NACE

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Coating Inspector Program - Level 1

Date Location
April 27 - May 2, 2020 Mumbai, INDIA
May 4 - 9, 2020 Kochi, INDIA
June 22 - 27, 2020 Bengaluru, INDIA
June 29 - July 4, 2020 Mumbai, INDIA
August 31 - September 5, 2020 Mumbai, INDIA
September 7 - 12, 2020 KOLKATA
November 30 - December 5, 2020 Mumbai, INDIA

Coating Inspector Program - Level 2


Date Location
May 11 - 16, 2020 Kochi, INDIA
July 13 - 18, 2020 Mumbai, INDIA
December 7 - 12, 2020 Mumbai, INDIA

Coating Inspector Program - Level 3 Peer Review


Advanced Registration (Open) Mumbai, INDIA
For Registrations received by 3-Mar-2020 Mumbai, INDIA
Pricing & Details NACE Members Non Members
Advanced Registration (Open) INR. 1,70,000.00 INR. 1,85,000.00
For Registrations received by 13-Mar-2020

Regular Registration (Not yet Open) INR. 1,80,000.00 INR. 1,95,000.00


For Registrations received by 14-Mar-2020 through 27-Apr-2020

Pricing & Details NACE Members Non Members


Regular Registration (Open) INR. 1,65,000.00 INR. 1,80,000.00

NACE Members Non Members


Regular Registration (Not yet Open) INR. 1,15,000.00 INR. 1,40,000.00

For Registrations received by 4-Mar-2020 through 17-Apr-2020 INR. 1,30,000.00 INR. 1,55,000.0
380000
1 Sec. 2 Technical Competency (Manpower) Key performance indicator like delivery schedule adherence, in process rejection and customer returns
2 Sec. 2 Technical Competency (Manpower) Qualified painting inspector/s-NACE Level # 2 / BGAS 3.2
3 Sec.4 Document Control Fresh assessment
Availability of std catalogues, data sheets, applicable codes/stds

Re-assessment/ surveillance audit


Availability of approved heat treatment procedure
4 Sec.5 Welding Control List of qualified welders and welder continuity record
5 Sec.6 Material Control System Color coding for AS/SS parts/material
Display of color coding chart on shop floor
6 Sec.6 Material Control System Consumable Storage
Material test certificates for consumables, MSDS control
Paint, thinner storage in covered shed
Control of shelf life paints
7 Sec.7 Inspection Control Non conformities system
Disposition of NCRs
*RCA based on NCR *RCA-Root Cause Analysis
8 Sec.9 Blasting and Painting Blasting and painting facility (covered area)
9 Sec.9 Blasting and Painting Blasting
In process records of salt testing, anchor profile, climate conditions are recorded in ligbook
10 Sec.9 Blasting and Painting Painting report
Application by airless , brush, cup, rollers
Strip coat applied after primer
WFT check
DFT check
Climatic conditions record-humidity, job temperature, dew point
Cross cut, adhesion testing (dolly testing). RAL shade matching and record.
11 Sec. 10 Shop Visit Overall workmanship/aesthetics of ongoing jobs
Manufacturing processes on shop floor
Good engineering practices followed on shop floor?

You might also like