Professional Documents
Culture Documents
Alim PDF
Alim PDF
100%
$593
$600
90%
80%
$500
70%
$400 60%
$ Millions GAAP Revenue
50%
$300
40%
$200 30%
Since 2006,
20%
more than $1 billion invested $100
in R&D and Acquisitions 10%
$0 0%
2009 2010 2011 2012 2013 Estimated
4 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
5 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
6 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Bentley managed suite of applications
Clash Animation/
Conceptual
Resolution Simulation
Functional
Plant External
Physical Bentley Planning
Physical Information
Navigator Tool
Model
Analysis
Construction
Plant Lifecycle
7 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
OpenPlant solution „Open”?
• OpenPlant Power PID
– Data Manager • Open data structure
– Bentley DataSheets (ISO 15926)
– Bentley Instrumentation and Wiring
• Open for many file
– Bentley Hookups formats
– Promis*e
• Open for legacy
• OpenPlant Modeler specification formats
– OpenPlant Isometrics Manager
– OpenPlant Model Server
– Raceways and Cable Management
• Bentley Navigator
– Clash Management
– Schedule Simulation
8 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
OpenPlant solution
• Equipment
• Piping
• Piping Supports
• Cable Trays
• HVAC
ProConcrete
ProSteel
Data Data
Integration Integration
Bi-Directional Bi-Directional
Exchange Exchange
Data Export
Data Bi-Directional
Export Data Export
Exchange
Data Data
Export Export*
Tanks and
Boilers
Heat
Exchangers
Codes
Fabrication
Drawings
Data Data
Integration Integration
Bi-Directional Bi-Directional
Exchange Exchange
Data Data
Export Export*
Project review
• Dynamic feedback
– all disciplines, many
applications
– components information
• Markups management
– Support for 3D
– Audit trail
• Export to PDF
• Animations
• Visualizations
• Mobile applications
Summary:
Asset Performance
Maximizing Current Information &
Solutions
‘Hands-on’ approach during
Handover into Operations
Collaboration
Data Exchange & Access
Data Quality/ Availability
Mobility
Connecting the mobile workforce
SaaS/ Cloud/ Security
IT systems/ data/ asset
documentation
100
90
Employee Effectiveness (%)
80
70
60
50 When Information Quality drops
40 8% - Productivity Drops 50%
30
20
10
0
75 80 85 90 95 100
Average Integrity Level (%)
Source: ICM - Based on 8 data sets used in series and each data set at an integrity level varying from 75% to 100%
“… BP told us the modifications on the BOP were extensive. After the accident, they asked
Transocean for drawings of the blowout preventer. Because of the modifications, the
drawings they received didn't match the structure on the ocean floor.. …”
Source: House Committee on Energy and Commerce hearings on the Deepwater Horizon disaster
28 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
is an information modeling platform for delivering
lifecycle information management to operators of infrastructure
assets…
&
a suite of applications and on-line services to improve
management and operational performance, safety and
compliance of infrastructure assets.
Front-End Engineering
& Design (FEED) Cost Estimation,
Review & Approval
Conceptual Design
Procurement,
Site Preparation
& Construction
Decommissioning
Offshore – remote fabrication,
transportation & installation
Modification Commissioning
& Turnaround Operations
& Maintenance & Handover
A Project Information
Management Hub Built On:
Conceptual Design
Interoperability
Cost Estimation
• Accepts
& Approvalengineering information
Front-End Engineering
& Design from any source
• Transfers engineering
Front-End Conceptual information to any data user Engineering
Detailed
Requirements CAPITAL & Design
PROJECT/
• Maintains engineering
intelligence & data integrity
ENGINEERING
INFORMATION
SYSTEM
Standards
• Built on industry standards
• ISO 15926 for plant information
Usability
Procurement,
• A practical system that can be used
Site Preparation
by all engineering disciplines
& Construction
Decommissioning
Modification Commissioning
& Turnaround Operations
& Maintenance & Handover
• Develop design options • Undertake design reviews • Manage/ maintain & optimize assets
• Perform analysis and • Identify material requirements • Maintain accurate documentation
simulations • Optimize fabrication/construction • Integrate asset data with other
• Create project & construction sequencing into handover enterprise systems
deliverables • Offshore – remote fabrication,
32 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
transportation & installation
Solution Arcitecture Concepts
Trusted Information
• eB (enterprise Bridge) provides the means to
ensure trusted information is available
where, when and to who it is required.
• eB solutions are about…
– Identification and Classification
• What is it?
– Relationships/Links/Context
• What is it for?
– Responsibility
• Who owns/uses/needs it?
– Control of Change
• Who can change what? Where are all copies?
• What is the impact, cost and scope of change?
• What/who/when changed?
34 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Information Modeling
• Classification
• Relationships Documents
Organizations
• Information Reach
Requirements
People
• Behavioral Control
• Presentation Drawing
Change
Distribution People
Requirements Requirements
Order
Projects
Location
Drawing
Requirements
ERP
CAD Web
Solutions for
Information Maintenance
Email SharePoint
Management
Product Data
Office
Rapid access to accurate
information in context
CAD ERP
Web CRM
I tem
Document Management
Management
Email HR
Closed Loop Change
Process
Office Marketing
Records Management
Applications
and Online Packaged
Services Interfaces
Director
Firewall
HTTP(S) HTTP(S)
Storage
Services
Index
Remoting
ADO NET
.NET
Repository
Metadata
Enterprise Users
ERP Office ECM Legacy Users Collaboration
Visibility
Information Quality
Compliance
Governance
Change Control
Sangachal
Terminal
ACG
Oil Production &
BTC Development
Pipeline
Shah Deniz
ACG
Production Sangachal Terminal
(Central Azeri Platform)
Platform
Background
• Capital projects historically suffered from:
– Inconsistencies in the level of data provided during
handover from EPC’s/ Suppliers
– Lack of data standardization across projects to support
operations
– Lack of standardization and associated workflows
“ Improving plant data supporting change management
understanding and
maximising information Data Repository & Portal Use Case
completeness, correctness • Implement a Data Repository based on ProjectWise
and consistency (3C’s) in a Lifecycle Server to centralize all project data and
single consistent portal deliverables
environment.”
• Provide a Portal into the Data Repository supporting
easy data access in operations
• Formalize management
of change/revision control workflows
44 | WWW.BENTLEY.COM | © 2013 Bentley Systems, Incorporated
Business Value/ Benefits
• Streamlined Handover
– Maximising information completeness, correctness & consistency (3C’s)
– Improved data integrity/ quality
• Management of Change
– Tracking the as-maintained asset while ensuring maximum information integrity
- Improved control & visibility to engineering changes
Background
• Capital projects historically suffered from:
– Inconsistent Data formats during data handover from
EPC’s/ Vendors into operations
– A lack of project collaboration across project Stakeholders
– Too many documents, not enough data!
• Streamlined Handover
– Maximising information quality during handover
– Improved data integrity/ quality
– Close integration with O&M systems
– Lower cost of ownership to build/ manage/ maintain as-built data
• Management of Change
– Tracking the as-designed asset during the EPC phase
– Improved control & visibility to engineering changes
“ProjectWise Lifecycle Server not only provided quick access to data and project work
instructions, it also automatically tagged document links in an easy-to-use system
that operations staff are motivated to use and maintain.”