.18

2 13.25 26.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 4.00 80.00

0.5 4.00 24.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 8.09 16.18

2 8.75 17.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 4.00 72.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.09 36.18


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 18.75 37.50

0.5 4.00 80.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 4.00 52.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.09 36.18


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 18.75 37.50

0.5 4.00 152.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.09 72.36

2 18.75 75.00
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 4.00 160.00

0.5 4.00 88.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

11.50 46.00

0.5 2.50 35.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

50.00 200.00

0.5 2.50 152.50


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 8.34 100.08


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 2.50 37.50


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 9.34 37.36


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 2.50 42.50


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 112.25 224.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 112.25 336.75

2.68 56.43 169.29


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2.68 47.93 95.86


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 44.87 44.87
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 44.75 89.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

38.12 76.24
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 7.00 623.00

0.5 7.00 329.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 108.50 325.50

2 112.25 336.75
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

26.00 52.00

2.68 47.93 95.86


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 44.87 44.87

2 72.00 216.00
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 7.00 777.00

0.5 7.00 322.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.09 36.18

2 18.75 37.50
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.67 5.17 10.34

0.5 5.00 150.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 5.00 25.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.34 18.09 36.18


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

2 18.75 37.50

6.00 12.00
BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

0.5 5.00 170.00


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

437.25 1404.74 0.00 1791.90 3921.25


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia
2.67 1.502 1.043 0.668 0.376

1167.46 2109.92 0.00 1196.99 1474.39


BAD

Consultant: NUST

Contractor: Musharraf Concrete Builders


Cut Length of
#3=Grade40 #4,#5#6 =Grade60
Hook
steel bar 1"Dia 3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

529.56 957.05 0.00 542.95 668.78

2.70 Tons 2698.34 KG


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

1 CF-1 10x8'-6"

2 Bottom Main Bars 10.09/.66 # 5

3 Bottom Distribution Bars 8.59/.66 # 5


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

4 Top Main Bars 10.09/.50 # 4

5 Top Distribution Bars 8.59/0.50 # 4

6 CF-2 11x12'-6"

7 Bottom Main Bars 12.67/.66 # 5


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

8 Bottom Distribution Bars 11.17/.66 # 5

9 Top Main Bars 12.67/.50 # 4

10 Top Distribution Bars 11.17/.50 # 4

11 CF-3
NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

12 Bottom Main Bars 22.17/.62 # 5

13 Bottom Distribution Bars 11.17/.66 # 5

14 Top Main Bars 22.17/0.5 # 4

15 Top Distribution Bars 11.17/1 # 4


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

16 CF-4 23'-6" x 10'-3"

17 Bottom Main Bars 23.67/.66 # 5

18 Bottom Distribution Bars 10.42/.66 # 5

19 Top Main Bars 23.67/0.5 # 4


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

20 Top Distribution Bars 10.42/1 # 4

21 CF-5 16'-6" x 8'-6"

22 Bottom Main Bars 16.67/.66 # 5

23 Bottom Distribution Bars 8.67/.66 # 5


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

24 Top Main Bars 16.67/1 # 4

25 Top Distribution Bars 8.67/1 # 4

26 CF-6 15'-6" x 8'-6"

27 Bottom Main Bars 15.67/.66 # 5


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

28 Bottom Distribution Bars 8.67/.66 # 5

29 Top Main Bars 15.67/1 # 4

30 Top Distribution Bars 8.67/1 # 4

31 Sec A-A in check post


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

32 Main Bars 10.5-.33/9" # 4

33 Distribution Bars 2.5/.75+1 # 4

34 Sec A-A in check post Grid 3

35 Main Bars 3.5/9"+1 # 4


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

36 Distribution Bars 3/.75+1 # 4

37 Sec B-B in check post

38 Main Bars 10.5/9" # 4

39 Distribution Bars 3/.75+1 # 4


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

40 Sec A-A in Guard room

41 Main Bars 6.75/9" # 4

42 Distribution Bars 2.5/.75+1 # 4

43 FB-1 in Check post


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

44 Main Bars # 6

45 Main Bars # 6

46 Stirrups 9"x21" 9.52/.5+1 # 3

47 FB-2 in Check post


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

48 Main Bars # 6

49 Stirrups 22"x27" 10/.5+1 # 3

Total Steel in Rft


NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H

Weght Lbs/RFT

Total Weight Lbs

Total Weight Kg
NATIONAL UNIVERSITY OF SC
ME
Construction Category III appartments Block II IPC 3rd
Item : Beams

(H) Dia
S.No. Description Remarks X=2H
VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

8" 1 16 16 8.59 1.67 10.26

8" 1 14 14 10.09 1.67 11.76


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

- 1 21 21 8.59 1.33 9.92

- 1 21 21 10.09 1.33 11.42

8" 1 20 20 11.17 1.67 12.84


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

8" 1 18 18 12.67 1.67 14.34

- 1 26 26 11.17 1.33 12.50

- 1 23 23 12.67 1.33 14.00


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

7.5" 1 37 37 11.17 1.67 12.84

8" 1 18 18 22.17 1.67 23.84

6" 1 45 45 11.17 1.33 12.50

12" 1 12 12 22.17 1.33 23.50


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

8" 1 37 37 10.42 1.67 12.09

6" 1 17 17 22.17 1.67 23.84

6" 1 48 48 10.42 1.33 11.75


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

12" 1 11 11 22.17 1.33 23.50

8" 1 26 26 8.67 1.67 10.34

8" 1 14 14 16.67 1.67 18.34


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

6" 1 18 18 8.67 1.33 10.00

12" 1 10 10 16.67 1.33 18.00

8" 1 25 25 8.67 1.67 10.34


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

8" 1 14 14 15.67 1.67 17.34

6" 1 25 25 8.67 1.33 10.00

12" 1 10 10 16.67 1.33 18.00


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

9" 1 15 15 2.17 1.33 3.50

9" 1 4 4 10.5 1.33 11.83

9" 1 6 6 2.67 1.33 4.00


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

9" 1 5 5 3.5 1.33 4.83

9" 1 15 15 2.67 1.33 4.00

9" 1 5 5 12.34 1.33 13.67


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

9" 2 10 20 2.17 1.33 3.50

9" 2 4 8 6.74 1.33 8.07


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

9" 1 2 2 9.52 2 11.52

9" 1 2 2 4.93 2 6.93

9" 1 20 20 4.5 0.50 5.00


VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

1 4 4 10 11.5 21.50

9" 2 21 42 7.91 0.50 8.41

0.00
VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

2.67

0.00

0.00

TOTAL
VERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD
MEASUREMENT SHEET
Consultant: NUST
Contractor: Mushar
Cut Length

No of No's in Total Actual length Overla #3 #4,#5


C/C Hook
Beams each No's of steel bar p

of steel bar 1"Dia

3.08
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

164.16

164.64
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

208.32

239.82

256.80
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

258.12

325.00

322.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

475.08

429.12

562.50

282.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

447.33

405.28

564.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

258.50

268.84

256.76
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

180.00

180.00

258.50
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

242.76

250.00

180.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

52.50

47.32

24.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

24.15

60.00

68.35
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

70.00

64.56
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

23.04

13.86

100.00
Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

86.00

353.22

122.90 3627.39 3963.02 453.22


Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

1.502 1.043 0.668 0.376

184.60 3783.37 2647.30 170.41

83.73 1716.12 1200.81 77.30

TOTAL QTY G-60


Consultant: NUST
Contractor: Musharraf Concrete Builders

#3 #4,#5#6 =Grade60

3/4"Dia 5/8"Dia 1/2"Dia 3/8"Dia

3.08 Tons 3077.96 KG


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Ground floor slab of Check post


1

2 Main Bars 15.49/0.58+1 1 # 3 7"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

3 Distribution Bars 10/0.66+1 1 # 3 8"


Extra Bars on shorter Span (10/.66+1) *2
4 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on Longer Span (15.49/.66+1) *2


5 1 # 3 8"

6 Ground floor slab of (Guard room )


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

7 Main Bars 15.49/0.66+1 1 # 3 8"

8 Distribution Bars 6.75/0.66+1 1 # 3 6"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span (6.75/.75+1)


9 1 # 3 9"
Extra Bars on Longer Span (15.49/.75+1)
10 1 # 3 9"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

1st floor Slab Rienforcement of Check Post


11

12 Main Bars 15.49/0.58+1 1 # 3 7"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

13 Distribution Bars 10/0.66+1 1 # 3 8"


Extra Bars on shorter Span (10/.66+1) *2
14 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on Longer Span (15.49/.66+1) *2


15 1 # 3 8"

16
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Slab Rienforcement of Top Roof


17
Slab A central long slab
18
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

19 Main Bars 49.5/.5+1 1 # 3 6"

20 Distribution Bars 15.5/.66+1 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span 15.5/.66+1


21 1 # 3 8"
Extra Bars on Longer Span 49.5/.58+1
22 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

23

24 Slab B full narrow sides slabs


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

25 Main Bars 99.25/.66+1 1 # 3 8"

26 Distribution Bars 5/.66+1 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span 5/.66+1


27 1 # 3 8"
Extra Bars on Longer Span 99.25/0.58+1
28 1 # 3 7"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

29

30 Slab C outer slab near check post


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

31 Main Bars 15.5/.66+1 1 # 3 8"

32 Distribution Bars 4.25/.66+1 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span 4.25/.58+1


33 1 # 3 7"
Extra Bars on Longer Span 15.5/.66+1
34 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

35

36 Slab D small slabs


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

37 Main Bars 15.5/.66+1 1 # 3 8"

38 Distribution Bars 6.75/.58+1 1 # 3 7"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span 6.75/.66+1


39 1 # 3 7"
Extra Bars on Longer Span 15.5/.66+1
40 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

41

42 Slab E outer
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

43 Main Bars 15.5/.66+1 1 # 3 8"

44 Distribution Bars 14.25/.66+1 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Extra Bars on shorter Span 14.25/.58+1


45 1 # 3 7"
Extra Bars on Longer Span 15.5/.66+1
46 1 # 3 8"
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

47

48 Parapet Steel
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

49 Vertical Bars 101/.66+1 Grid 1&9 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

50 Horizental Bars Grid 1&9 1 # 4


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

51 Vertical Bars 27/.66+1 Grid A&G 1 # 3 8"

52 Horizental Bars Grid A&G 1 # 4


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Parapet Steel on check Post


53

54 Vertical Bars 57/0.66+1 Grid 1&9 1 # 3 8"


NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

55 Horizental Bars Grid 1&9 1 # 4

56
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Total Roof Slab Steel in Rft

Weght Lbs/RFT
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

Total Weight Lbs

Total Weight Kg
NATIONAL UNI

Construction of GA

Item : Slab Rienforcement

S.No. Description Dia C/C

TOTAL QTY G-40


TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 28 28 11.38
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 16 16 16.87

1 32 32 4.75
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 48 48 3.25
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 24 24 8.13

1 11 11 16.87
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 10 10 16.87

1 22 22 8.13
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 28 28 11.38
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 16 16 16.87

1 32 32 4.75
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 48 48 3.25
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 100 100 17

1 24 24 50.19 2.31
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 24 24 50.19 2.31

1 86 86 17
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 151 302 6.44

2 9 18 99.94 4.62
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 9 18 99.94

2 172 344 6.44


TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 24 24 5.69

1 7 7 17
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 7 7 17

1 24 24 5.69
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 24 48 6.63

2 13 26 17
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 13 26 17

2 24 48 6.63
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 24 24 14.13

1 23 23 17
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 26 26 17

1 24 24 14.13
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 154 308 2.88 0.25


TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 5 10 101 6.16
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

2 42 84 2.88 0.25

2 5 10 27
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 87 87 1.38 0.25
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab

1 2 2 57
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
TIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY H-12 ISLAMABAD

MEASUREMENT SHEET
ction of GATE No 10

No of No's in each Total No's Actual length Overlap Hook


slab
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

11.38 318.64
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

16.87 269.92

4.75 152.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

3.25 156.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

8.13 195.12

16.87 185.57
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

16.87 168.70

8.13 178.86
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

11.38 318.64
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

16.87 269.92

4.75 152.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

3.25 156.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

17 1,700.00

52.5 1,260.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

52.5 1,260.00

17 1,462.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

6.44 1,944.88

104.56 1,882.08
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

99.94 1,798.92

6.44 2,215.36
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

5.69 136.56

17 119.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

17 119.00

5.69 136.56
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

6.63 318.24

17 442.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

17 442.00

6.63 318.24
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

14.13 339.12

17 391.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

17 442.00

14.13 339.12
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

3.13 964.04
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

107.16 1,071.60
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

3.13 262.92

27 270.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

1.63 141.81
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

57 114.00
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

0.00 0.00 0.00 1455.60 20956.22


2.67 1.502 1.043 0.668 0.376
Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

0.00 0.00 0.00 972.34 7879.54

0.00 0.00 0.00 441.05 3574.14


Consultant: NUST

Contractor: Musharraf Concret Builders


Cut Length
#3=Grade 40 & #4,#5 =Grade60

#8 Dia #6 Dia #5 Dia #4 Dia #3 Dia

4.02 Tons 4015.19 KG


Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:

Page. /

IPC -1

Brick work below G.L

Burnt brick work in wall over 115 mm thick laid and jointed in cement mortar 1:6 straight or
and over upto 4.25 m depth

S/NO DESCRIPTIPON No NOS LENGTH

Brick work
1

Brick work on Grid 3


2 1 1 13

Brick work on Grid B


3 1 1 10

Brick work on Grid 2


4 1 1 14.24

Brick work on Grid F


5 1 1 6.75

Brick work on Grid 1


6 1 1 20.99

Brick work on Grid 4,5


7 1 2 12.99
Brick work on Grid 6
8 1 2 13.62

Brick work of C4
9 1 3 2

Brick work of Ground floor

Burnt brick work in wall over 115 mm thick laid and jointed in cement mortar 1:6 straight or
and over upto G.F roof level.

S/NO DESCRIPTIPON No NOS LENGTH

Brick work
1

Brick work on Grid D Check post


2 1 1 13

Brick work on Grid 3 Check post


3 1 1 10

Brick work on Grid C Check post


4 1 1 14.25

Brick work on Grid 7 Check post


5 1 1 6.75
Brick work on Grid A
6 1 1 21

Brick work on Grid E ,F


7 1 2 12.99

Brick work on Grid 3 gaurd room


8 1 1 6.75

Brick work on Grid 7 gaurd room


9 1 1 4.25

Brick work on Grid B


10 1 2 6

Brick work on Grid 4


11 1 1 10

Brick work of C4
13 1 3 2

Deduction

D1 3'-6" x 7'-9"
1 1 -2 3.5

D2 2'-6" x 7'-9"
2 1 -1 2.5

V1 3'-0" x 3'-0"
3 1 -1 3

W1 6'-9" x 6'-9" x6'


4 1 -1 13.5

W3 4'-3" x 6'-0"
5 1 -1 4.25
W4 6'-0" x 6'-0"
6 1 -2 6

Brick work of G.F floor

Burnt brick work in wall 115 mm thick laid and jointed in cement mortar 1:4 straight or to cu
over upto G.F roof level

S/NO DESCRIPTIPON No NOS LENGTH

Brick work in Check post Partition


12 1 1 4

Brick work of 1st floor

Burnt brick work in wall over 115 mm thick laid and jointed in cement mortar 1:6 straight or
and over upto 1st.F roof level.

S/NO DESCRIPTIPON No NOS LENGTH

Brick work
1

Brick work on Grid D Check post


2 1 1 13
Brick work on Grid 3 Check post
3 1 1 10

Brick work on Grid C Check post


4 1 1 14.25

Brick work on Grid 7 Check post


5 1 1 6.75

Brick work on Grid A


6 1 1 21

Brick work on Grid B


10 1 2 6

Brick work on Grid E F


10 1 4 6

Deduction

D1 3'-6" x 7'-9"
1 1 -2 3.5

W2 6'-9" x 6'-9" x6'


4 1 -1 13.5
0 at NUST Campus,
slamabad

Consultant : PMO NUST

Contractor : Musharraf Concrete Builders

ork below G.L

n cement mortar 1:6 straight or to curve with inner radius of 6 m


to 4.25 m depth

BREADTH HEIGHT QUANTITY UNIT

1.125 3.75 54.84 CFT

1.125 3.75 42.19 CFT

1.125 3.75 60.08 CFT

1.125 2.25 17.09 CFT

1.125 2.25 53.13 CFT

1.125 2.25 65.76 CFT


1.125 3.25 99.60 CFT

1.125 4 27.00 CFT

TOTAL 419.68 CFT

TOTAL 11.88 CUM

of Ground floor

n cement mortar 1:6 straight or to curve with inner radius of 6 m


o G.F roof level.

BREADTH HEIGHT QUANTITY UNIT

0.75 9.75 95.06 CFT

0.75 9.75 73.13 CFT

0.75 9.75 104.20 CFT

0.75 9.75 49.36 CFT


0.75 9.75 153.56 CFT

0.75 9.75 189.98 CFT

0.75 9.75 49.36 CFT

0.75 9.75 31.08 CFT

0.75 9.75 87.75 CFT

0.75 9.75 73.13 CFT

1.125 22.5 151.88 CFT

TOTAL 1058.48 CFT

0.75 7.75 -40.69 CFT

0.75 7.75 -14.53 CFT

0.75 3 -6.75 CFT

0.75 6 -60.75 CFT

0.75 6 -19.13 CFT


0.75 6 -54.00 CFT

TOTAL -195.84 CFT

TOTAL 862.64 CFT

TOTAL 24.42 CUM

rk of G.F floor

ment mortar 1:4 straight or to curve with inner radius of 6 m and


G.F roof level

BREADTH HEIGHT QUANTITY UNIT

0.375 10.75 16.13 CFT 0.45654

TOTAL 0.46 CUM

rk of 1st floor

n cement mortar 1:6 straight or to curve with inner radius of 6 m


o 1st.F roof level.

BREADTH HEIGHT QUANTITY UNIT

0.75 12 117.00 CFT


0.75 12 90.00 CFT

0.75 12 128.25 CFT

0.75 12 60.75 CFT

0.75 12 189.00 CFT

0.75 12 108.00 CFT

0.75 6.75 121.50 CFT

TOTAL 814.50 CFT

0.75 7.75 -40.69 CFT

0.75 6 -60.75 CFT

TOTAL -101.44 CFT

TOTAL 713.06 CFT

TOTAL 20.19 CUM


GRAND TOTAL 56.49 CUM
Concrete of stem column
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 Columns
2 C1 1 3 2 0.75
3 C2 1 2 3 0.75
4 C3 1 1 4 0.75
5 C4 1 3 3 1.125
6 C5 1 3 4 0.75
7 C6 1 1 2 0.75

Concrete of Ground floor


column
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 Columns
2 C1 1 3 2 0.75
3 C2 1 2 3 0.75
4 C3 1 1 4 0.75
5 C4 1 3 3 1.125
6 C5 1 3 4 0.75
7 C6 1 1 2 0.75

Concrete of 1st floor column


S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 Columns
2 C1 1 3 2 0.75
4 C3 1 1 4 0.75
C5 1 3 4 0.75
C6 1 1 2 0.75
HEIGHT QUANTITY UNIT

3.75 16.88 CFT


3.75 16.88 CFT
3.75 11.25 CFT
2.5 25.31 CFT
2.25 20.25 CFT
2.25 3.38 CFT
TOTAL 93.94 CFT
TOTAL 2.66 CUM

HEIGHT QUANTITY UNIT

10.5 47.25 CFT


19.5 87.75 CFT
10.5 31.50 CFT
22.5 227.81 CFT
10.5 94.50 CFT
10.5 15.75 CFT
TOTAL 504.56 CFT
TOTAL 14.29 CUM

HEIGHT QUANTITY UNIT

12.25 55.13 CFT


12.25 36.75 CFT
6 54.00 CFT
6 9.00 CFT
TOTAL 154.88 CFT
TOTAL 4.38 CUM

GRAND TOTAl 21.33 CUM

54.75
Concrete of plinth beam
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 Plinth beam
2 Beam on Grid 2,3,4,5 1 4 16.99 1.125
3 Beam on Grid B, F 1 2 11.5 1.125
4 Beam on Grid 1 1 1 26.99 1.125

Concrete of G.Floor beams


S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 G.F beam
2 Beam1 1 1 11.5 0.75
3 Beam 2 1 1 8.25 0.75
4 Beam 3 1 1 11.5 0.75
Beam4 1 1 8.25 0.75
Beam5 1 1 15.5 0.75
Beam6 1 1 15.5 0.75
Beam7 1 2 15.5 0.75
Band beam check post 1 2 35.75 0.75
Band beam Guard room 1 2 11.5 0.75
Lintel of chek post 1 2 15.5 0.75
Lintel of Guard room 1 2 15.5 0.75

Concrete of Inverted
beams
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
1 Top Roof Beams
2 Inverted Beam1 1 1 101.25 1.25
3 Inverted Beam 2 1 1 101.25 1.25
4 Inverted Beam 3 1 1 17 0.75
Inverted Beam4 1 1 17 0.75
Parapet Concrete
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
Top Roof Parapet Grid G
1 &1 1 2 101.25 0.5
Top Roof Parapet on
2 Grid A 1 2 26.34 0.5
Top Roof Parapet on
3 Check post 1 1 55.68 0.5

256.5 0.33
HEIGHT QUANTITY UNIT

0.75 57.34 CFT


0.75 19.41 CFT
0.75 22.77 CFT
TOTAL 99.52 CFT
TOTAL 2.82 CUM

HEIGHT QUANTITY UNIT

1 8.63 CFT
1 6.19 CFT
1 8.63 CFT
1 6.19 CFT
1 11.63 CFT
1 11.63 CFT
1 23.25 CFT
0.75 40.22 CFT
0.75 12.94 CFT
1 23.25 CFT
1 23.25 CFT
TOTAL 175.78 CFT 122.53 3.469175
TOTAL 4.98 CUM

HEIGHT QUANTITY UNIT

2 253.13 CFT
2 253.13 CFT
1.5 19.13 CFT
1.5 19.13 CFT
TOTAL 544.50 CFT
TOTAL 15.42 CUM

HEIGHT QUANTITY UNIT

2.5 253.13 CFT

2.5 65.85 CFT

1.5 41.76 CFT


TOTAL 360.74 CFT
TOTAL 10.21 CUM

33.42

GRAND TOTAL 33.42

2.5 75.23
211.6125
5.99
Slab Concrete G.floor
S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT
1 Slabs
2 Check post 1 1 11.5 16.99 0.5
3 Guard room 1 1 8.25 16.99 0.5
TOTAL
TOTAL

Slab Concrete 1st.floor


S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT
1 Slabs
2 Check post 1 1 11.5 16.99 0.5
TOTAL
TOTAL

Slab Concrete Top roof


S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT
1 Slabs
2 1 1 101.25 27 0.5

4 Deduction
5 Check post slab -1 1 11.5 17 0.5
6 Voids 2'-6"x15'-6" -1 3 2.5 15.5 0.5
TOTAL
TOTAL

Grand Total
QUANTITY UNIT

97.69 CFT
70.08 CFT
167.78 CFT
4.75 CUM

QUANTITY UNIT

97.69 CFT
97.69 CFT
2.77 CUM

QUANTITY UNIT

1366.88 CFT

-97.75 CFT
-58.13 CFT
1211.00 CFT
34.29 CUM
#REF!
#REF!
41.80 CUM
41.80
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:


Page. /
IPC -1

13mm thick cement plaster 1:4 finished

S/NO DESCRIPTIPON No NOS

1 Plaster below G.L Raft Plaster

2 Check post CF1 CF2 CF3 1 1

3 Guard Room CF5 CF6 1 2

4 CF4 1 1

5 SEC AA IN GUARD ROOM 2 2

6 SEC AA IN Check Post 1 2

7 SEC BB IN Check Post 1 1


Space b/w SEC AA &BB IN Check
8 Post 1 2

9 F.B 1 1 1

10 F.B 2 1 2

11 Brick work Plaster


12 Check Post
Brick work on Grid 3,2
13 2 2

Brick work on Grid B,F


14 2 2

Brick work on Grid 1


15 1 2

Guard Room
16
Brick work on Grid 4
17 1 2

Brick work on Grid 5


18 1 2

Brick work on Grid F


19 1 2

Brick work on Grid 6


20 1 2

Brick work of C4
21 1 3

13mm thick cement plaster 1:4 finished as s

S/NO DESCRIPTIPON No NOS


1 Plaster Above G.L outer
2 Check post 1 1

3 Guard room 1 1

4 C4 columns 1 3

5 Wall on Grid 1 outer 1 1

6 Wall on Grid 1 inner Duct 1 1

7 Wall on Grid 1 inner 1 1

5 Deduction

6 Check post 4'-4" door way -1 1

7 V1 -1 1

8 W1 -1 1

9 D1 -1 1

10 w2 -1 1

11 Guard room -1

12 D1 -1 1

13 w4 -1 2

14 w3 -1 1

15 steel louers -1 1

16

Ceiling Plaster

1 Roof ceiling 101.25 x 27 1 1


2 Roof of Checkpost ground floor 1 2

3 Roof of Guard Room ground floor 1 2

4 Parapet front outer side Grid A ,G 2 1

5 Parapet front inner side Grid A ,G 2 1

6 Parapet on Grid 6 & 1 outer 2 1

7 Parapet on Grid 6 & 1 inner 2 1

8 inverted Beam1 1 1

9 inverted Beam2 1 1

10 Parapet on Check post 1 1

11 Deductions

12 Voids -3 1

plaster of railing wall

S/NO DESCRIPTIPON NOS NOS

1 Railing on C4 columns side 1 1


2 Railing on check post side 1 1
(Internal ) 13mm thick cement plaster 1:6 finished
S/NO DESCRIPTIPON No NOS

Guard room and check post Roof Plaster

1 WALLS INNER PLASTER

2 Check post walls ground floor 1 1

3 Check post walls 1st floor 1 1

4 Bath walls internal plaster 1 1

5 Bath walls outer plaster 1 1

6 Guard room walls ground floor 1 1

7 Guard room walls 1st floor 1 1

8 Deduction

9 Check post 4'-4" door way -1 1

10 V1 -1 1

11 W1 -1 1

12 D1 -2 1

13 D2 -1 1

14 w2 -1 1

15 Guard room -1

16 D1 -1 1

17 w4 -1 1

18 w3 -1 1
19 steel louers -1 1

plaster
S/NO DESCRIPTIPON NOS LENGTH

1 Railing on C4 columns side 1 280


2 Railing on check post side 1 245
Gate 10 at NUST Campus,
H-12, Islamabad

Consultant : PMO NUST

Contractor : Musharraf Concrete Builders

plaster 1:4 finished as specified

LENGTH BREADTH HEIGHT QUANTITY UNIT

135 1.5 202.50 SFT

48 1.5 144.00 SFT

67.5 1.5 101.25 SFT

6.75 0.75 20.25 SFT

10.5 0.75 15.75 SFT

22 0.75 16.50 SFT

2.5 1.5 7.50 SFT

10 4.25 42.50 SFT

5.58 7.25 80.91 SFT


17 3.75 255.00 SFT

11.5 3.75 172.50 SFT

26.75 2.25 120.38 SFT

0.00 SFT

18.5 2.25 83.25 SFT

18.5 2.25 83.25 SFT

3.25 3.25 21.13 SFT

14 3.25 91.00 SFT

12.24 4 146.88 SFT

TOTAL 1604.54 SFT

A TOTAL 149.12 SQM

t plaster 1:4 finished as specified

LENGTH BREADTH HEIGHT QUANTITY UNIT


57 26 1482.00 SFT

50.5 20 1010.00 SFT

12.25 22.5 826.88 SFT 76.84712

28.5 22 627.00 SFT

7.5 20 150.00 SFT

17 20 340.00 SFT

TOTAL 4435.88 SFT

0.00 SFT

4.33 7.75 -33.56 SFT

3 3 -9.00 SFT

13.5 6 -81.00 SFT

3.5 7.75 -27.13 SFT

13.5 1.5 -20.25 SFT

0.00 SFT

3.5 7.75 -27.13 SFT

6 6 -72.00 SFT

4.25 6 -25.50 SFT

33 6 -198.00 SFT

Total of
Deduction -493.56 SFT

TOTAL 3942.32 SFT 366.3864

B TOTAL 366.39 SQM

100.5 27.67 2780.84 SFT


10 15.5 310.00 SFT

6.75 15.5 209.25 SFT

101.25 4 810.00 SFT

100.59 2.5 502.95 SFT

27 4 216.00 SFT

26.34 2.5 131.70 SFT

100.59 5.25 528.10 SFT

100.59 5.25 528.10 SFT

57 2.33 132.81 SFT

SFT

15.5 2.5 -116.25 SFT


TOTAL 6033.49 SFT
C TOTAL 560.73 SQM
ster of railing wall

LENGTH BREADTH HEIGHT QUANTITY UNIT

280 6.75 1890.00 Sft


245 6.75 1653.75 Sft
Total 3543.75 Sft
D Total 329.34 Sqm
A+B+C+D Total 1405.59 Sqm
plaster 1:6 finished as specified
LENGTH BREADTH HEIGHT QUANTITY UNIT

SFT

51 10.75 548.25 SFT

51 12 612.00 SFT

9.375 10.75 100.78 SFT

10.75 10.75 115.56 SFT

44.5 10.75 478.38 SFT

44.5 6.75 300.38 SFT

SFT

4.33 7.75 -33.56 SFT

3 3 -9.00 SFT

13.5 6 -81.00 SFT

3.5 7.75 -54.25 SFT

2.5 7.75 -19.38 SFT

13.5 1.5 -20.25 SFT

0.00 SFT

3.5 7.75 -27.13 SFT

6 6 -36.00 SFT

4.25 6 -25.50 SFT


31 6 -186.00 SFT
TOTAL 1663.29 SFT
TOTAL 154.58 Sqm

Total 1081.70

13243.63

plaster
BREADTH HEIGHT QUANTITY UNIT

6.75 1890.00 Sft


6.75 1653.75 Sft
Total 3543.75 Sft
Total 329.34 Sqm
#REF!
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST

Page. /
Contractor : Musharraf Concrete
IPC -1 Builders

Wall finish, coat of Graffi to Wall coating 1.5 mm to 3.00 mm thick, in any colour, (straight and
swirl),.

S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT

Parapet

1 Parapets Graffi 1 2 101.23 5.75

Parapets Graffi of louvers


2 grid A 1 1 28 2.67

3 Parapets Graffi 1 1 28 5.75

4 C4 columns 1 3 12.25 24.5

5 Walls

6 Grid A wall 1 1 33.5 20

7 Wall on grid C 1 1 17 20

8 Ceiling
9 Roof ceiling 101.25 x 27 1 1 100.5 27.67

10 Deductions

11 check post -1 1 10 15.5

12 Voids -1 3 15.5 2.5

13 D1 -1 1 3.5 7.75

TOTAL

A TOTAL

Wall finish, coat of Graffi to Wall coating 1.5 mm to 3.00 mm thick, in any colour, (straight and swirl),.

S/NO DESCRIPTIPON NOS NOS LENGTH BREADTH HEIGHT

Railing on C4 columns
1 side 1 1 280 6.75

Railing on check post


2 side 1 1 245 6.75

Total

B Total

A+B Total
,

usharraf Concrete
ilders

in any colour, (straight and

QUANTITY UNIT

1164.15 Sft

74.76 Sft

161.00 Sft

900.38 Sft

Sft

670.00 Sft

340.00 Sft

0.00 Sft
2780.84 Sft

Sft

-155.00 Sft

-116.25 Sft

-27.13 Sft

5792.74 SFT

538.36 Sqm

colour, (straight and swirl),.

QUANTITY UNIT

1890.00 Sft

1653.75 Sft

3543.75 Sft

329.34 Sqm

867.70 Sqm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. / Contractor :
IPC -1

Surface preparation by using putty on plastered wall or ceiling to form smooth ba


plastic emulsion paint all as specified..and 3 coats of plastic emulsion paint on new
as walls including all detached attachment . (Internal)
S/NO DESCRIPTIPON No NOS LENGTH BREADTH
Guard room and check post
WALLS INNER
1 Roof of Checkpost ground floor 1 2 10

2 Roof of Guard Room ground floor 1 1 6.75


3 Check post walls ground floor 1 1 51
4 Check post walls 1st floor 1 1 51
5 Bath walls internal 1 1 9.375
6 Bath walls outer 1 1 10.75
7 Guard room walls ground floor 1 1 44.5
8 Guard room walls 1st floor 1 1 44.5
9 Deduction
10 Check post 4'-4" door way -1 1 4.33
11 V1 -1 1 3
12 W1 -1 1 13.5
13 D1 -2 1 3.5
14 D2 -1 1 2.5
15 w2 -1 1 13.5
16 Guard room -1
17 D1 -1 1 3.5
18 w4 -1 1 6
19 w3 -1 1 4.25
20 steel louers -1 1 31
mpus,

ultant : PMO NUST


ntractor : Musharraf Concrete
Builders

g to form smooth base for distemper,


mulsion paint on new or old work such
ent . (Internal)
HEIGHT QUANTITY UNIT

SFT
15.5 310.00 SFT

15.5 104.63 SFT


10.75 548.25 SFT
12 612.00 SFT
4.75 44.53 SFT
10.75 115.56 SFT
10.75 478.38 SFT
6.75 300.38 SFT
SFT
7.75 -33.56 SFT
3 -9.00 SFT
6 -81.00 SFT
7.75 -54.25 SFT
7.75 -19.38 SFT
1.5 -20.25 SFT
0.00 SFT
7.75 -27.13 SFT
6 -36.00 SFT
6 -25.50 SFT
6 -186.00 SFT
TOTAL 2021.66 SFT
TOTAL 187.89 CUM
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO:


Page. /
IPC -1

Two coat of Elastomeric Cementitious Water Proofing Coating, applied as per ma


specified.

S/NO DESCRIPTIPON No NOS LENGTH

1 Inverted Beam 1 1 2 100.25

2 Wall of Steel louvers 1 1 27

9 Deduction

10 Check post -1 1 11.5


Gate 10 at NUST Campus,
H-12, Islamabad

Consultant : PMO NUST

Contractor : Musharraf Concrete Builders

oofing Coating, applied as per manufacturer's instructions as


specified.

BREADTH HEIGHT QUANTITY UNIT

1.5 300.75 SFT

23.67 639.09 SFT

SFT

1.5 -17.25 SFT

TOTAL 922.59
SFT

TOTAL 85.74 Sqm


Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : Musharraf Concrete Builders

Providing and laying, Porcelain Tiles glazed/ unglazed in any colour/print/texture exc 1600
sqcm on walls and floors,set in neat cement and jointed in white / coloured cement, complete,
as specified,imported (China).

S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT QUANTITY UNIT

ceiling

1 Check post Room 1 1 10.75 10 107.50 SFT


Check post way 4'-
2 4" area 1 1 4.75 4.33 20.57 SFT

4 Check post 1st floor 1 1 10 15.5 155.00 SFT


Check post 1st floor
5 choki riser 1 1 15 1 15.00 SFT
Guard room Ground
6 Floor 1 1 6.75 15.5 104.63 SFT
TOTAL 402.69 SFT
TOTAL 37.42 Sqm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST

Page. /
IPC -1 Contractor : Musharraf Concrete Buil

S/NO DESCRIPTIPON No NOS LENGTH BREADTH

Grey Tile
1

2 Check post 1 1 40

Check post windows ground floor


3 V (7.66+7.66)+ H (7.875+7.33) 1 1 30.53 0.16

4 Check post ventiltor ground floor 1 1 12.00 0.16

Check post windows 1st floor V


5 (1.5+1.5) +H (7.875+7.33) 1 1 18.21 0.16

6 Deduction

7 Check post 4'-4" door way -1 1 4.33

8 V1 -1 1 3

9 W1 -1 1 13.5

10 D1 -1 1 3.5

11 w2 -1 1 13.5

12

13

14 Red Tile

15 Guard room 1 1 50.5


Guard room Door Chowkat
16 3.5+7.75+7.75 1 1 19
17 Guard room Side windows6+6+6 1 2 18 0.16
Guard room Front windows
18 4.25+6+6 1 1 16.25 0.16
Guard room 1st floor louvers sills
19 10+6+6 1 2 22 0.75
Guard room 1st floor louvers sills
20 6.75+6+6 1 1 18.75 0.75
Guard room 1st floor louvers sills
21 3.5+6+6 1 1 15.5 0.75

22 Deduction -1

23 D1 -1 1 3.5

24 w4 -1 2 6

25 w3 -1 1 4.25

26 steel louers -1 1 31

27

28

window Sill Marble


S/NO DESCRIPTIPON No NOS LENGTH BREADTH

window Sill

1 Check post Window 1 1 16.66 1.125

2 Check post washroom ventilator 1 1 3 1.125

3 Check post ventilator 1st floor 1 1 16.66 1.125

4 Guard room side windows 1 2 6 1.125

5 Guard room Front windows 1 1 4.25 1.125

6 Guard Room Steps tread 1 1 5 1.5

7 Guard Room Steps riser 1 1 8 0.66

8 check post 1st floor step treads 1 7 5 1


9 Landing 1 1 5 3.16
check post 1st floor step treads 2nd
10 flight 1 12 4 1
check post 1st floor landing 2nd
11 flight 1 1 6 4

11 Foot path to café steps tread 1 1 10 1.33

11 Riser 1 1 10 0.5

Skirting 4"
S/NO DESCRIPTIPON No NOS LENGTH BREADTH

39 WALLS INNER Paint

40 Check post walls ground floor 1 1 46.12

40 Check post 1st floor 1 1 35.84

41 Check post walls 1st floor 1 1 51

44 Guard room walls ground floor 1 1 44.5

46 Deduction

54 D1 from guard room -1 1 3.5


BATH wall Tile
S/NO DESCRIPTIPON No NOS LENGTH BREADTH

1 Bath floor 1 1 5.375 4

2 Bath walls internal 1 1 18.75

3 Bath ventilator jambs 1 2 3 0.5

4 Door jambs 1 1 18 0.16

Deduction

5 D2 -1 1 2.5

6 V1 -1 1 3
sultant : PMO NUST

tractor : Musharraf Concrete Builders

HEIGHT QUANTITY UNIT

27 1080.00 SFT

4.88 SFT

1.92 SFT

2.91 SFT

7.75 -33.56 SFT

3 -9.00 SFT

6 -81.00 SFT

7.75 -27.13 SFT

1.5 -20.25 SFT

TOTAL 918.78 SFT

TOTAL 85.39 SQM

19.5 984.75 SFT

0.375 7.13 SFT 153.13


2.88 SFT

2.60 SFT

16.50 SFT

14.06 SFT

11.63 SFT

0.00 SFT

7.75 -27.13 SFT

6 -72.00 SFT

6 -25.50 SFT

6 -186.00 SFT

TOTAL 728.92 SFT

TOTAL 67.74 SQM

HEIGHT QUANTITY UNIT

18.74 SFT

3.38 SFT

18.74 SFT

13.50 SFT

4.78 SFT

7.50 SFT

5.28 SFT

35.00 SFT
15.80 SFT

48.00 SFT

24.00 SFT

13.30 SFT

5.00 SFT

TOTAL 213.02 SFT

TOTAL 19.80 SQM

HEIGHT QUANTITY UNIT

46.12 RFT

35.84 RFT

51.00 RFT

44.50 RFT

0.00 RFT

-3.50 RFT

TOTAL 173.96 RFT


TOTAL 53.04 Mtr
HEIGHT QUANTITY UNIT

21.50 SFT

7 131.25 SFT

3.00 SFT

2.88 SFT

7 -17.50 SFT 49.70

3 -9.00 SFT
TOTAL 132.13 SFT
TOTAL 12.28 Sqm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /

IPC -1 Contractor : Musharraf Concrete Builders

Providing and laying M.S louvers using MS box pipe 2"x2" including 3 x coat of paint complete all as per drawings
and as directed by engineer incharge.
S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT QUANTITY

Steel Louers in Guard


1 room 1st floor 1 1 31 6 186.00
Steel louvers on Back
2 side 1 2 27 23.67 1278.18
TOTAL 1464.18
TOTAL 136.08

Construction of Gate 10 at NUST Campus,


Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
IPC -1 Contractor : Musharraf Concrete Builders

Providing and laying M.S louvers using MS box pipe 3"x5" including 3 x coat of paint complete all as per drawings
and as directed by engineer incharge.
S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT QUANTITY

1 C4 columns 1 2 6.81 18.67 254.29


TOTAL 23.63
f Concrete Builders

e all as per drawings

UNIT

SFT

SFT
SFT
SQM

f Concrete Builders

e all as per drawings

UNIT

SFT
Sqm
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /
Contractor : Musharraf Con
IPC -1 Builders
Providing and laying CC type B as screed on roof, surface
smooth with neat cement and steel trowel using crushed o
stone
S/NO DESCRIPTIPON No NOS LENGTH BREADTH HEIGHT
1 Slabs
2 1 1 100.25 27 0.25
4 Deduction
5 B1 & B2 -1 2 100.25 1.25 0.25
6 Voids 2'-6"x15'-6" -1 3 2.5 15.5 0.25
TOTAL
TOTAL
MO NUST

: Musharraf Concrete
Builders
oof, surface finished
ng crushed or broken
QUANTITY UNIT

676.69 CFT

-62.66 CFT
-29.06 CFT
584.97 CFT
16.56 CUM
Tuff tiles
S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT

Check post Side


1
From Pop up Barier side to
2 Check post wall 1 137 7.5
check post Door entrance
3 1 11.66 7.5
check post road side
4 1 17 3
check post stair side
5 1 17 3.83
check post front
6 1 10 17.25
check post front to curve
7 1 29 7.75
tuff tile from curve to
8 school entrance 1 212.25 7.75
Tuff tile in small
9 Portion 1 7.08 4.08
Loures Side tuff TILES
10 From Pop up Barier
side to loures 1st
11 column 1 138 7.75
Tuff tiles in Columns
12 front 1 17 2.5
Tuff tiles in Columns
13 Between 2 6.5 2.16
Tuff tile in Col front
14 curve 1 13 12
Tuff tile in Col front
15 curve to out side road 1 173 8
Tuff tile in last curve
16 with road 1 78.5 7.5

TOTAL

TOTAL
Kerb Stone

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


14" kerb stone
1
From Pop up Barier side to
2 Check post wall 2 137
check post Door entrance
3 1 14.78
check post road side
4 1 17
check post front
6 1 10
check post front to curve
7 1 33
from curve to school
8 entrance 1 167.25
inside from School to
9 Curve 1 87

Loures Side tuff TILES


10 From Pop up Barier
side to loures 1st
11 column 2 138
Tuff tiles in Columns
12 front 2 17
Tuff tile in Col front
14 curve 2 13
Tuff tile in Col front
15 curve to out side road 1 257.5
Middle tuff TILES
10

11 Front to guard room 1 43


Front to guard room
12 in center 1 226
Back to guard room
14 from pop up barrier 1 210
TOTAL

Kerb Stone

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


18" kerb stone
1

2 From Pop up Barier side to


Check post wall
1 236.33
QUANTITY UNIT

1027.50 SFT

87.45 SFT

51.00 SFT

65.11 SFT

172.50 SFT

224.75 SFT

1644.94 SFT

28.89 SFT

0.00 SFT

1069.50 SFT

42.50 SFT

28.08 SFT

156.00 SFT

1384.00 SFT

588.75 SFT

6570.96 SFT

610.68 Sqm
QUANTITY UNIT

274.00 RFT

14.78 RFT

17.00 RFT

10.00 RFT

33.00 RFT

167.25 RFT

87.00 RFT

RFT

0.00 RFT

276.00 RFT

34.00 RFT

26.00 RFT

257.50 RFT

0.00 RFT

43.00 RFT

226.00 RFT
210.00 RFT
1675.53 RFT
1677

QUANTITY UNIT

236.33 SFT
237 Nos
Excavation

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


Check post Side
1
From Pop up Barier side to
2 Check post wall 1 137 8 1.5
check post Door entrance
3 1 11.66 8 1.5
check post road side
4 1 17 3.5 1.5
check post stair side
5 1 17 3.83 1.5
check post front
6 1 10.5 17.25 1.5
check post front to curve
7 1 29 8.25 1.5
tuff tile from curve to
8 school entrance 1 212.25 8.25 1.5
Tuff tile in small
9 Portion 1 7.08 4.08 1.5

Loures Side tuff TILES


10 From Pop up Barier
side to loures 1st
11 column 1 138 8 1.5
Tuff tiles in Columns
12 front 1 17 3 1.5
Tuff tiles in Columns
13 Between 2 6.5 2.16 1.5
Tuff tile in Col front
14 curve 1 13 12.5 1.5
Tuff tile in Col front
15 curve to out side road 1 173 8.5 1.5
Tuff tile in last curve
16 with road 1 78.5 8 1.5
TOTAL

TOTAL

LEAN

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


Check post Side
1
From Pop up Barier side to
2 Check post wall 1 137 8 0.25
check post Door entrance
3 1 11.66 8 0.25
check post road side
4 1 17 3.5 0.25
check post stair side
5 1 17 3.83 0.25
check post front
6 1 10.5 17.25 0.25
check post front to curve
7 1 29 8.25 0.25
tuff tile from curve to
8 school entrance 1 212.25 8.25 0.25
Tuff tile in small
9 Portion 1 7.08 4.08 0.25
Loures Side tuff TILES
10 From Pop up Barier
side to loures 1st
11 column 1 138 8 0.25
Tuff tiles in Columns
12 front 1 17 3 0.25
Tuff tiles in Columns
13 Between 2 6.5 2.16 0.25
Tuff tile in Col front
14 curve 1 13 12.5 0.25
Tuff tile in Col front
15 curve to out side road 1 173 8.5 0.25
Tuff tile in last curve
16 with road 1 78.5 8 0.25

TOTAL

TOTAL
QUANTITY UNIT

1644.00 CFT

139.92 CFT

89.25 CFT

97.67 CFT

271.69 CFT

358.88 CFT

2626.59 CFT

43.33 CFT

1656.00 CFT

76.50 CFT

42.12 CFT

243.75 CFT

2205.75 CFT

942.00 CFT
10437.44 CFT

295.51 CUM

QUANTITY UNIT

274.00 CFT

23.32 CFT

14.88 CFT

16.28 CFT

45.28 CFT

59.81 CFT

437.77 CFT

7.22 CFT

276.00 CFT

12.75 CFT

7.02 CFT
40.63 CFT

367.63 CFT

157.00 CFT

1739.57 CFT

49.25 CUM
Excavation of Road

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


Steel loures side
1
From Pop up Barier side to
2 loures LAST column 1 144 5.25 1.5
From Last Column to end
3 1 174 9.5 1.5
Length in mid
4 1 25.58 7.98 1.5
Check Post side
10
from main road to
11 check post 1 173 9.04 1.5

12 length in mid 1 28 8.66 1.5


from Check post tp
13 barier side 1 126 5.58 1.5
Narrow strip towards
14 pop barier 1 113 2.83 1.5

15 Ramp 1 23.5 20.86 1.5

TOTAL

TOTAL

10" Shingle

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


Steel loures side
1
From Pop up Barier side to
2 loures LAST column 1 144 5.25 0.83
From Last Column to end
3 1 174 9.5 0.83
Length in mid
4 1 25.58 7.98 0.83
Check Post side
10 0.83
from main road to
11 check post 1 173 9.04 0.83

12 length in mid 1 28 8.66 0.83


from Check post tp
13 barier side 1 126 5.58 0.83
Narrow strip towards
14 pop barier 1 113 2.83 0.83

15 Ramp 1 23.5 20.86 0.83

TOTAL

TOTAL

water bound

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


Steel loures side
1
From Pop up Barier side to
2 loures LAST column 1 144 5.25 0.5
From Last Column to end
3 1 174 9.5 0.5
Length in mid
4 1 25.58 7.98 0.5
Check Post side
10 0.5
from main road to
11 check post 1 173 9.04 0.5
12 length in mid 1 28 8.66 0.5
from Check post tp
13 barier side 1 126 5.58 0.5
Narrow strip towards
14 pop barier 1 113 2.83 0.5

15 Ramp 1 23.5 20.86 0.5

TOTAL

TOTAL
QUANTITY UNIT

1134.00 CFT

2479.50 CFT

306.19 CFT

2345.88 CFT

363.72 CFT

1054.62 CFT

479.69 CFT

735.32 CFT

8898.91 CFT

251.95 CUM

QUANTITY UNIT

627.48 CFT
1371.99 CFT

169.43 CFT

1298.05 CFT

201.26 CFT

583.56 CFT

265.43 CFT

406.87 CFT

4924.06 CFT

139.41 CUM

QUANTITY UNIT

378.00 CFT

826.50 CFT

102.06 CFT

781.96 CFT
121.24 CFT

351.54 CFT

159.90 CFT

245.11 CFT

2966.30 CFT

83.98 CUM
Excavation of Road

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT QUANTITY


Retaining wall
1
Lean
2 1 147.67 3 0.33 146.19
Rubble masonary
2 1 147.67 1.75 4.16 1075.04
2" D.P.C
2 1 147.67 1.75 0.25 64.61

TOTAL 146.19

TOTAL 4.14
UNIT

CFT

CFT

CFT

CFT

CUM
Construction of Gate 10 at NUST Campus,
Sector H-12, Islamabad

BOQ item NO: Consultant : PMO NUST


Page. /

Contractor : Musharraf
IPC -1 Concrete Builders

Foot path
S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT
Footh path to cafe
1 76.16 5
1 76.16 5
1 76.16 5
TOTAL
TOTAL

S/NO DESCRIPTIPON NOS LENGTH BREADTH HEIGHT


steps marble
tread 10 5 1.33
riser 10 5 0.5
MS Railing 1 50 1.75 0.25
TOTAL
TOTAL
pus,

ltant : PMO NUST

ontractor : Musharraf
Concrete Builders

QUANTITY UNIT

0.00 CFT
0.00 CFT
0.00 CFT
0.00 CFT
0.00 CUM

QUANTITY UNIT

0.00 CFT
0.00 CFT
21.88 CFT
0.00 CFT
0.00 CUM