EXAMPLE LANG TO LUISA MAY Total Lot Area (TLA) = 37,792.

16 sqm or
3.77 hectares

Maximum Allowable Percentage of Site


Occupancy (PSO) 50% of TLA
PSO = 50% OF TLA

= 37,792.16 X 0.5

PSO = 18,896.08 SQM


Maximum Allowable Impervious Surface Area (ISA) 20% of TLA

ISA = 20% OF TLA

= 37,792.16 X 0.2

ISA = 7,558.43 SQM

Maximum Allowable Construction Area (MACA) 70% of TLA MACA= PSO + ISA

= 18,896.08 + 7,558.43

MACA = 26,454.51 SQM

Minimum Unpaved Surface Area (USA) 30% of TLA

USA = 30% OF TLA

= 37,792.16 X 0.3

USA = 11,337.64 SQM

Total Open Space within Lot (TOSL) 50% of TLA

TOSL =ISA + USA

= 7,558.43 + 11,337.64

TOSL = 18,896.08 SQM


Allowable Maximum Building Footprint (AMBF)

AMBF = TLA - TOSL


AMBF = 37,792.16 – 18,896.08 AMBF =

18,896.08 sq.m

FLAR(Floor to Lot Area Ratio) = 2.50

Maximum Gross Floor Area (GFA) = TLA x FLAR

GFA = 37,792.16 X 2.50

GFA = 94,480 sq.m

Maximum Total Gross Floor Area (TGFA)

TGFA = BHL x 50% of TLA

TGFA =10 x 18,896.08

TGFA = 188,960.8 sq.m RROW

SETBACKS:

RROW Setbacks

• Building Height Limit


CHARACTER OF USE TYPE OF BUILDING/ BUILDING HEIGHT

OR OCCUPANCY STRUCTURE LIMIT

Institutional 15 meters ( or must

follow the duly-

approved BHL in

the major zone)

Building Height Limit