2.0 OBJECTIVE:
The purpose of this document is to detail the basic guidelines to the vendor for the purpose of
fabricating the Purified Water Distribution System as per the defined specifications. It is the
foremost and the basic requirement of the process and system as envisaged by the project team and
management.
3.0 SCOPE:
Scope of URS cover finalization of equipment and its major components design specifications and
also comprising of the following main equipments:
3.1 AHU units
3.2 Process motor
3.3 Reactivate motor
3.4 Supply air Terminal HEPA Filter
3.5 Return air Riser
3.6 Gear motor
3.7 Instrumentation and Controls
3.8 Electrical
3.9 Ducting, Terminal HEPA, R.A Riser, Damper
3.10 Insulation
3.11 Condensing unit for cooling
3.12 Heater for RH maintain
3.13 The responsibility and authority to ensure that this policy is observed and acted upon is vested in
UNICURE INDIA LTD (Unit-III), Plot No.112-113, Ecotech No.1 Greater Noida, U.P Project team.
They will ensure that procedures are written to address the issues raised below.
Note: Scope of URS cover finalization of equipment and its major components and design
specifications and also comprising after finalization the URS
4.7 The AHU system should be able to control the following parameter:
4.7.1 Temperature (°C).
4.7.2 Relative Humidity (%).
4.7.3 No. of ACPH (Air Changes per Hour) in Cubicle.
4.7.4 Particulate count (Non-viable and Viable) of the area.
4.7.5 Fresh Air Qty. / Supply and Return Air Qty.
6.2.4 All bought out items / Motors /Sub Module should be of reputed make meeting International
Standards.
6.2.5 All system accessories offered should be guaranteed for workmanship and quality of materials for a
minimum period of one year from the date of commissioning.
7.0 SALIENT FEATURES:
5.0.1 Humidity Sensor with controller for control the RH.
5.0.2 Temperature indicator – digital or analogue display.
5.0.3 Magnahelic gauges for measuring differential pressure.
5.0.4 Efficiency of HEPA Filter should be 99.97 %. Acceptance criteria for filter leakage should be 0.01
%.
5.0.5 All the critical test parameters should be as per ISO 8 criteria.
Note: ISO Class can be varying based on the classified and un-classified areas and the places.
8.0 SAFTY FEATURES:
AHU should have the following features:
i) Fire Dampers with actuators in SA. Fire Dampers shall be interlocked with AHU motor to switch
off the respective AHU in case of fire.
ii) The limit switch shall be provided in AHU door which shall be interlocked with AHU motor. As
soon as door is opened AHU motor- blower shall turn “OFF”.
iii) Wire guard shall be provided at AHU fan section for protecting the operator from any injury.
Note: The detailed layout will be displayed on the drawings, which gives clear idea about the
duct running in the Ecotech facility is required.
10.0 TOTAL CFM OF AHU SUPPLY IN ROOMS ( From the Plant layout no has to be taken)
AHU TOTAL
SR. NO. ROOM NAME TEMP. R.H. ∆P
CFM
01 L-005 23±2 NMT 55%
2158
02 L-010 23±2 NMT 55%
11.0 DEVIATION:
Any Deviation or Modification to the User requirement specification shall be highlighted.
12.0 DELIVERY:
a. As per purchase order.
b. To be delivered at company address.