Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Fishbones Stimulation Technology

Connect your reservoir with simplicity, accuracy and efficiency

Technology
• Fishbones subs are run in the open hole with the liner
• The subs are positioned across the formations where stimulation is desirable
• Needles are jetted or drilled into the formation depending on type of formation
• Each sub assembly contains up to four small diameter tubes with length up to 40 feet
• Result is a fishbone style well completion with multiple laterals extending from the mainbore

Benefits
• Connect to natural fractures
• Accurate placement of laterals
• Penetrate permeability barriers
• Increase productivity / injectivity
• Bypass damaged zone around wellbore
• Connect reservoir with numerous laterals
• Reduce rig time and cost. Eliminate vessel
• Eliminate risk for stimulating into unwanted zones
• Connect to sweet spots not penetrated by the mainbore

www.fishbones.as

You might also like