Professional Documents
Culture Documents
VOY 13-14 Passage Plan Merak Surabaya
VOY 13-14 Passage Plan Merak Surabaya
Signature)
VISUAL
0S 1 RADAR ECHOSOUNDER
105’56. 02 0,5 √2 GPS mnt nm 8 knots ON, MASTER ON
7 NM 1 hour 0.8m
39 E 3 NM BRIDGE
3
Sighting
Other
918
VISUAL
05’51.9 √1
0S RADAR 15
2 420 2 12 knots
105’59. GPS mnt
07 0.6 0,5
40 E 8 NM 1,2m 3
7 hours NM
Sighting
Other
918
VISUAL
09 33.5 2.8 1,2m 0,5
05’50.0 √1
0 NM hours NM
0S RADAR 15
3 412 2 12 knots
2056 106’06. GPS mnt
00 E 3
Sighting
Other
VISUAL
0S RADAR
2
933 106’40. 06 16.5 1.4 0,5 GPS mnt
1,2m 3
00 E 9 NM hours NM
Sighting
Other
VISUAL
1
RADAR
2
GPS
3
Sighting
Other
GPS
Sighting
Other
3729
VISUAL
05’- √1
Other
3730
VISUAL
06’- √1
Other
3731
VISUAL
18 4.5 0.6 0.8m 0,5
06’- √1
0 NM hour NM
46,00 S RADAR 15
8 4.5 2 12 knots
112’- GPS mnt
46,00E 3
Sighting
Other
9 3731 06’- 0 5
1 8 knots ECHOSOUNDER
VISUAL
51,50 S RADAR
√2 ON, MASTER ON
112’- GPS mnt
3 BRIDGE
46,00E
Sighting
Other
VISUAL
1
RADAR
2
GPS
3
Sighting
Other
VISUAL
1
RADAR
2
GPS
3
Sighting
Other
1
VISUAL
RADAR
2
GPS
3
Sighting
Other
Vessel Name SUCCESS VICTORY XXXIV Voyage 13/14 Ttl dist. 427 M
: No. :
Master CAPT. TOTOK SUMINTO From : MERAK
Date : 20 March 2014 To : SURABAYA
2. CHARTS (concerned for the passage of Wa. St. and adjacent waters)
CHART No. laid out Corrected CHART No. laid out Corrected
track lines NTM# track lines NTM#
# #
# #
# #
# #
# #
# #
# #
# #
# #
# #
# #
# Track lines were checked by :
#
#
#
#
#
7. EMERGENCY PROCEDURES
Interval
Navigation area & condition
By master By company
In coastal waters EVERY 15 min. EVERY 15 min.
In confined waters EVERY 5 min. EVERY 5 min.
In restricted visibility EVERY 20 min. EVERY 20 min.
In deep sea EVERY 30 min. EVERY 30 min.
*Interval of position fixing
- The position fixed should be taken at regular intervals, the frequency depending upon factors such as distance from nearest
hazard, speed of vessel, set experienced, etc.
- OOW must be fixed position as more than two methods as like GPS/Radar in coastal or GPS/Sighting in open sea and
bearing of landmarks.
8. CHIEF ENGINEER
Estimate of ROB
Estimate ROB at commence voyage.
FO: MT. MDO: MT. FW: MT Sys. ℓ Cyl. ℓ
Estimate ROB at completion of voyage.
FO: MT. MDO: MT. FW: MT Sys. ℓ Cyl. ℓ
The following Navigation officers and Bridge team members have been briefed on this Passage Plan.
( Name ) ( Position )
√ SURYA HARI PAHRI CHIEF OFFICER
√ ANTONI PRASETYO SECOND OFFICER
√ MAULANA THIRD OFFICER
Signature by Master