ADNU - Geotechnical Laboratory

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

IDEAL SET-UP OF METAL FURRING

CEILING INSTALLATION

SUSPENSION CLIP

SUSPENSION CLIP WITH CARRYING CHANNEL


ROD (HANGER)

FURRING CHANNEL W - CLIP

FIBER CEMENT BOARD


HANGER (FURRING CHANNEL)
WITH THE CARRYING
CHANNEL

HANGER (FURRING CHANNEL)

FURRING CHANNEL
PICTURE NO. 1

POSSIBLE CAUSE FOR


THE CEILING TO
COLLAPSE, IF IT IS NOT
PROPERLY FASTENED
THRU THE CONCRETE
WALL

PICTURE NO. 2

PICTURE NO. 3
PICTURE NO. 5

WALL ANGLE

PICTURE NO. 6

PICTURE NO. 7
PICTURE NO. 7 PICTURE NO. 8

PICTURE NO. 9
PICTURE NO. 7
RAFTER/
PICTURE NO. TRUSS
7,8&9

WALL:
EMERGENCY FIBER
STOCK ROOM
EXIT NOT TO SCALE CEMENT
NOT TO SCALE GENSET AREA
NOT TO SCALE BOARD

CEILING:
PICTURE NO. 7 CEMENT
BOARD

PICTURE NO. 5&6 WALL ANGLE

FURRING
CHANNEL

CONCRETE
WALL/FENCE
WALL CLADDING
 FURRING CHANNEL
 CEMENT BOARD
PICTURE NO. 1, 2, & 3

SOIL LABORATORY
NOT TO SCALE

WALL CLADDING
NOT TO SCALE

DRAWING FOR VISUAL PURPOSES ONLY


NOT TO SCALE

You might also like