1. General Existing Site Sharing information
Candidate Address:
Installation of aerial cable Additional poles required to reach the 3 phase supply:
allowed: Yes No Quantity – pcs
Ground condition where cables will
pass:
Power cable required to be
Length of required underground Concrete m
installed underground:
installation … m Soil m
Yes No
Others:
Connect to PLN:
specify ……. length ….. m
Distance from the
nearest transformer: Capacity of the PLN Transformer: - KVA No. of poles required: - pcs.
…….. m
Any private property which will be affected by pole location and Right of way for the PLN connection:
Yes No (Please show in the drawing.)
Type of supply available: Spare breakers available for use:
Length of power cable from the source
single phase (capacity and qty)
Connect to to our proposed sub-meter: ………..m
three phase …………………………………………..
Building:
Length of cable from sub meter to ACPDB Demolition necessary: Yes No
………………..m Specify type and length : …………………………………..
3. Grounding System
Possibility to connect with existing grounding (please discuss with owner): Yes No
Estimated length of exposed (yellow green) grounding cable required: …………….m
Demolition required for the installation of the copper rods:
Yes (specify type and qty) …………………………………………………. No
a. Radio Requirement
Technology DCS GSM
Antenna Type Number or Size
*) see note 1
Number of Antennas 3 3
Antenna Pipe Mount
(Diameter & Length)
Antenna Orientation (deg.) & Tower Leg
30&1,90&2, 30&1,90&2,
Mounting Position
210&3 210&3
(Leg 1,2,3,4)
Feeder Length (meters):
Feeder size/type
(i.e. 7/8; 1 ¼; etc):
Antenna Height (meters)
( Centre of ant. to ground level) 40 42
b. Transmission Requirement
Proposed Microwave Antenna Information
Leg 4 Leg 3
Revision number: 02 25 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number: 163357/Mega/Batch 3G/
PO OP
Team (Principle Date Signature
(Other Party)
Owner)
Construction Supervisor
Acquisition Supervisor
TR/MW Planner
Radio Planner
Implementation Supervisor
Others attending
a. Access to site including the dimensions and distance of the road which is not accessible by car:
b. Complete proposed layout (tower/pole position/equipment/ACPDB/cable route,etc. with all dimensions
including set back from property line on all sides)
c. Reflect any overhead/underground utilities crossing the site (powerline, telephone line, pipes…etc.)
d. Reflect existing facilities/obstructions/trees….etc.
e. Reflect any high tension Cables running outside the building which can affect delivery (approx. height)
f. Sketch the proposed route for power connection; specify the distances as stated in above data
g. SITE CONTOUR / ELEVATION (reflect approximate contour of site/elevation view; provide the elevation
reading per 3m)
Site Layout
0° 30°
Pintu
SST
Kwh 44M
Propose
Hcpt
Kwh
Bts Bts
Genset
Antenna Placement
42 M.A.G.L
40 M.A.G.L
EXISTING ANT
EXISTING ANT RF
RF SECTOR 3 210°
SECTOR 2 90°
B C
A D
EXISTING ANT
RF 40 M.A.G.L
SECTOR 1 30°
EXISTING ANT
RF
EXISTING SECTOR 3 90°
MW ANTENNA
Ø0.6 90° B C
A D
EXISTING ANT
EXISTING ANT RF
RF SECTOR 4 210°
SECTOR 1 30°
A D A D
EXISTING
EXISTING ANT MW ANTENNA
RF Ø0.6 78°
SECTOR 1 60°
Panoramic Photo
0º 30 º
60 º 90º
120º 150º
Revision number: 02 29 Document title: Site Sharing TSSR
Date of issue: December 06, 2012 of Document number: 163357/Mega/Batch 3G/
180 º 210 º
240º 270º
300 º 330 º
5.A. Detailed Sketch of Transmission Cables and Transmission Cable Ladder System
a. Provide details of the type, size and number of existing transmission cables including relative positions and
arrangement on the cable ladder system.
b. A new sketch for (a) above is required whenever there is a change in the number of cables and the sketch
should indicate the top and bottom tower elevations where the cable arrangement is applicable.
c. Provide details of the cable ladder system including width, type and size of ladder rails, type size and spacing
of cable support brackets.
d. If the transmission cable ladder system is integral with the climbing ladder system then this sketch must
include details of the climbing ladder system including the following :
- Width, type and size of climbing ladder rails.
- Diameter, type and spacing of ladder rungs.
- Safety cage vertical flat bar size and arrangement.
- Safety cage horizontal flat bar size and spacing.
e. Provide measurement of vacant space available on the cable ladder system.
f. If the transmission cable ladder system is isolated from the climbing ladder system then show the position on
the tower.
a. Radio Requirement
Technology 2G 3G
Sector 1 2 3 1 2 3
DX-1710- DX-1710-2170- DX-1710-2170- DX-1710-2170- DX-1710- DX-1710-
Antenna Type Number 2170-65- 65-19.5i-M 65-19.5i-M 65-19.5i-M 2170-65- 2170-65-
19.5i-M 19.5i-M 19.5i-M
Number of Antennas 1 1 1 1 1 1
Antenna Orientation (deg.) &
Tower Leg Mounting Position 60/Leg 1 180/Leg 2 240/Leg 3 60/Leg 1 180/Leg 2 240/Leg 3
(Leg 1,2,3,4)
Feeder Length (meters): 30 x 2 30 x 2 30 x 2 30 x 2 30 x 2 30 x 2
Feeder size/type
7/8" 7/8" 7/8" 7/8" 7/8" 7/8"
(i.e. 7/8; 1 ¼; etc):
Antenna Height (meters)
30 m 30 m 30 m 30 m 30 m 30 m
( Center of ant. to ground level)
Other information: Antenna Height is always taken from center of antenna
b. Transmission Requirement
Proposed Microwave Antenna Information
Tower
Leg Azimut Type of Feeder
Near Heigh Heigh Azimuth
Mounting Diameter h Antenna Cable Far End Diameter
No End t t to N.E.
Position (m) to F.E. (HP, Std, (Type & Site (m)
Site (M.Agl)
Grid, etc) Diameter)
(M.Agl) (Deg)
(Leg (Deg)
1,2,3,4)
1 163357 1 0.6 31 7.81° HP 1/4 161059 0.6 30 187.81°
2
3
4
5
6
Other information : Antenna Height is always taken from center of antenna
Note:
HP = High Performance Microwave Antenna.
STD = Standard Parabolic Antenna without Radome. Leg 1 Leg 2
STD+R = Standard Parabolic Antenna with Radome.
Existing 4 Leg
Grid = Grid Antenna. Hight 44 mAGL
Leg 3
Leg 4