VOLUME ERECTION  STRUCTURE PENANGKAL PETIR

PROYEK : PEMBANGUNAN 1 UNIT TANGKI TIMBUN KAP. 40.000 KL
LOKASI : TBBM LOMANIS ‐ CILACAP

Ukuran Area Berat Satuan Total Berat


No. Uraian Pekerjaan Material Quantity
Panjang  Lebar Tebal Diameter (m²) (Kg) (Kg)

1 Structure Penangkal Petir 40 m height
Base Plate 20 mm 800 mm                0,43 1 Pcs                 67,82 67,82
Stiffener Plate 12 mm                0,03 8 Pcs                    2,36 18,84
Tiang dia. 8" Pipa 8" sch.40               6.000 mm 8 mm 219 mm                       ‐ 3 Btg               255,30 765,90
Tiang dia. 6" Pipa 6" sch.40               6.000 mm 7 mm 168 mm                       ‐ 2 Btg               169,56 339,12
Tiang dia. 4" Pipa 4" sch.40               6.000 mm 6 mm 114 mm                       ‐ 1 Btg                 96,42 96,42
Tiang dia. 2 1/2" Pipa 2 1/2" sch.40               4.000 mm 4 mm 73 mm                       ‐ 1 Btg                 34,52 34,52
Reducer 8"x6" Red. 8"x6" sch.40 8 mm                       ‐ 1 Pcs                    5,70 5,70
Reducer 6"x4" Red. 6"x4" sch.40 7 mm                       ‐ 1 Pcs                    3,60 3,60
Reducer 4"x2 1/2" Red. 4"x2.5" sch.40 6 mm                       ‐ 1 Pcs                    1,45 1,45
Flange dia. 6" FL. Ansi 150 SO                       ‐ 2 Pcs                    7,50 15,00
Flange dia. 4" FL. Ansi 150 SO                       ‐ 2 Pcs                    5,30 10,60
Ladder RB. Dia. 22mm                   400 mm 22 mm 130 Pcs                    1,19 154,96
Kabel & LPS 1 set               250,00 250,00

TOTAL BERAT 1.763,93