Technical Evaluation S.No - File Status: To: PTM & Mi From: Inspection Engineers Sub
Technical Evaluation S.No - File Status: To: PTM & Mi From: Inspection Engineers Sub
_______________________________________________________________________
_
September, 2007
TECHNICAL EVALUATION
PLANT PIPING
12/7/2010 Page 1 of 6
_____________________________________________________________________
INSPECTION SECTION MONTHLY REPORT 2007
_______________________________________________________________________
_
BOILER #2
Government Boiler Inspector visited boiler # 2 on 17th of Sep 2007,
found OK.
Internal cleaning of steam drum, mud drum & external
cleaning all the accessible tubes inside the combustion, super
heater chamber & from inspection windows carried out.
DPT of man ways covers of steam drum, mud drum & hand hole
covers of super heater header carried out. Found ok.
Radiography of boiler tubes from inspection windows & bends of
superheated tubes carried out. Found ok.
UT Monitoring of steam & mud drum carried out from inside.
Gauging of boiler tubes for any bulging carried out. Found ok.
3 no. cyclone separators open for internal inspection. Condition
of all cyclone separators found satisfactory.
Radiography/thickness shots of boiler feed water line carried out,
found ok.
Fabrication & welding of new SS plate of super heater chamber
carried out as per inspection requirement.
Skin plate towards combustion chamber side replaced by Stationary
Section.
Steam & mud drum internally paint with 1 coat of Apexier.
12/7/2010 Page 2 of 6
_____________________________________________________________________
INSPECTION SECTION MONTHLY REPORT 2007
_______________________________________________________________________
_
BOILER 3
Note issued to Stationary Section regarding welding of tube
supports in the next annual shut down of boiler.
TANKS
TANK 4 (Decommissioned For Major Repair)
Preparation of work scope for major repair is in progress.
12/7/2010 Page 3 of 6
_____________________________________________________________________
INSPECTION SECTION MONTHLY REPORT 2007
_______________________________________________________________________
_
OMC LINES
JOINTS REPAIRS
WELDED RADIOGRAPHY (RT & REMARKS
THIS
MONTH TOTAL VISUAL
LINE #1
Line handed over to oil
6ӯ 13 90 45 Nil
movement
(HSD)
LINE #2
Line handed over to oil
6ӯ 10 89 44 Nil
movement
(KERO)
Line tied-in temporarily.
LINE #3
Permanent hook-up will be
6ӯ Nil 62 9 Nil
carried out after removal of
(F/W)
old line.
LINE #4 Line handed over to oil
3 40 20 Nil
6ӯ (MS) movement.
12/7/2010 Page 4 of 6
_____________________________________________________________________
INSPECTION SECTION MONTHLY REPORT 2007
_______________________________________________________________________
_
LINE #5
Only RT of tie-in joints is
8ӯ 2 82 39 Nil.
pending.
(F.OIL)
MATERIAL INSPECTION
FITTINGS, M.S PIPES & VALVES
Inspection of different dia and sizes of fitting, M.S. pipes & Valves at
warehouse carried out. Note issued to material section.
BRASS HX TUBES
Inspection of 100 nos. brass tubes carried out near stationary w/s,
found OK. Note issued to material section.
101-CN GASKETS
Inspection of gaskets of 101-CN carried out at warehouse, 2 nos.
gaskets rejected. Note issued to material section.
JP-1 LINE
Visited 6ӯ JP-1 line near Chamra Chorangi, 4-ft exposed section of
line coated by civil section.
Excavation of 6ӯ JP-1 line in front of PSO gas terminal completed
by civil section to remove the concrete footing, work is in progress.
Visited 6ӯ JP-1 line at Chamra Choragi, line found exposed in
trench being excavated by KW&SB for the installation of concrete
sewerage line.
XCL LINE
Inspection carried out of 10”Ø F.Oil line 130’, 12”Ø line 80’ & 8”Ø
line 110’ at Khy-e-Nishat located in between khy-e-Ittehad and
Hafiz. Workscope issued to stationary section.
12/7/2010 Page 5 of 6
_____________________________________________________________________
INSPECTION SECTION MONTHLY REPORT 2007
_______________________________________________________________________
_
12/7/2010 Page 6 of 6