Shaping the Future of Construction

An Action Plan to
Accelerate Building
Information Modeling
(BIM) Adoption
In collaboration with The Boston Consulting Group
February 2018

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 1 15.02.18 16:19


World Economic Forum
91-93 route de la Capite
CH-1223 Cologny/Geneva
Switzerland
Tel.: +41 (0)22 869 1212
Fax: +41 (0)22 786 2744
Email: contact@weforum.org
www.weforum.org

World Economic Forum®

© 2018 – All rights reserved.

No part of this publication may be reproduced or


transmitted in any form or by any means, including
photocopying and recording, or by any information
storage and retrieval system.

REF 130218 - case 00041654 V2

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 2 15.02.18 16:19


Contents

Executive summary 4
1. Introduction 5
2. Key insights and recommended actions 7
2.1 Set the right motivation for BIM adoption 7
2.1.1 Articulate BIM’s benefits across the entire lifecycle 7
2.1.2 Think of BIM as a value creator, not as a cost factor 8
2.1.3 Approach BIM as the essential first step to IU digitalization 8
2.2 Enhance collaboration on projects 9
2.2.1 Use integrated contracts and redefine risk-return mechanisms 9
2.2.2 Set up early collaboration and communication among
stakeholders 9
2.2.3 Establish data-sharing standards and open systems 10
2.3 Enable all stakeholders 10
2.3.1 Establish BIM skills along the full value chain 10
2.3.2 Change behaviours and processes, not just technology 11
2.3.3 Make a long-term commitment and support innovative financing 11
3. Conclusion 12
Appendix 13
Roundtable participants 14
Contributors to the Future of Construction Initiative 15

An Action Plan to Accelerate BIM Adoption 3

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 3 15.02.18 16:19


Executive summary

To keep pace with innovation and be more productive, the highlight BIM's potential as a value creator rather than a
infrastructure and urban development (IU) industry must cost factor. In addition to the financial benefits, players must
embrace digitalization. Building information modeling (BIM) understand BIM’s strategic role as an essential first step to
is an important first step towards that. BIM is a collaborative industry digitalization.
process in which all parties involved in a project use
three-dimensional design applications, which can include Successful BIM adoption requires a high level of
additional information about assets’ scheduling, cost, collaboration among stakeholders. Steps toward that
sustainability, operations and maintenance to ensure include increased use of integrated contracts and open
information is shared accurately and consistently standards for data sharing. Adoption also requires a
throughout total assets’ lifecycles. BIM acts as the coordinated effort to attract new talent with digital and BIM
centrepiece of the industry’s digital transformation. It skills, upskill existing workers, and changing corporate
powers new technologies such as prefabrication, cultures to support new processes. As major owners of
automated equipment and mobile applications for team built assets, governments must make a long-term
collaboration. It also enables new services, and helps commitment to the technology by piloting it in public works
determine which new assets best complement existing built projects and creating regulations conducive to its
environments. acceptance, including backing innovative forms of
financing.
BIM adoption has been slow, despite its many advantages.
Only about one-third of IU companies describe themselves
as using at least BIM Level 2.1 Design and engineering firms
have been among the earliest adopters, followed by
construction firms. BIM has great potential to transform
operations and maintenance (O&M), but adoption by asset
operators lags behind other players, largely because the
technology is inaccurately perceived as a purely 3D design
application. Furthermore, commercial BIM applications to
support O&M remain scarce. Other deterrents include a
lack of clear benchmarks to determine return on investment
(ROI), substantial start-up costs, which can deter design
firms and other stakeholders working at the beginning of
projects to use BIM, and limited use of cost- and benefit-
sharing agreements.

To identify actions that could facilitate faster BIM adoption,


the World Economic Forum’s Future of Construction
Initiative – in collaboration with The Boston Consulting
Group, the Government of the United Kingdom, and Atkins
and Arup – hosted the “Accelerating BIM Adoption”
roundtable on 17 October 2017 in London. Among the
participants were 35 representatives from leading global
design, engineering and construction firms, asset
operators, industry associations, governments and
academia who convened to create the action plan outlined
in this report.

Providing players in the IU value chain with the right


motivation and understanding of BIM’s benefits could serve
as a foundation for faster adoption. It would also help

1
BIM Survey 2015 Results, Conject, 2015

4 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 4 15.02.18 16:19


Introduction

The IU industry2 is an integral part of the global economy. software applications could boost productivity, manage
Engineering and construction (E&C) activities (the core part complexity, reduce project delays and cost overruns, and
of the industry) generate approximately $10 trillion in annual enhance safety and quality. Within 10 years, full-scale
revenue, which equates to about 6% of global GDP. In digitalization could help the industry save an estimated 12%
recent years, however, the industry has failed to keep up to 20%, equal to $1 trillion to $1.7 trillion annually, according
with productivity gains made in other industries, hampering to The Boston Consulting Group.3
national economies’ wider growth. Digitalization has the
potential to change this situation. Connected sensors, The following graphic shows some of the most promising
intelligent construction equipment, mobile devices and digital technologies for improving productivity in the
industry (see Illustration 1).

Illustration 1: 10 Technologies that Can Improve IU Industry Productivity

Source: World Economic Forum, The Boston Consulting Group

Most of these technologies require accurate, consistent Modern prefabrication, for example, relies on accurate
data from different project stakeholders. BIM systems that information from BIM models to produce 3D objects and
allow stakeholders to produce, collect, store and share scheduling data that allow for accurate production and
asset information can provide the data. As the successor to just-in-time delivery of modules from factories to
traditional computer-aided design (3D CAD), BIM stores construction sites. Beyond supporting new technologies,
and provides 3D object data. It also can include shared BIM optimizes and automates asset design, supports
information on scheduling (4D), cost (5D), sustainability (6D) scenario testing and decision-making, verifies
and operations and maintenance (O&M) (7D). constructability, enables clash analysis, improves project
and investment planning, ensures project control and
stores information for preventive maintenance, among other
2
functions.
Engineering and construction (E&C) represent the core of the infrastructure
and urban development (IU) industry, but it also includes all other parts of the
built environment value chain, from provision of building materials to asset 3
The Transformation Power of Building Information Modeling, The Boston
operation and maintenance (O&M) as well as real estate and urban services. Consulting Group, 2016

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 5

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 5 15.02.18 16:19


Through these functions, BIM can reduce the design phase
of a construction project by 30% and its design cost by 8%,
according to a University of Maryland study.4 According to
the same study, BIM can cut 10% from a project’s
construction phase and 3% from the construction cost. In
addition, BIM enables new services and can help determine
which new assets best complement existing built
environments.

Many industry players have yet to fully adopt BIM, despite


its advantages. Design and engineering firms lead the way,
followed by construction firms. Even though BIM could
significantly transform O&M, asset operators lag behind
other industry players, mainly because BIM is still
inaccurately perceived as being a purely 3D design
application, and because commercial BIM applications to
support O&M remain scarce. O&M applications account for
just 10 of 206 commercial applications listed in an industry
database of open-source BIM applications.5

Slow adoption rates means few organizations are using the


most sophisticated versions of the technology. In the UK,
for example, BIM is classified by level of maturity. In BIM
Levels 0 and 1, little or no collaboration exists between
parties working on a project; data is presented as 2D or 3D
CAD drawings and information is shared via email or on
paper. At BIM Level 2, stakeholders use 3D CAD, exchange
information in common file formats and share data
electronically through a centralized information
management system called a Common Data Environment
(CDE). At BIM Level 3, also known as BIM in the cloud, all
parties collaborate through digitally shared space.

BIM adoption varies greatly by country and level of


economic development.6 In more advanced economies,
most firms use BIM, though not on all projects and not at
the highest levels. A mandate to use BIM on government-
sponsored projects has made the UK frontrunner. Even so,
only 46% of the country’s IU companies describe
themselves as using BIM Level 2. In Germany, where BIM
use is not yet fully mandated, just 25% of IU companies use
BIM Level 2. In emerging and developing countries,
adoption rates are even lower.7

To improve productivity, the IU industry must accelerate


BIM adoption. Towards that end, governors of the World
Economic Forum’s Future of Construction Initiative have
prioritized BIM adoption as a critical step toward
transforming the industry.

This report summarizes the key insights and recommended


actions that were made at the October 2017 roundtable in
London. It highlights the recommended actions that
companies, industry organizations and governments are
advised to implement to accelerate BIM adoption and
better capitalize on what the technology can offer.

4
Estimating the Impact of BIM Utilization on Building Project Performance,
University of Maryland, 2012
5
BIM application list, buildingSMART, January 2018
6
Scotland Global BIM Study, Scottish Futures Trust and dotBuilt
Environment, July 2016
7
BIM Survey 2015 Results, Conject, 2015

6 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 6 15.02.18 16:19


Key insights and recommended actions

Increasing BIM adoption requires greater collaboration and posed by proprietary software. It also requires helping
that stakeholders be motivated and given the right workers develop new skills, and changing behaviours to
capabilities (see Illustration 2). Industry stakeholders must support new processes. At the government level, it requires
understand how BIM benefits them, adds value rather than a long-term commitment and innovative financing to get the
cost, and is the necessary first step towards industry technology into the hands of stakeholders who need it.
digitalization. Adoption requires better teamwork through Specific steps are further delineated in 27 actions listed in
using integrated contracts, new forms of collaboration and the Appendix (see Table 1) and described in more detail in
open data-sharing standards to bypass the limitations the rest of the report.
Nine key insights for successful BIM adoption
Illustration 2: BIM Adoption Circle

1 Motivation Collaboration 2

Approach
BIM as the
essential Use
first step integrated
Think of
to IU contracts and
BIM as a value
digitali- redefine risk-return
creator, not
zation mechanisms
as a cost
factor
Articulate Set up early
BIM's benefits collaboration and
across the entire communication among
lifecycle stakeholders

Make a long- Establish


term commitment data sharing
and support standards
innovative and open
financing Change Establish systems
behaviours BIM skills
and processes, along the
not just full value
technology chain

3 Enablement
Accelerating BIM Adoption_Action Plan_Illustrations_20180115_1630.pptx

2.1 Set the right motivation for result, BIM is used mainly in design and engineering, less in
construction and even less so in O&M. That is unfortunate
BIM adoption because O&M stands to gain the most from adopting BIM
given that those functions span the longest period of a built
asset’s life and offer the greatest potential for cost savings
2.1.1 Articulate BIM’s benefits across the entire and additional revenue. For example, in the UK, capital
expenditures (CAPEX) for planning, design, engineering
lifecycle and building assets amount to £89 billion annually while
Although BIM can help stakeholders improve quality and operational expenditures (OPEX) for O&M run to £122
reduce costs throughout a built asset’s lifecycle, it is still billion.8
seen primarily as a 3D design application, and commercial
BIM applications to support O&M remain scarce. As a 8
Moving from BIM to a Digital Economy in infrastructure and city
programmes, Digital Built Britain, 2017

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 7

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 7 15.02.18 16:19


To reap BIM’s full potential, asset operators and service 2.1.3 Approach BIM as the essential first step to
providers should develop and pilot use cases that include IU digitalization
BIM 6D and 7D applications (Action 1). For example,
analysing 6D BIM information on energy use could reveal Autonomous equipment, wireless monitoring and other
ways to curb consumption. Similarly, O&M staff could use digital technologies need the platform that BIM provides for
7D BIM data to check the status of components and stakeholders to store, manage and share information. If the
schedule preventive maintenance. Architects and engineers IU industry is slow to adopt BIM, it could impede adoption
working on a new asset’s design should use BIM data to of other digital technologies. Companies must take a
optimize design regarding O&M costs (Action 2). comprehensive approach to digitalization starting with
implementing BIM as a platform to ensure successful and
If asset operators and service providers use BIM, it would sustainable adoption of related applications (Action 8).
create a technology pull that would force stakeholders in Research and development (R&D) to improve interfaces
earlier phases of an asset’s lifecycle to use it, just as BIM between BIM and other digital technologies would
models for O&M must be created when an asset is accelerate the adoption of both.
designed. As major owners and operators of built assets,
governments can play a leading role by using BIM in O&M BIM applications generally model a single asset. BIM is
for public assets, including using pilot projects to even more valuable when multiple assets are modelled
demonstrate its benefits (Action 3). together to form a comprehensive digitized built
environment. So-called “digital twins” of entire systems,
Stockholm’s New Karolinska Solna Hospital (NKS) is an such as transport or healthcare systems, could improve
example of a public-private partnership (PPP) using BIM in their planning, construction and operation. In particular,
O&M. The hospital’s BIM system supports predictive digitized built environments could help determine which
maintenance by offering instant access to relevant data new assets would best complement existing built
about objects such as elevators, including data on location, environments.
installation and use. Repair manuals and information
identifying spare parts and remedial procedures ensure that A fully digitized built environment could have an even
maintenance crews respond faster and more efficiently greater impact, namely optimizing all services based on the
when equipment fails. A 3D representation of the building built environment. In the UK, the cost of providing
makes cleaning and other daily operations more efficient. Advanced Urban Services (AUS) such as energy, waste and
water management or urban security and safety, equals
2.1.2 Think of BIM as a value creator, not as a cost approximately £597 billion annually.9
factor To realize the benefits of digitized built environments,
Initial BIM costs can be substantial because of the governments need to coordinate with the industry to
investment needed in software, technology infrastructure, develop BIM standards and specifications so models of
consultants and training. Organizations also incur project- single assets can be incorporated into comprehensive
specific costs for setting up BIM models and changing digitized infrastructure systems and cities (Action 9).
workflows and team processes. However, companies Governments must create central “digital twin” models of
seeking to estimate BIM’s financial benefits often find limited the built environment and use them for simulations to
information. This lack of detailed cost-benefit analysis may optimize strategic and financial planning (Action 10).
lead some to opt against making the investment.
9
Moving from BIM to a Digital Economy in infrastructure and city
To combat this problem, companies and industry programmes, Digital Built Britain, 2017
associations must create benchmarks against which BIM
costs and benefits can be measured (Action 4). Ideally,
these benchmarks would be published as anonymized data
other industry stakeholders could use. Companies should
also create pilot projects that allocate BIM costs and savings
separately from other financial data to create transparency
(Action 5). Companies can pool their experiences with pilot
projects to develop industry standards for calculating BIM
ROI (Action 6). Governments can publish pilot project-based
BIM ROI assessments to convince other stakeholders of the
technology’s benefits (Action 7).

Comprehensive ROI assessments should consider that


BIM’s value goes beyond reducing project costs. The
technology also reduces risk, enhances product quality and
accelerates delivery. Ultimately, BIM will be a strategic
imperative for the IU industry, similar to the way in which it
has become standard in the oil and gas industry, where
companies recognize using it is necessary to remain
competitive.

8 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 8 15.02.18 16:19


2.2 Enhance collaboration on power as the industry’s largest client to increase projects
that use DB, IPD, PPP and other integrated contracts
projects (Action 11).

Project owners typically take more than BIM into


2.2.1 Use integrated contracts and redefine consideration when choosing the best contract for a
risk-return mechanisms building project. However, increasing the number of
projects with integrated contracts would promote BIM
BIM costs and benefits are not equally distributed over a adoption.
project’s lifecycle. The bulk of the cost of creating BIM
models happens during design and engineering, while
most of the benefits occur in the downstream phases of the 2.2.2 Set up early collaboration and
value chain. As a result, stakeholders working on the early communication among stakeholders
phases of a project may lack the incentive to set up BIM To ensure BIM models cover a built asset’s lifecycle,
models. In addition, upstream players often have exclusive requirements for all phases must be identified when
access to project information to cover risks via claims. As models are created at the beginning of a project. This
such, they may lack motivation to participate in projects coordination requires collaboration and open
where BIM models make that information more transparent. communication between stakeholders. That is not always
easy given the construction industry’s highly disintegrated
To correct the situation, BIM costs and benefits must be value chain, in which players often focus exclusively on the
distributed more equitably. One option for doing that is scope of their own work without considering how it affects
using integrated contracts to line up stakeholders’ financial other stakeholders. In large projects, coordinating multiple
interests for all project activities and redefine risk-return stakeholders can be particularly challenging. Without
mechanisms. proper collaboration and communication, BIM models may
lack essential data and functions that stakeholders need to
The IU industry commonly uses design bid build (D/B/B) perform their work. For example, if a built asset is meant to
contracts, in which a project owner maintains separate have sensor-based smart-facility management, a sensor
contracts with individual stakeholders for design, integration plan should be mapped out and built into the
engineering and construction, with little coordination BIM model in the project’s design phase. Companies must
between stakeholders. As a result, projects with D/B/B revise their corporate cultures, organizational structures
contracts are likely to realize only incremental benefits from and processes to allow for more comprehensive and
adopting BIM. efficient collaboration (Action 12).

In integrated contracts, owners enter into a single Formal mechanisms would support stakeholder
agreement for design, engineering, construction and collaboration. An example of such a mechanism is the UK
possibly O&M services, making the success of each government’s Construction Industry Council (CIC) BIM
dependent on the others’ contributions. Integrated Protocol, a standardized supplementary legal agreement
contracts increase incentives for using BIM since the for common construction contracts.11 The protocol
technology benefits the entire project even if those benefits requires deliverables to be created for specific project
vary across different project phases. One type of integrated stages and outlines stakeholders’ BIM-related obligations,
contract is a design build (DB) contract. In it, a project liabilities and limitations. It also introduces two key project
owner either enters into a contract with with a single elements. The first is a model production and delivery
designer-builder or pursues a joint venture between a table, which shows who is responsible for preparing the
designer and a contractor to provide both services. Another data and details that BIM models must incorporate at each
type of integrated contract is the integrated project delivery project stage. The second element is a call for projects to
(IPD) contract. In it, a single contract covers an entire include an information manager to implement the BIM
project team, including the architect, general contractor, protocol, including keeping the model production and
engineers, fabricators, subcontractors and asset operators. delivery table updated. Additionally, the information
In public private partnerships (PPP), in the form of design manager oversees information exchange processes and
build finance maintain operate (DBFMO), the contracting procedures, creates and implements a project and asset
parties take over the separate tasks associated with the information plan, and prepares data drops and other
asset for a set number of years. This provides the project output.
contracting parties with a vested interest in setting up a BIM
model at the beginning to save costs and reduce risks By paving the way for better BIM collaboration, the CIC
throughout an asset’s lifecycle. BIM Protocol could serve as a blueprint for other countries.
As the document is purposely generic, it is expected that
For any type of integrated contract, stakeholders who bear further developments of formal mechanisms to support
the cost of setting up BIM models reap some of the benefits stakeholder collaboration include additional detail.
and consequently have more incentives to adopt it. At the Governments should tailor BIM collaboration procedures
same time, including BIM allows downstream players to to their own legal environments and use pilot projects to
develop new competences.10 Governments should use their demonstrate related benefits (Action 13). Ideally,
procedures should be harmonized across jurisdictions.
10
Alignment of Partnering with Construction IT, Delft University of 11
CIC BIM Protocol, UK Construction Industry Council (.pdf download)
Technology, 2016
An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 9

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 9 15.02.18 16:19


Even without protocols or other formal structures, To improve data sharing, IU companies should also support
stakeholders can still collaborate successfully, as emerging data marketplaces (Action 16). Data marketplaces
demonstrated by the project team behind The Edge office provide digitized building objects, which designers and
building in Amsterdam. Early stakeholder engagement is engineers can reuse to improve productivity. Such
one reason The Edge was hailed as the most connected marketplaces also offer sensor-generated data from
and sustainable smart building in the world when it opened existing assets, which can be used to optimize the design
in 2015.12 Among the building’s many innovations are of new assets. For data marketplaces to succeed, both
28,000 embedded sensors, which enable smart facility supply- and demand-side stakeholders must use them.
management. As a result, cleaners can see which areas are Marketplaces also represent an opportunity for IU
used the most and require cleaning or where to refill paper companies to bring in new revenue from trading data or
towel dispensers before they run out. The same system selling physical products and services connected to the
monitors LED lights to predict when bulbs should be data. The NBS National BIM Library is an example of such a
changed. The internet of things (IoT) integration was created data marketplace. Objects sold on it meet internationally-
early in the building’s design, and collaboration between recognized BIM standards requirements. Manufacturers
designers, engineers, suppliers and other stakeholders led promote and deliver products on it directly into digital
to its success. “We integrated the solutions on the silicon processes, enabling planners to choose their products.
level instead of just gluing technologies together,” said Erik
Ubels, Chief Technology Officer for building developer, To address concerns about potential IP losses that could
OVG. undermine BIM adoption, governments should develop
regulations to protect BIM IP and data ownership (Action
17). As an example, the UK’s CIC BIM Protocol clarifies IP
2.2.3 Establish data-sharing standards and open
use in BIM models. Within the guidelines of the protocol,
systems project stakeholders can use BIM model data under a
To work as intended, BIM applications need data on permitted purpose licence. Stakeholders may use BIM data
design, costs, schedules, sustainability and O&M. However, only in ways that are consistent with the applicable level of
inconsistent conventions for generating data as well as detail and purpose for which the model was prepared.
closed systems, lack of data exchange standards and Permitted purpose licences further stipulate that the
concerns about stakeholders’ intellectual property (IP) information provider retains all rights, and if the owner
create inefficiencies and make processes difficult to repeat seeks to acquire IP rights, the contract supplement must be
or link. Global conventions for generating and sharing data revised.
along with data marketplaces and clear IP regulations could
overcome these hurdles.
2.3 Enable all stakeholders
Differing conventions for data generation undermine the
consistency essential for proper BIM applications. For
example, methods used to calculate the area of floor space 2.3.1 Establish BIM skills along the full value chain
in identical buildings varies considerably between countries, A lack of employees with sufficient BIM skills both within the
and sometimes within countries, owing to different IU industry and among its clients is slowing BIM adoption.
measurement conventions. It is necessary that agreement BIM skills are core capabilities in a digitalized construction
is found in global conventions, mapping processes and industry, and as a result, they cannot be outsourced to third
approaches to generate the consistent data needed for BIM parties. Organizations have three options for increasing
models. One such global data generation convention is the their BIM talent pool: hiring new talent with the required
International Property Measurement Standard (IPMS).13 skills, upskilling the existing workforce, and simplifying BIM
Alongside this, IU companies should support work from technology and processes to reduce required skills.
institutions like the Royal Institution of Chartered Surveyors
(RICS) to develop global conventions for data generation Education must be reformed to provide prospective
and apply them accordingly (Action 14). employees with necessary BIM skills as well as the
interdisciplinary skills required for BIM collaboration.
Examples outside the IU industry show that data-sharing Courses should teach students tangible, applicable BIM
standards are an effective way to increase efficiency and knowledge through practical, hands-on training.
interoperability when they are developed from the bottom Universities, vocational and professional training providers
up. One example is the World Wide Web Consortium should integrate BIM into general design and engineering
(W3C), a group of 430 organizations that develops web classes rather than offer courses as electives or add-ons
standards. IU companies should support similar bottom-up (Action 18).
consortia to standardize BIM data exchange (Action 15).
One such consortium exists – buildingSMART, which Upskilling the existing workforce can be done on the job or
developed the Industry Foundation Class (IFC), the only in the classroom. In either case, IU companies and industry
open (non-proprietary) BIM data exchange standard – but associations should work with professional providers and
more needs to be done. academia to develop upskilling courses (Action 19).
Companies should institute a broad set of internal upskilling
programmes (Action 20). Some of those could include
12
train-the-trainer programmes, job rotations and (reverse)
The Smartest Building in the World, Bloomberg, September 2015
13
mentorships.
International Property Measurement Standards, RICS, January 2018

10 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 10 15.02.18 16:19


To mitigate the need for education and upskilling, BIM To make sure adoption is successful, companies might also
technology needs to become more user-friendly so it can assess whether certain internal processes need to be
be used by a range of workers who lack specialized skills adjusted before they implement BIM. For example,
or devices. BIM software developers could take advantage companies should streamline a supplier base that is too
of the pervasiveness of mobile devices, tablets and laptops large before establishing BIM-based data exchange
to create applications that workers without special skills processes. Companies adopting BIM should use the
could use. Software vendors should also develop BIM opportunity to streamline processes (Action 24).
software with easy-to-use interfaces (Action 21).
2.3.3 Make a long-term commitment and support
Additionally, project owners lack sufficient workers with
innovative financing
BIM skills. This could result in proposals that do not include
BIM, or if they do, requests for proposals (RFPs) that have As with other digital technologies, BIM relies on the network
poorly conceived or unrealistic requirements, again effect, i.e. its value increases as its user base grows.
undermining BIM adoption. As the IU industry’s largest Adoption, however, requires substantial investments. Two
client, government agencies could remedy this by factors increase the probability that a company will earn
incorporating BIM skills training in public engineering, back its investment: Assurances that demand for BIM will
procurement and O&M organizations (Action 22). last, and lowering the required upfront investment.

2.3.2 Change behaviours and processes, not just To assure companies of future demand, governments and
other large IU industry clients must make a long-term
technology commitment to include BIM in projects (Action 25).
Adopting BIM is often seen as exclusively a technology Commitments should be supported by clear plans that
investment, but that ignores crucial human and cultural include BIM targets, and requirements for public
aspects of the process. Consequently, technical procurement organizations. To ensure BIM adoption is
departments often direct BIM implementation without successful without overburdening companies, BIM
considering what behaviour and cultural changes might be requirements should be phased in over time. Germany was
needed. It also means executives often lack sufficient relatively late introducing BIM mandates, but the country’s
commitment, project managers and other key actors are Digital Roadmap for Design and Construction Initiative is an
not involved, and processes are not readily adapted. example of how public projects can include progressively
higher BIM requirements. Launched in 2015, the initiative
Adopting BIM without considering the human element will, requires all new German federal transportation
however, lead to widespread resistance. If individuals do infrastructure projects to apply BIM by 2020.14 The five-year
not to see how BIM adds value to their jobs or careers, they phase was stipulated specifically to make adopting BIM
could be reluctant to adopt new skills and instead maintain easier for the many small and medium-sized enterprises
their existing work habits. Risk-adverse corporate cultures (SMEs) in the country’s construction industry.
can exacerbate this resistance. This type of attitude can be
seen in project managers who use concerns about Innovative business models could also supporter greater
potential risks as an excuse to avoid implementing new BIM adoption. One potential business model is BIM-as-a-
technology. service, where users pay for the technology on a per-use
basis and upfront technology investments are smaller.
To deal with potential resistance, companies should adopt Software vendors should offer BIM-as-a-service, develop
BIM as part of a comprehensive change management low-budget versions of BIM with fewer features, and create
programme (Action 23). Such a programme should explain other innovative business models (Action 26).
BIM’s value to employees and the potential risks in not
using it. It should include training in required skills (as Innovative financing could also spur adoption. New
described in the section above). As part of a change financing models could allow private investors to fund
management programme, organizations should commit to companies’ BIM investments in exchange for sharing in
creating environments where mistakes and failures are future BIM benefits. Governments need to create a
tolerated while people establish new ways of working. regulatory framework for private investors to fund BIM
Furthermore, a comprehensive programme should lead to projects (Action 27).
revised organizational structures and cultures, key
performance indicators (KPIs) and incentives.
Organizations should use high-profile role models to
highlight BIM’s benefits and promote the programme, and
reward employees who adopt BIM-related practices.

In many organizations, information is perceived as


something to be hoarded instead of shared, but that
behaviour could further impede BIM adoption. A
comprehensive change management programme coupled
with knowledge management practices should encourage
employees to collaborate and share information within and
14
beyond their own walls. Road Map for Digital Design and Construction, Federal Ministry of
Transport and Digital Infrastructure Germany, 2015

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 11

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 11 15.02.18 16:19


Conclusion

The IU industry must adopt BIM to be more productive and


as an important first step toward the digitalization of the
industry, but it will only happen if all players in the value
chain act and collaborate. Actions that stakeholders can
take to promote BIM are summarized in the Action
Implementation Matrix (see Appendix, Table 1). Companies
can act individually, but should team up on industry-wide
efforts through existing associations, new initiatives and
other partnerships. As regulators and the IU industry’s
single largest clients, governments play a significant part in
promoting BIM. They can accelerate adoption by
mandating it in projects, bringing other stakeholders onto
pilot projects, promoting training, and establishing financial
and other incentives.

BIM will only succeed if stakeholders work together


towards a joint vision through a common plan. Doing so will
allow society to enjoy BIM’s many benefits, including more
affordable infrastructure and housing, safer and more
predictable project delivery, a more sustainable and resilient
built environment, and higher-quality service delivery for
end users.

12 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 12 15.02.18 16:19


Appendix

Table 1: Action Implementation Matrix

Industry
Companies Government
Groups

Articulate BIM’s benefits across the entire lifecycle


A1) Develop and pilot use cases that include BIM 6D and 7D applications X
A2) Leverage BIM data to optimize design regarding O&M costs X
A3) Use BIM in O&M for public assets and demonstrate benefits in pilot projects X

Think of BIM as a value creator, not as a cost factor


Motivation

A4) Develop benchmarks against which BIM costs and benefits can be measured X X
A5) Allocate BIM costs and savings separately from other financial data to increase transparency X
A6) Develop an industry standard for calculating BIM ROI X X
A7) Publish BIM ROI assessments of pilot projects X

Approach BIM as the essential first step to IU digitalization


A8) Implement BIM as platform to store, manage and share data required by new technologies X
A9) Develop BIM standards and specifications for digitized built environments X
A10) Build up digitized built environments and use them for financial planning X

Use integrated contracts and redefine risk-return mechanisms


A11) Increase the share of projects that use integrated contracts X

Set up early collaboration and communication among stakeholders


Collaboration

A12) Revise corporate cultures, structures and processes for more comprehensive collaborations X
A13) Develop BIM collaboration procedures (e.g. CIC BIM Protocol) X

Establish data-sharing standards and open systems


A14) Support developing global conventions for data generation X X
A15) Support bottom-up consortia to standardize BIM data exchange X X
A16) Support emerging data marketplaces X
A17) Develop regulations to protect BIM IP and data ownership X

Establish BIM skills along the full value chain


A18) Integrate BIM into general design and engineering classes X
A19) Create upskilling courses with professional education providers X X
A20) Institute a broad set of upskilling programmes (e.g. job rotation, mentorships etc.) X
A21) Develop simple BIM software that emphasizes usability X
Enablement

A22) Incorporate BIM skills training in public engineering, procurement and O&M organizations X

Change behaviours and processes, not just technology


A23) Adopt BIM as part of a comprehensive change management programme X
A24) Streamline processes before adopting BIM X

Make a long-term commitment and support innovative financing


A25) Make a long-term commitment to include BIM in projects X
A26) Create innovative BIM business and financing models (e.g. BIM-as-a-service, low budget
X
BIM)
A27) Create a regulatory framework for private-investor BIM funding X

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 13

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 13 15.02.18 16:19


Roundtable participants

A total of 35 individuals from 22 organizations participated Royal Institution of Chartered Surveyors


in the roundtable “Accelerating BIM Adoption” held in Salini-Impregilo
London on 17 October 2017. SNC-Lavalin
University College London
Organizers
Arup
Atkins
The Boston Consulting Group
The World Economic Forum
United Kingdom Government

Participants
ACCIONA
AECOM
Arcadis
Arendal
Consolidated Contractors Company
Cirrus
Digital Built Britain
DIRTT Environmental Solutions
Imperial College London
Office for Nuclear Regulation
OVG Real Estate
PLP Architecture
Professional Construction Strategies Group

14 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 14 15.02.18 16:19


Contributors to the Future of
Construction Initiative

Project Team Arcelor Mittal


Lakshmi N. Mittal, Chairman and Chief Executive Officer,
ArcelorMittal, United Kingdom
World Economic Forum
Patrick Le Pense, Manager of Flat products; Business
Till Zupancic, Project Manager, Future of Construction Development Construction – Infrastructure, Arcelor Mittal,
Michael Bühler, Head, Infrastructure and Urban Luxembourg
Development Industries
Isidora Kosta, Community Lead, Infrastructure and Urban Arup
Development Industries
Gregory Hodkinson, Chairman, Arup Group, United
Hani Dakhil, Community Lead, Infrastructure and Urban
Kingdom
Development Industries
Tim Chapman, Leader - Infrastructure London Group, Arup
Group, United Kingdom
The Boston Consulting Group (Adviser and Knowledge
Partner)
BASF
Santiago Castagnino, Partner and Managing Director; Head
Kurt Bock, Chairman of the Board of Executive Directors,
of Engineered Products and Infrastructure, Western Europe
BASF, Germany
and South America
Ulrich Baum, General Manager LUWOGE consult GmbH,
Christoph Rothballer, Principal, Global Infrastructure Expert
Germany

Consolidated Contractors Company (CCC)


Steering Committee, Future of Construction Samer S. Khoury, President, Engineering and Construction,
Initiative Consolidated Contractors Company (CCC), Greece
Amr El-Sersy, Manager Learning & Innovation,
Abertis Consolidated Contractors Company (CCC), Greece
Francisco Reynés, Chief Executive Officer, Abertis
Infraestructuras, Spain Construction Products Holding Company (CPC)
Marc Ribo Pedragosa, Senior Economist, Abertis Mu'taz Sawwaf, Vice-Chairman of the Board and Chair of
Infraestructuras, Spain the Executive Committee, Construction Products Holding
Company (CPC), Saudi Arabia
Acciona Raja Nahas, Assistant, Construction Products Holding
Luis Castilla, Chief Executive Officer, Acciona Company (CPC), Saudi Arabia
Infraestructuras, Spain
Pierre Patrick Buffet, Strategy Officer, Acciona, Spain Danfoss
Kim Fausing, President and Chief Executive Officer,
AECOM Danfoss, Denmark
Michael S. Burke, Chairman and Chief Executive Officer, Nis Jessen, Vice-President Strategy and Business
AECOM, USA Development, Danfoss, Denmark
Matt Forbes, Chief Operating Officer, Operational
Excellence, AECOM, USA The Durst Organization
Douglas Durst, Chairman, Durst Organization, USA
Aecon
John M. Beck, President and Chief Executive Officer, Fluor
Aecon Group, Canada David T. Seaton, Chairman and Chief Executive Officer,
Mathew Kattapuram, Senior Vice President, Strategic Fluor Corporation, USA
Business Development, Aecon Group, Canada Mark Brown, Vice President - Construction & Fabrication,
Fluor Corporation, USA
Arcadis
Peter Oosterveer, Chief Executive Officer, Arcadis, HCC
Netherlands Ajit Gulabchand, Chairman and Managing Director, HCC,
Bianca Nijhof, Global Sustainability Program Manager, India
Arcadis, Netherlands Arjun Dhawan, Group Chief Executive Officer, HCC, India

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 15

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 15 15.02.18 16:19


IC Holding Tarkett
Firat Çeçen, Chairman of the Board, IC Holding, Turkey Glen Morrison, Chief Executive Officer, Tarkett, France
Murat Sogancioglu, Chief Executive Officer Investment Gilles Lebret, VP Customer Operations and Group CIO,
Group, IC Holding, Turkey Tarkett, France

Kokusai Kogyo Co Advisory Committee, Future of Construction


Sandra Wu Wen-Hsiu, Chairperson and Chief Executive Initiative
Officer, Kokusai Kogyo, Japan

Link Real Estate Investment Trust Monica A. Altamirano, Specialist, Public-Private


George Kwok Lung Hongchoy, Executive Director and Partnerships and Climate Finance, Deltares, Netherlands
Chief Executive Officer, Link Real Estate Investment Trust, John Atkins, Director Buildings, Arcadis, Germany
Hong Kong SAR
Max HK Wong, Co-Head, Co-Head of Project and Camilo Andrés Benítez Ávila, Department of Construction
Development, Link Real Estate Investment Trust, Hong Management and Engineering, Twente University,
Kong SAR Netherlands
Ron Bakker, Founding Partner, PLP Architecture, United
OVG Real Estate Kingdom
Coen van Oostrom, Chief Executive Officer, OVG Real
Mark Bew, MBE, Chairman, PCSG Limited, United
Estate, Netherlands
Kingdom
Cees J. van der Spek, Director, Sustainability and
Marketing, OVG Real Estate, Netherlands Johnny Clemmons, Global Industry Director and Chief
Engineer, SAP, USA
Perot Group André Dorée, Head, Department of Construction
Henry Ross Perot Jr., Chairman of the Board, Perot Management and Engineering, Twente University,
Companies, USA
Todd Platt, Chief Executive Officer, Hillwood, USA Netherlands
Mahmoud Hesham El Burai, Chief Executive Officer, Dubai
RMZ Corp Real Estate Institute, Dubailand, United Arab Emirates
Manoj Menda, Corporate Chairman, RMZ Corp., India
Jayakumar K, Associate Director Projects, RMZ Corp., India Tarek A. El-Sheikh, Director, UN-Habitat, Kuwait
Thomas Ermacora, Founder, Architect and Curator,
Saudi Aramco LimeWharf, United Kingdom
Amin H. Nasser, President and Chief Executive Officer,
Danielle Grossenbacher, World President (2015-2016),
Saudi Aramco, Saudi Arabia
FIABCI International Real Estate Federation, USA
Fahad E. Al-Helal, Vice-President Project Management,
Saudi Aramco, Saudi Arabia Tiago Guerra, UK Chief Business Adviser, JFAN, Portugal
Abdirahman Abdi, Supervisor, Value Practices Unit, Project Carl T. Haas, Professor of Civil and Environmental
Optimization Division (PMOD), Saudi Arabia Engineering and Interim Chair, Canada Research Chair,
University of Waterloo, Canada
Siemens
Joe Kaeser, President and Chief Executive Officer, Lars Hesselgren, Senior Associate, PLP Architecture and
Siemens, Germany Visiting Professor, Chalmers University of Technology,
Roland Busch, Member of the Managing Board and Chief United Kingdom
Technology Officer, Siemens, Germany Arjan Hijdra, Senior Advisor, Network Performance, Ministry
Alexander Stuebler, Head of Executive Office of Dr. Roland of Infrastructure and Environment, Netherlands
Busch, Siemens, Germany
Sherena Hussain, Assistant Professor, Brookfield Centre in
Skanska Real Estate and Infrastructure, Schulich School of
Johan Karlström, President and Chief Executive Officer, Business, Canada
Skanska, Sweden Iván Jiménez, Visiting Researcher, Alexander von Humboldt
Roger Bayliss, Senior Vice-President, Operational German Chancellor Fellow, Germany
Efficiency, Skanska, Sweden
Richard Koss, Director of the Global Housing Watch,
International Monetary Fund (IMF), Washington DC, USA
SNC-Lavalin
Neil Alexander Bruce, President and Chief Executive Alex Lubbock, Head of Digital Construction, Infrastructure
Officer, SNC-Lavalin Group, Canada and Projects Authority, United Kingdom
Ian Leslie Edwards, President, Infrastructure, SNC-Lavalin Jeffry Matsu, Senior Economist, Royal Institution of
Group, Canada Chartered Surveyors (RICS), United Kingdom
David Mosey, Director of the Centre of Construction Law
and Dispute Resolution, King’s College London, United
Kingdom
16 An Action Plan to Accelerate Building Information Modeling (BIM) Adoption

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 16 15.02.18 16:19


Milagros Mostaza, Managing Director - EMEA, Project
Management Institute (PMI), USA
Ibrahim Odeh, Founding Director, Global Leaders in
Construction Management - Research Group, Department
of Civil Engineering and Engineering Mechanics, Columbia
University, USA
Alastair Parvin, Co-Founder, Wikihouse Foundation, United
Kingdom
Oshani Perera, Director, Public Procurement and
Infrastructure Finance, International Institute for Sustainable
Development (IISD), Switzerland
David Philp, EMIA BIM Director, AECOM, USA
Spiro Pollalis, Professor of Design, Technology and
Management, Harvard Design School, USA
Bob Prieto, Chairman and Chief Executive Officer, Strategic
Program Management, USA
Michael Ramage, Director, Centre for Natural Material
Innovation, University of Cambridge, United Kingdom
Craig Ross, Partner, Head of Project and Building
Consultancy, Cavendish Maxwell, United Arab Emirates
Claudia Schachenmann, Director, Bureaux Schachenmann,
Switzerland
Sam Spata, Owner, Principal, Method Lean, USA
Marc Tkach, Director, Infrastructure, Millennium
ChallengeCorporation (MCC), USA
Jennifer Whyte, Laing O'Rourke/Royal Academy of
Engineering Professor of Systems Integration, Imperial
College London, United Kingdom

An Action Plan to Accelerate Building Information Modeling (BIM) Adoption 17

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 17 15.02.18 16:19


41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 18 15.02.18 16:19
41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 19 15.02.18 16:19
The World Economic Forum,
committed to improving
the state of the world, is the
International Organization for
Public-Private Cooperation.

The Forum engages the


foremost political, business
and other leaders of society
to shape global, regional
and industry agendas.

World Economic Forum


91–93 route de la Capite
CH-1223 Cologny/Geneva
Switzerland
Tel.: +41 (0) 22 869 1212
Fax: +41 (0) 22 786 2744
contact@weforum.org
www.weforum.org

41654_V2_Accelerating_BIM_Adoption_Action_Plan.indd 20 15.02.18 16:19

You might also like