Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

' ' 25 50

13 34
25 13 34 15
13
63
13 95
ACCU
W.3
1000
68 14 GOING
ACCU
PAD
W.1
1000
14 LOCATION 7 3
TO
BUILDING
B
00
W.4

12
0 W.3

12 40
600
00
12

42
1000
4 W.2
W.2 600
600
46 W.4 W.3
50
15 5 600 1000 46
5
15
5 27 00 0
27 00 9
1 40
11
9
1 40 W.1
11
W.1
1000 1000 W.4
600
32 16
W.3
1000 32
0 0
16
00
W.3
1000
W.2 00
00
10 40 D.5

10 40
600 I.T. W.4
900
600 WORKING LOCKER
ROOM HALLWAY
AREA
126
W.1 SEATS
1000
50

I
0 W.3
85 9 38

I
9 3 D.3
1000
UP
W.4
600
W.2 800

50
600 W.4

50

58
UP W.2 600 D.2

58
D.2 600 1000
DN
1000
WORKING W.3
AREA 1000

E
W.1
1000
D.2
1000
E GOING

15LEA
W.3 TO

00

C
00 R

J
1000 BUILDING

15

J
C

GOING

K
W.2 LOBBY W.4 TO

K
600 W.1 BUILDING
1000 600 B

FEMALE D.2

50
1000

50
D.2

58
1000 D.1

58
2000 GOING W.3 W.3

F
W.2
600
F TO
BUILDING
A
1000 1000
MALE
MALE MALE 39 RESTROOM
39 MALE GOING W.4 W.4 3 7 W.4
G
37 ROOM
LAVATORY
TO
BUILDING G 600 600 600 PANTRY
B
W.5

L
W.1

L
1000 5700
0 W.3 9 70 SLOP
8 97 SLOP W.3
1000
1000 8 FEMALE SINK
SINK RESTROOM
FEMALE
ROOM
W.2 W.4
600 600
DN

TRAINING
ROOM H
LOCKER
H
BUILDING B BUILDING B
01 GROUND FLOOR PLAN 02 SECOND FLOOR PLAN
AR-01 SCALE A4 1:200M AR-01 SCALE A4 1:200M
- - - -

FOR CONSTRUCTION DATE:__________


1000 600
3100 5700
500 2100 500 1080 1080 1080 1080 1080 1000 600

1550

1050
1075

1075

1500 900
1000 1000 300 900 300

500

500
4000

4000
3500

3500

3500

3500
2425

2425
2400

2400

1850

1850
FFL

D.1 D.2 D.3 W.5 W.1 W.2 W.3 W.4


3100 1500 900 5700 1000 600 1000 600
SETS 1 SET 5 SETS 1 SET 1 SET SETS 8 SETS 9 SETS 12 SETS 11 SETS
FRAMELESS GLASS DOOR W/ SEAMLESS FRAMELESS GLASS DOOR FRAMELESS GLASS SEAMLESS FIXED GLASS SEAMLESS FIXED GLASS SEAMLESS FIXED GLASS SEAMLESS FIXED GLASS
TYPE FIXED GLASS WINDOW (TEMPERED) W/ FIXED GLASS (TEMPERED) DOOR (TEMPERED)
SEAMLESS FIXED GLASS (TEMPERED) TYPE WINDOW (TEMPERED) WINDOW W/ AWNING (TEMPERED) WINDOW (TEMPERED) WINDOW W/ AWNING
LOCATION GROUND FLOOR OFFICE AREA GROUND & SECOND FLOOR OFFICE AREA GROUND FLOOR I.T. ROOM GROUND FLOOR OFFICE AREA LOCATION GROUND FLOOR OFFICE AREA GROUND FLOOR OFFICE AREA SECOND FLOOR OFFICE AREA SECOND FLOOR OFFICE AREA

BUILDING B
01 DOORS & WINDOWS SCHEDULE
AR-05 SCALE A1 1:50M
- A3 1:100M
PROJECT TITLE / LOCATION OWNER ARCHITECT ENGINEER SHEET CONTENTS NO. DATE REVISIONS REVIEWED BY SHEET NO.
These drawings shall be read in
conjunction with structural, BUILDING B - - FIRST ISSUE
electrical, mechanical, plumbing/
- -
- - - -

AVION LAND VON NAGASANGAN


PRC NO.: 36949 VALIDITY: 08-17-2019 PRC NO.: 69351 VALIDITY:
ENGR. NORMAN NAGASANGAN sanitary and fire protection
engineering drawings.
The Architect shall be notified of
-
-
-
-
-
-
-
-
- - AR 01
any discrepancy found and shall
JP RIZAL ST., BRGY. SAN LORENZO PTR NO.: 4698148 DATE: 05-25-2017 PTR NO.: 9565393 DATE: 01-10-2017 - - -
LAOAG CITY PLACE.:QUEZON CITY TIN: 314211546 PLACE.: LAOAG CITY TIN:
be resolved prior to construction
- - -
- - -
-

You might also like