Download as pdf or txt
Download as pdf or txt
You are on page 1of 28

COMPANY DOC. No. LNNN-XX-XXX-NNNN REV.

JKC DOC. No. H-0790-1241-0001 C


COMPANY CONTRACT No. HOLD Review Class. X

JGC JOB No. HOLD KBR JOB No. HOLD CHIYODA JOB No. HOLD
SHEET 1 OF 28

ICHTHYS ONSHORE LNG FACILITIES

FIRE WATER DEMAND SUMMARY

REV. DATE ISSUE PURPOSE PREPARED CHECKED APPROVED


A 12-Aug-11 IFI T. Miyashita Y. Hiroya Y. Hiroya

B 26-Aug-11 IFI T. Miyashita Y. Hiroya Y. Hiroya

C 13-Dec-11 IFI T. Miyashita Y. Hiroya Y. Hiroya

FORM EPC-0 2
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 2 of 28

Hold List
(1) None
Contents

1. INTRODUCTION .............................................................................................4
1.1 Scope ..............................................................................................................4
1.2 Definitions........................................................................................................5
1.3 Applicable Specification and Standards ...........................................................5
1.3.1 Contractors Documents ...................................................................................5
1.3.2 Company Documents ......................................................................................5
1.3.3 Australian & International Codes and Standards..............................................5
1.4 Abbreviations...................................................................................................6

2. BASE FIREWATER SYSTEM LAYOUT FOR THE CALCULATION...............6


2.1 JGC Scope ......................................................................................................6
2.2 Chiyoda Scope ................................................................................................6
2.3 KBR Scope ......................................................................................................6

3. FIRE WATER DEMAND ..................................................................................6


3.1 Process Train Area ..........................................................................................6
3.2 Gas inlet facilities area.....................................................................................7
3.3 Product Loading Area ......................................................................................7
3.4 LNG Storage Tank Area ..................................................................................7
3.5 LPG Storage Tank Area...................................................................................7
3.6 Condensate Storage Tank Area.......................................................................7
3.7 Boil Off Gas Area.............................................................................................7
3.8 LNG Boil Off Gas Area.....................................................................................8
3.9 Common Utility Area ........................................................................................8
3.10 Drainage and Effluent Treatment Area.............................................................8
3.11 Open Ground Flare Area..................................................................................8
3.12 Operation Complex..........................................................................................8

4. WATER APPLICATION RATE ........................................................................8


4.1 Hydrant Hose Stream ......................................................................................8
4.2 Fixed Water Monitor and Oscillating Water Monitor .........................................9
4.3 Water Spray System ........................................................................................9
4.4 Fixed Water Curtain System ..........................................................................10
4.5 Low Expansion Foam System........................................................................10
4.6 High Expansion Foam System.......................................................................10
4.7 Allowance ......................................................................................................10

5. FIRE WATER DEMAND SUMMARY.............................................................10

ATTACHMENT- 1 LNG TRAIN 1 AREA (YOC)......................................................11


ATTACHMENT- 2 INLET FACILITIES AREA (YOC)..............................................11
ATTACHMENT- 3 COMMON UTILITY AND OPEN GROUND FLARE KNOCK
OUT DRUM AREA (TOC) .........................................................11
ATTACHMENT- 4 LNG TANK AREA (TOC) ..........................................................11
ATTACHMENT- 5 LPG TANK AREA (TOC) ..........................................................11
ATTACHMENT- 6 LPG / CONDENSATE LOADING JETTY (TOC) .......................11
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 3 of 28

ATTACHMENT- 7 LNG LOADING JETTY (TOC) ..................................................11


ATTACHMENT- 8 LPG BOIL-OFF GAS AREA (TOC)...........................................11
ATTACHMENT- 9 CONDENSATE TANK AND LNG BOIL - OFF GAS AREA
(TOC) ........................................................................................11
ATTACHMENT- 10 UTILITIES ANNEX (TOC) .........................................................11
ATTACHMENT- 11 FUTURE AREA (TOC)..............................................................11
ATTACHMENT- 12 OPERATIONS COMPLEX SHEET-1 (POC) .............................11
ATTACHMENT- 13 OPERATIONS CONPLEX SHEET-2 (POC)..............................11
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 4 of 28

1. INTRODUCTION

1.1 Scope
This document summarizes the fire water demand information for designing a suitable fire
water system and sewer system for the plant and jetty areas. It also intends to provide general
principles and requirements for designing a suitable active fire protection equipment/system
for the plant and jetty areas
This document provide the fire water demand information for all onshore facilities i.e. Process
area, Utility area, Offsite tank, Jetty area, Operation complex, etc. of Ichthys Onshore LNG
Facilities Project to be constructed at Blaydin Point, to the southeast of Darwin, in the
Northern Territory (NT).
This document is one of the HSE design related documents in Ichthys Onshore LNG Facilities
Project. HSE design related documents are listed in Table.1.

Table 1. HSE Design Related Documents


Category Document Information

Company Doc. No. JV Doc. No. Title


Overall HSE Design L290-AH-PHI-0001 S-0290-1242-B002 HSE Philosophy
Plant Facilities Layout L290-AP-PHI-0004 S-0290-1225-0001 Plant Layout Philosophy
L290-AH-MTX-0001 S-0290-1242-B006 Plant Separation Matrix
L290-AX-BOD-0001 S-0290-1360-0001 Basis of Design for Piping Engineering

L290-AS-BOD-0001 S-0290-13L0-0001 Structural Design Criteria for Module


Hazardous Area Classification L780-AE-PHI-0001 S-0780-1380-0101 Electrical Design Philosophy
Fire Hazard Management L790-AF-PHI-0001 S-0790-1241-0001 Active Fire Protection Philosophy
L830-AF-PHI-0001 S-0830-1241-0001 Fire and Gas Detection Philosophy
L790-AL-PHI-0001 S-0790-1241-0003 Fireproofing Philosophy
L290-AH-PHI-0005 S-0290-1242-B005 Plant Zoning Philosophy
Explosion Hazard L290-AH-PHI-0001 S-0290-1242-B002 HSE Philosophy
Management
Isolation DEV-OPS-PH-0005 - Ichthys Onshore Mechanical Isolation
Philosophy

Overpressure & Relief L290-AP-PHI-0003 S-0290-1222-0006 Overpressure Protection, Flare and


Protection Vent Philosophy

Emergency Shutdown and L290-AP-PHI-0002 S-0290-1222-0005 Emergency Shutdown and


Depressuring System Depressuring System Philosophy
L290-AP-PHI-0005 S-0290-1242-B005 Plant Zoning Philosophy

Emergency Power L780-AE-PHI-0001 S-0780-1380-0101 Electrical Design Philosophy


HVAC L300-AA-GLN-0002 S-0300-1340-3011 General Design Brief for Building
HVAC

Control of Spills L290-AH-PHI-0002 S-0290-1242-B003 LNG/LPG Spill Control Philosophy


Drainage L750-AP-PHI-0001 S-0750-1222-0001 Drainage and Effluent Treatment
Philosophy
Paving L320-AC-BOD-0001 S-0320-1310-0001 Design Criteria for Civil and Stick Build
Structure
Escape, Evacuation and L290-AH-PHI-0004 S-0290-1242-B004 Design Philosophy for Means of
Rescue Escape

Human Factor L290-AH-PHI-0003 S-0290-1245-0001 Human Factor Engineering Philosophy


Noise L290-AH-SPC-0002 S-0290-1244-0001 Noise Control Specification
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 5 of 28

Category Document Information


Company Doc. No. JV Doc. No. Title

Environment C075-AH-SPC-0001 Specification Environmental


Requirements for the Ichthys Gas Field
Development Project

L075-AH-LIS-0001 Environmental Commitments Register


– Onshore and Nearshore Facilities

L290-AH-SPC-0001 Asbestos Product Ban Specification

1.2 Definitions
z COMPANY : INPEX Operations Australia Pty Ltd
z CONTRACTOR : The Joint Venture between JGC, KBR and CHIYODA

1.3 Applicable Specification and Standards


The project shall be designed in accordance with the requirements of codes and standards
defined in this section.
The following shall be used, in order of decreasing precedence:
1. Applicable Commonwealth and Northern Territory regulatory/statutory requirements;
2. International laws and regulations where they do not conflict with item 1;
3. Client corporate standards and project standards where they do not conflict with items 1
or 2; and,
4. Recognized local and international codes, standards and guidelines where they do not
conflict with 1, 2 or 3.
The following reference shall be applied to the extent specified in this philosophy.

1.3.1 Contractors Documents


(1) L290-AH-PHI-0001 HSE Philosophy
(2) L290-AH-PHI-0005 Plant Zoning Philosophy
(3) L290-AF-PHI-0002 LNG/LPG Spill Control Philosophy
(4) L790-AF-PHI-0001 Active Fire Protection Philosophy

1.3.2 Company Documents


(1) C060AP0001 Operations and Maintenance Philosophy for design
(2) C290AG0004 Basis of Design

1.3.3 Australian & International Codes and Standards


(1) Australian Standard
AS 2419.1 Fire Hydrant Installations
AS 2941 Fixed Fire Protection Installations – Pump Set Systems
AS 2118.3 Automatic sprinkler systems Part3: Deluge
AS 2441 Installation of fire hose reels
BCA Building code of Australia
(2) National Fire Protection Association Codes
NFPA 11 Standard for Low-, Medium-, and High-Expansion Foam
NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 6 of 28

NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection
NFPA 24 Standard for the Installation of Private Fire Service Mains and Their
Appurtenances.
NFPA 59A Standard for the Production, Storage and Handling of Liquefied Natural
Gas (LNG)
(3) American Petroleum Institute (API)
API STD 2510 Design and Construction of LPG Installations, 8th ed. – 2001
API PUBL 2510A Fire-Protection Considerations in the Design and Operation of
Liquefied. Petroleum Gas (LPG) Storage Facilities, 2nd ed. – 1996
(4) EN standard
BS EN 1473 Installation and Equipment for Liquefied Natural Gas – Design of
Onshore Installations, Jan 2007

1.4 Abbreviations
The following abbreviations are used in this document:
z AS : Australian Standard
z LNG : Liquefied Natural Gas
z LPG : Liquefied Petroleum Gas
z POC : Perth Operating Centre
z TOC : Tsurumi Operating Centre
z YOC : Yokohama Operating Centre

2. BASE FIREWATER SYSTEM LAYOUT FOR THE CALCULATION

2.1 JGC Scope


L790-DF-LAD-0001.001 FIREWATER SYSTEM LAYOUT DRAWING FOR LNG TRAIN 1
AREA
L790-DF-LAD-0009.001 FIREWATER SYSTEM LAYOUT DRAWING FOR INLET
FACILITIES AREA

2.2 Chiyoda Scope


Refer to correspondence : TSO/FIRE-0042

2.3 KBR Scope


Refer to correspondence: PSO/FIRE-0018

3. FIRE WATER DEMAND

The minimum fire water demand for the plant shall be the highest fire water demand among
the collective water requirements of the following scenarios. Refer to Para 3.4 of Active Fire
Protection Philosophy, L790-AF-PHI-0001.

3.1 Process Train Area


The minimum fire water requirement shall be the sum of the following:
(1) All fixed water spray system(s) requirement within the active fire protection zone with
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 7 of 28

the highest demand


(2) All fixed water and/or water oscillating monitors within the active fire protection zone
(3) All fixed high expansion foam system(s) requirement for LNG impounding basin serving
the active fire protection zone
(4) Four(4) hose streams from hydrants within active fire protection zone

3.2 Gas inlet facilities area


The minimum fire water requirement shall be the sum of the following:
(1) All fixed water spray system(s) requirement within the active fire protection zone with
the highest demand
(2) All fixed water and/or water oscillating monitors within the active fire protection zone
(3) Four(4) hose streams from hydrants within the active fire protection zone

3.3 Product Loading Area


The minimum fire water requirement shall be the sum of:
(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water curtain system(s) within the active fire protection zone
(3) All fixed high expansion foam system(s) requirement for LNG impounding basin serving
the active fire protection zone
(4) All fixed remote monitors within the active fire protection zone
(5) Four(4) hose streams from hydrants within the active fire protection zone

3.4 LNG Storage Tank Area


The minimum fire water requirement shall be the sum of:
(1) High expansion foam system requirement for impounding basin
(2) All water spray system(s) requirement for affected LNG tank
(3) Four(4) hose streams from hydrant

3.5 LPG Storage Tank Area


The minimum fire water requirement shall be the sum of:
(1) All water spray system(s) requirement within the largest demand fire zone
(2) Four(4) hose streams from hydrant

3.6 Condensate Storage Tank Area


The minimum fire water requirement shall be the sum of:
(1) Low expansion foam system requirement on the tank’s rim seal fire
(2) Fixed water spray system requirement for shell cooling of the tank on fire
(3) All fixed water spray system(s) requirement for cooling adjacent tanks and/or equipment
(4) Two(2) supplementary foam hose streams
(5) Two(2) hose streams from hydrants

3.7 Boil Off Gas Area


The minimum fire water requirement shall be the sum of:
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 8 of 28

(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water and/or oscillating monitors within the active fire protection zone above
(3) Four(4) hose streams from hydrants

3.8 LNG Boil Off Gas Area


The minimum fire water requirement shall be the sum of:
(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water and/or water oscillating monitors within the active fire protection zone
above
(3) Four(4) hose streams from hydrants

3.9 Common Utility Area


The minimum fire water requirement shall be the sum of:
(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water and/or water oscillating monitors within the active fire protection zone
above
(3) Four(4) hose streams from hydrants

3.10 Drainage and Effluent Treatment Area


The minimum fire water requirement shall be the sum of:
(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water and/or water oscillating monitors within the active fire protection zone
above
(3) Four(4) hose streams from hydrants

3.11 Open Ground Flare Area


The minimum fire water requirement shall be the sum of:
(1) All fixed water spray system(s) requirement within the highest demand of active fire
protection zone
(2) All fixed water and/or water oscillating monitors within the active fire protection zone
above
(3) Four(4) hose streams from hydrants

3.12 Operation Complex


The minimum fire water requirement shall be the sum of:
(1) All water sprinkler system(s) requirement activated at once
(2) Two(2) hose streams from indoor/outdoor hydrants near building

4. WATER APPLICATION RATE

4.1 Hydrant Hose Stream


INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 9 of 28

(Ref: Para 4.1 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)


The capacity of one hydrant Hose Stream is 600 l/min.

4.2 Fixed Water Monitor and Oscillating Water Monitor


(Ref: Para 4.4 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)
The capacity of one fixed water monitor and oscillating water monitor is 1,900 l/min.
The capacity of one remotely operated water or foam/water monitor is 3,000 l/min.

4.3 Water Spray System


(Ref: Para 4.5.2 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)
Water spray densities are as follows.
(1) For horizontal, vertical and spherical vessels:
- 10.2 l/min/m2 of exposed surfaces
For saddles without fireproofing:
- 4.1 l/min/m2 of one side surface of the saddle
Spherical and horizontal cylindrical surfaces below the vessel equator shall have direct
water impingement since rundown will not be considered.
LPG sphere water spray systems shall be designed based on NFPA 15.
(2) For heat exchangers:
- 10.2 l/min/m2 of exposed surfaces
(3) For pumps:
- 20.4 l/min/m2 of the floor area including surrounding strip of 0.6m width around the
pump but excluding the driver
Water sprays protecting pumps shall be designed to cover the suction and discharge
valves and pump seals.
(4) For compressors:
- 20.4 l/min/m2 of projected surface area
Water spray shall be applied for the top and underside of compressors to be protected if
surge drums are to be located at underside of the compressor. Top sprays shall utilize
adjustable water nozzles while the underside of the compressor will require
conventional spray nozzles.
The lube and seal oil consoles if located inside of the shelter shall also be sprayed with
20.4 l/min/m2 of horizontal area.
(5) For safety relief valves including tail pipe on LNG tanks:
- 20.4 l/min/m2
(6) For horizontal, stressed structural steel members:
- 4.1 l/min/m2 of one side surface of the structure
For vertical, stressed structural steel members:
- 10.2 l/min/m2 of one side surface of the structure
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 10 of 28

The nozzle type and flow rate per each nozzle are summarized as follows.
Nozzle Type Operation K-Factor Flow Rate Remarks
Pressure
(kPa) - (Lpm)
NTL-C 60GPM 350 Fixed 109.80
NTL-C 40GPM 350 Fixed 166.50 Supplement nozzle for
Water Monitor
D3 No.18 200 25.9 36.60
D3 No.21 200 33.1 46.80
D3 No.24 200 43.2 61.10
D3 No.28 200 59 83.40

4.4 Fixed Water Curtain System


(Ref: Para 4.6 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)
The curtain flow rate shall be 50 l/min/liner meter.

4.5 Low Expansion Foam System


(Ref: Para 4.7 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)
For extinguishing rim seal fires, a foam solution application basis shall be at least 12.2
l/min/m2 of the area located between inside tank shell and foam dam.
In addition, portable low expansion foam units shall also be provided as supplementary
protection for small spill fires on the condensate storage area.

4.6 High Expansion Foam System


(Ref: Para 4.8 of Active Fire Protection Philosophy, L-790-AF-PHI-0001)
A foam solution application rate shall be at least 2 l/min/m2 of the liquid surface.

4.7 Allowance
For YOC Area, 20% allowance is considered against calculated fire water demand.

5. FIRE WATER DEMAND SUMMARY

Firewater demand are calculated and summarized in the following table.


Table-5-1: Executive Summary
Table-5-2: Firewater Demand for LNG Train-1 Area
Table-5-3: Firewater Demand for Inlet Facilities Area
INPEX Operations Australia Pty Ltd COMPANY Doc. No. LNNN-XX-XXX-NNNN
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. H-0790-1241-0001 Rev.C
FIRE WATER DEMAND SUMMARY Sheet No. 11 of 28

Attachment
AFP Zone and Fire Water Demand Drawings

ATTACHMENT- 1 LNG TRAIN 1 AREA (YOC)

ATTACHMENT- 2 INLET FACILITIES AREA (YOC)

ATTACHMENT- 3 COMMON UTILITY AND OPEN GROUND FLARE KNOCK OUT


DRUM AREA (TOC)

ATTACHMENT- 4 LNG TANK AREA (TOC)

ATTACHMENT- 5 LPG TANK AREA (TOC)

ATTACHMENT- 6 LPG / CONDENSATE LOADING JETTY (TOC)

ATTACHMENT- 7 LNG LOADING JETTY (TOC)

ATTACHMENT- 8 LPG BOIL-OFF GAS AREA (TOC)

ATTACHMENT- 9 CONDENSATE TANK AND LNG BOIL - OFF GAS AREA (TOC)

ATTACHMENT- 10 UTILITIES ANNEX (TOC)

ATTACHMENT- 11 FUTURE AREA (TOC)

ATTACHMENT- 12 OPERATIONS COMPLEX SHEET-1 (POC)

ATTACHMENT- 13 OPERATIONS CONPLEX SHEET-2 (POC)


INPEX Operations Australia Pty Ltd COMPANY Doc. No._____N/A______
ICHTHYS ONSHORE LNG FACILITIES (EPC) JKC Doc. No. H-0790-1241-0001 Rev.C
YOC FIRE WATER DEMAND SUMMARY Sheet No._12 of 28
TABLE-5-1
FIRE WATER DEMAND SUMMARY _ EXECUTIVE SUMMARY
SPRAY SYSTEM HIGH EX. WATER CURTAIN WATER MONITOR SUPPLEMENT NOZZLE ADDITIONAL HOSE TOTAL
Scope AREA AFP ZONE Lpm Lpm Lpm Lpm Lpm Lpm Lpm m3/h
LNG TRAIN-1 FZ-A1 4500.48 - - - - 2400.00 6900.48 414.03
FZ-A2 22757.28 - - - - 2400.00 25157.28 1509.44
FZ-A3 4425.84 - - 3800.00 1589.87 2400.00 12215.71 732.94
FZ-A4 1899.36 - 3662.82 - - 2400.00 7962.18 477.73
FZ-A5 5726.16 200.00 - 5700.00 454.25 2400.00 14480.41 868.82
FZ-A6 11425.92 - - 3800.00 - 2400.00 17625.92 1057.56
FZ-A7 16643.52 - - 7600.00 1817.04 2400.00 28460.56 1707.63
Inlet Facilities FZ-B1 4743.36 - - - - 2400.00 7143.36 428.60
YOC
FZ-B2 4743.36 - - - - 2400.00 7143.36 428.60
FZ-B3 4743.36 - - - - 2400.00 7143.36 428.60
FZ-B4 6658.56 - - - - 2400.00 11458.56 687.51
FZ-B5 2459.52 - - - - 2400.00 14359.52 861.57
FZ-B6 - - - 9500.00 - 2400.00 14359.52 861.57
FZ-B7 - - - - - 2400.00 2400.00 144.00
FZ-B8 - - - - - 2400.00 2400.00 144.00
FZ-B9 - - - - - 2400.00 2400.00 144.00
Common Utility and FZ-B101 - - - - - - 4300.00 258.00
Open Ground Flare FZ-B102 - - - - - - 2400.00 144.00
Knock Out Drum FZ-B201 - - - - - - 5855.00 351.30
FZ-B301 - - - - - - 8100.00 486.00
LNG Tank FZ-C101 - - - - - - 17360.00 1041.60
FZ-C102 - - - - - - 17360.00 1041.60
FZ-C201 - - - - - - 9900.00 594.00
FZ-C202 9900.00 594.00
FZ-C203 - - - - - - 15526.67 931.60
FZ-C501 - - - - - - 4300.00 258.00
LNG Loading Jetty FZ-D101 - - - - - - 2660.00 159.60
TOC
LPG/Condensate Loding
FZ-D201
Jetty - - - - - - 2400.00 144.00
LPG Boil - Off Gas FZ-C401 - - - - - - 12376.67 742.60
FZ-C402 - - - - - - 12376.67 742.60
Condensate Tank and FZ-C301 - - - - - - 19441.67 1166.50
LNG Boil - Off Gas FZ-C302 - - - - - - 16416.67 985.00
FZ-C303 - - - - - - 5415.00 324.90
FZ-C304 - - - - - - 4500.00 270.00
FZ-C701 - - - - - - 10908.33 654.50
Utilities Annex FZ-E301 - - - - - - 2400.00 144.00
Future FZ-E601 - - - - - - 2400.00 144.00
Gate House N/A - - - - - - 3000.00 180
Hazardous Materials
180
Warehouse N/A - - - - - - 3000.00
Warehouse N/A - - - - - - 3000.00 180
POC
Workshop N/A - - - - - - 3000.00 180
Operations Office N/A - - - - - - 3000.00 180
CCB N/A - - - - - - 3000.00 180
Laboratory N/A - - - - - - 3000.00 180
INPEX Operations Australia Pty Ltd COMPANY Doc. No.____N/A___
ICHTHYS ONSHORE LNG FACILITIES (EPC) JKC Doc. No. H-0790-1241-0001 Rev.C
YOC FIRE WATER DEMAND SUMMARY Sheet No._13 of 28
TABLE-5-2
FIRE WATER DEMAND SUMMARY _ LNG TRAIN-1 (YOC)
WATER SPRAY SYSTEM/WATER CURTAIN NOZZLE/SUPPLIMENT NOZZLE

Equipment Information Minimum Requirement Calculated Total Water WATER MONITOR


Demand per Additional Hose
Capacity System(inclusive of Streams Firewater Demand
Protection Total Surface Nozzle Quantity Nozzle Water Water Demand 20% allowance for Flow Rate per Water
AFP ZONE App. Rate Water Demand K Factor per Quantity TOTAL (4 Hose Stream) Remarks
Method Area (per equipment) Discharge Pressure Demand (inclusive of 20% allowance) Spray/Curtain) Water Monitor Demand
Equipment No. Service Nozzle

m2 lpm/m2 Lpm pcs. Lpm/bar0.5 barg Lpm Lpm Lpm Lpm pcs Lpm Lpm Lpm Lpm Lpm m3/hr

FZ-A1 L-661-V-002 HP FUEL GAS MIXING DRUM SPRAY 68.5 10.2 698.7 22 25.9 2 36.60 805.20 966.24
L-641-V-001 HOT OIL SURGE DRUM SPRAY 131.3 10.2 1339.26 24 43.2 2 61.10 1466.40 1759.68
L-661-E-001 HP FUEL GAS HEATER SPRAY 4 10.2 40.8 4 25.9 2 36.60 146.40 175.68
L-641-P-001A HOT OIL CIRCULATION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.55 333.10 399.72 4500.48 - - - 0 2400 6900.48 414.03
L-641-P-001B HOT OIL CIRCULATION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.55 333.10 399.72
L-641-P-001C HOT OIL CIRCULATION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.55 333.10 399.72
L-641-P-001D HOT OIL CIRCULATION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.55 333.10 399.72

FZ-A2 L-611-C-001 DEMETHANIZER SPRAY 55.4 10.2 565.08 10 43.2 2 61.10 611.00 733.20
L-611-C-002 DEPROPANISER SPRAY 73 10.2 744.6 16 33.1 2 46.80 748.80 898.56
L-611-C-003 DEBUTANISER SPRAY 58.4 10.2 595.68 16 33.1 2 46.80 748.80 898.56
L-611-C-004 DEISOPENTANISER SPRAY 59.4 10.2 605.88 16 33.1 2 46.80 748.80 898.56
L-611-P-001A DEETHANISER REFLUX PUMP SPRAY 11.9 20.4 242.76 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-001B DEETHANISER REFLUX PUMP SPRAY 11.9 20.4 242.76 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-002A DEPROPANISER REFLUX PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-002B DEPROPANISER REFLUX PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-003A DEBUTANISER REFLUX PUMP SPRAY 9.5 20.4 193.8 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-003B DEBUTANISER REFLUX PUMP SPRAY 9.5 20.4 193.8 2 Fixed 3.5 109.80 219.60 263.52
8461.68 - - -
L-611-P-004A REINJECTION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-004B REINJECTION PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
L-611-P-005A DEISOPENTANIZER REFLUX PUMP SPRAY 9.5 20.4 193.8 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-005B DEISOPENTANIZER REFLUX PUMP SPRAY 9.5 20.4 193.8 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-006A CONDENSATE RUNDOWN PUMP SPRAY 3.2 20.4 65.28 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-006B CONDENSATE RUNDOWN PUMP SPRAY 3.2 20.4 65.28 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-007A PROPANE REINJECTION PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 109.80 219.60 263.52
- 2400 25157.28 1509.4368
L-611-P-007B PROPANE REINJECTION PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-008A BUTANE REINJECTION PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 109.80 219.60 263.52
L-611-P-008B BUTANE REINJECTION PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 109.80 219.60 263.52
L-611-V-001 DEETHANISER REFLUX DRUM SPRAY 96.7 10.2 986.34 22 33.1 2 46.80 1029.60 1235.52
L-611-V-002 DEPROPANIZER REFRUX DRUM SPRAY 66.8 10.2 681.36 24 25.9 2 36.60 878.40 1054.08
L-611-V-003 DEBUTANIZER REFRUX DRUM SPRAY 49.2 10.2 501.84 20 25.9 2 36.60 732.00 878.40
L-611-V-004 DEISOPENTANISER REFLUX DRUM SPRAY 72.7 10.2 741.54 30 25.9 2 36.60 1098.00 1317.60
7823.52 - - -
L-611-V-005 REINJECTION DRUM SPRAY 35.3 10.2 360.06 16 25.9 2 36.60 585.60 702.72
L-611-E-007 DEBUTANISER REBOILER SPRAY 42 10.2 428.4 20 25.9 2 36.60 732.00 878.40
L-611-E-017 PROPANE RUNDOWN COOLER SPRAY 38.5 10.2 392.7 20 25.9 2 36.60 732.00 878.40
L-611-E-018 BUTANE RUNDOWN COOLER SPRAY 25.7 10.2 262.14 20 25.9 2 36.60 732.00 878.40
L-611-E-001 DEETHANISER SPRAY 118.6 10.2 1209.72 30 33.1 2 46.80 1404.00 1684.80
L-611-E-002 CONDENSER
DEETHANISER SPRAY 71 10.2 724.2 24 25.9 2 36.60 878.40 1054.08
L-611-E-004 REBOILER
DEPROPANISER REBOILER SPRAY 49 10.2 499.8 25 25.9 2 36.60 915.00 1098.00
6472.08 - - -
L-611-E-009 PROPANE RECYCLE COOLER SPRAY 32.3 10.2 329.46 20 25.9 2 36.60 732.00 878.40
L-611-E-012 DEISOPENTANISER REBOILER SPRAY 45.1 10.2 460.02 20 25.9 2 36.60 732.00 878.40
L-611-E-015 REINJECTION COOLER SPRAY 38.5 10.2 392.7 20 25.9 2 36.60 732.00 878.40

FZ-A3 L-561-V-001 DEHYDRATION INLET SEPARATOR SPRAY 86.1 10.2 878.22 22 33.1 2 46.80 1029.60 1235.52
2553.12 - - -
L-561-E-001 DEHYDRATION PRECOOLER SPRAY 106.8 10.2 1089.36 30 25.9 2 36.60 1098.00 1317.60
L-551-C-002 AGRU ABSORBER SPRAY 50.2 10.2 512.04 12 33.1 2 46.80 561.60 673.92
L-641-P-003A AGRU REBOILER HEATING MEDIUM SPRAY 11.1 20.4 226.44 2 Fixed - 166.50 333.00 399.60
1872.72 - - -
L-641-P-003B PUMP REBOILER HEATING MEDIUM
AGRU SPRAY 11.1 20.4 226.44 2 Fixed - 166.50 333.00 399.60
L-641-P-003C PUMP
AGRU REBOILER HEATING MEDIUM SPRAY 11.1 20.4 226.44 2 Fixed - 166.50 333.00 399.60
3800 2400 12215.71 732.94248
L-551-C-001 PUMP
AGRU REGENERATOR MONITOR + NOZZLE 130.2 10.2 1328.04 1 Fixed - 227.12 227.12 -
L-561-V-002A DEHYDRATOR MONITOR + NOZZLE 111.98 10.2 1142.196 2 Fixed - 227.12 454.25 -
1589.87
L-561-V-002B DEHYDRATOR MONITOR + NOZZLE 111.98 10.2 1142.196 2 Fixed - 227.12 454.25 -
2 1900 3800
L-561-V-002C DEHYDRATOR MONITOR + NOZZLE 111.98 10.2 1142.196 2 Fixed - 227.12 454.25 -
L-561-V-003 REGENERATION GAS KO DRUM MONITOR 26.87 10.2 274.074 0 - - - - - -
L-561-V-004 WATER COALESCHR MONITOR 3.23 10.2 32.946 0 - - - - - -

FZ-A4 L-551-F-031 THERMAL INCINERATOR WATER CURTAIN 60 50 3000 35 39 5 87.21 3052.35 3662.82 3662.82 - - -
L-551-V-004 REGENERATOR OVHD SPRAY 109.7 10.2 1118.94 26 33.1 2 46.80 1216.80 1460.16
1899.36 - - -
- 2400 7962.18 477.7308
L-661-V-001 ACCUMMULATOR
LP FUEL GAS MIXING DRUM SPRAY 14.9 10.2 151.98 10 25.9 2 36.60 366.00 439.20

FZ-A5 L-591-V-001 END FLASH DRUM SPRAY 101.7 10.2 1037.34 16 59 2 83.40 1334.40 1601.28
L-591-E-007 END FLASH EXCHANGER SPRAY 48.3 10.2 492.66 8 59 2 83.40 667.20 800.64
L-591-P-001A LNG RUNDOWN PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 166.50 333.00 399.60
3728.16 - - -
L-591-P-001B LNG RUNDOWN PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 166.50 333.00 399.60
L-591-K-003 LNG LIQUID EXPANDER SPRAY 7 20.4 142.8 2 Fixed 3.5 109.80 219.60 263.52
L-601-K-005 MR LIQUID EXPANDER SPRAY 7 20.4 142.8 2 Fixed 3.5 109.80 219.60 263.52
5700.00 2400.00 14480.41 868.82
L-601-K-002 LP MR COMPRESSOR SPRAY 33 20.4 673.2 6 Fixed 3.5 166.50 999.00 1198.80
1998.00 - - -
L-601-K-003 MP MR COMPRESSOR SPRAY 16 20.4 326.4 4 Fixed 3.5 166.50 666.00 799.20
L-601-V-007 LP MR SUCTION DRUM MONITOR + NOZZLE 136.66 10.2 1393.932 2 Fixed - 227.12 454.25 - 454.25
L-591-E-006 MAIN CRYOGENIC HEAT EXCHANGER MONITOR 121.94 10.2 1243.788 0 - - - - - - 3 1900 5700
L-641-E-002 No. 2 HOT OIL WHRU MONITOR 319.07 10.2 3254.514 0 - - - - - -
LNG impoundment Inpound basin (10m x 10m) HIGH EX. 100 2 200 - - - - - - 200.00 - - -
INPEX Operations Australia Pty Ltd COMPANY Doc. No.____N/A___
ICHTHYS ONSHORE LNG FACILITIES (EPC) JKC Doc. No. H-0790-1241-0001 Rev.C
YOC FIRE WATER DEMAND SUMMARY Sheet No._14 of 28
FIRE WATER DEMAND SUMMARY _ LNG TRAIN-1 (YOC)
WATER SPRAY SYSTEM/WATER CURTAIN NOZZLE/SUPPLIMENT NOZZLE

Equipment Information Minimum Requirement Calculated Total Water WATER MONITOR


Demand per Additional Hose
Capacity System(inclusive of Streams Firewater Demand
Protection Total Surface Nozzle Quantity Nozzle Water Water Demand 20% allowance for Flow Rate per Water
AFP ZONE App. Rate Water Demand K Factor per Quantity TOTAL (4 Hose Stream) Remarks
Method Area (per equipment) Discharge Pressure Demand (inclusive of 20% allowance) Spray/Curtain) Water Monitor Demand
Equipment No. Service Nozzle

m2 lpm/m2 Lpm pcs. Lpm/bar0.5 barg Lpm Lpm Lpm Lpm pcs Lpm Lpm Lpm Lpm Lpm m3/hr

FZ-A6 L-581-V-001 DEMETHANISER FEED VESSEL SPRAY 71.8 10.2 732.36 16 43.2 2 61.10 977.60 1173.12
L-581-E-002 DEMETHANISER FEED EXCHANGER SPRAY 60.4 10.2 616.08 12 43.2 2 61.10 733.20 879.84
L-581-E-003 DEMETHANISER OVHD EXCHANGER SPRAY 61.6 10.2 628.32 12 43.2 2 61.10 733.20 879.84
L-581-E-004 DEMETHANISER SIDE REBOILER SPRAY 35.1 10.2 358.02 12 25.9 2 36.60 439.20 527.04
L-581-E-005 DEMETHANISER REBOILER SPRAY 10.3 10.2 105.06 6 25.9 2 36.60 219.60 263.52 5313.12 - - -
L-581-K-001 DEMETHANIZER INLET EXPANDER SPRAY 24 20.4 489.6 6 Fixed 3.5 109.80 658.80 790.56
L-581-K-002 DEMETHANIZER RECOMPRESSOR SPRAY
L-581-P-001A DEETHANISER FEED PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
3800 2400 17625.92 1057.5552
L-581-P-001B DEETHANISER FEED PUMP SPRAY 11.1 20.4 226.44 2 Fixed 3.5 166.50 333.00 399.60
L-591-K-001 MCHE FEED COMPRESSOR SPRAY 90 20.4 1836 12 Fixed 3.5 166.50 1998.00 2397.60
LUBE OIL FOR
SPRAY 20 10.2 204 4 Fixed 3.5 109.80 439.20 527.04
L-591-K-001
6112.80 - - -
L-591-K-002 END FLASH COMPRESSOR SPRAY 69 20.4 1407.6 12 Fixed 3.5 166.50 1998.00 2397.60
LUBE OIL FOR
SPRAY 37 10.2 377.4 6 Fixed 3.5 109.80 658.80 790.56
L-591-K-002
L-581-C-001 DEMETHANIZER MONITOR 145.9 10.2 1488.18 0 - - - - - - 2 1900 3800

FZ-A7 L-591-E-002 MCHE INLET GAS/HP PROPANE SPRAY 78.1 10.2 796.62 24 25.9 2 36.60 878.40 1054.08
L-601-E-011 COOLER
MR / LLP PROPANE COOLER SPRAY 312.1 10.2 3183.42 38 43.2 2 61.10 2321.80 2786.16
8340.00 - - -
L-601-E-008 MR / HP PROPANE COOLER SPRAY 210.4 10.2 2146.08 44 43.2 2 61.10 2688.40 3226.08
L-591-E-005 MCHE INLET GAS / LLP PROPANE SPRAY 81.3 10.2 829.26 29 25.9 2 36.60 1061.40 1273.68
L-601-V-005 COOLER ACCUMULATOR
PROPANE SPRAY 161.7 10.2 1649.34 30 43.2 2 61.10 1833.00 2199.60
L-601-V-001 LLP PROPANE SUCTION DRUM SPRAY 86.5 10.2 882.3 16 43.2 2 61.10 977.60 1173.12
L-601-V-004 HP PROPANE SUCTION DRUM SPRAY 99.3 10.2 1012.86 20 43.2 2 61.10 1222.00 1466.40 6705.12 - - -
L-601-V-008 HP MR SEPARATOR SPRAY 98.1 10.2 1000.62 20 43.2 2 61.10 1222.00 1466.40
L-601-P-001 PROPANE RETURN PUMP SPRAY 10.3 20.4 210.12 2 Fixed 3.5 166.50 333.00 399.60
L-601-K-001 LP MR COMPRESSOR SPRAY 36 20.4 734.4 6 Fixed 3.5 166.50 999.00 1198.80
1598.40 - - - 7600 2400 28460.56 1707.634
L-601-K-004 MP MR COMPRESSOR SPRAY 16 20.4 326.4 2 Fixed 3.5 166.50 333.00 399.60
L-601-V-002 LP PROPANE SUCTION DRUM MONITOR + NOZZLE 76.53 10.2 780.606 4 Fixed 227.13 908.52 -
1817.04
L-601-V-003 MP PROPANE SUCTION DRUM MONITOR + NOZZLE 88.35 10.2 901.17 4 Fixed - 227.13 908.52 -
L-561-E-002 REGENERATION GAS HEATER MONITOR TBA 10.2 TBA 0 - - - - - -
L-601-V-006 PROPANE DRAIN DRUM MONITOR 47.18 10.2 481.236 0 - - - - - -
L-591-E-003 MCHE INLET GAS/MP PROPANE MONITOR 121.41 10.2 1238.382 0 - - - - - - 4 1900 7600
L-591-E-004 COOLER
MCHE INLET GAS/LP PROPANE MONITOR 132.97 10.2 1356.294 0 - - - - - -
L-601-E-009 COOLER
MR / MP PROPANE COOLER MONITOR 325.8 10.2 3323.16 0 - - - - - -
L-601-E-010 MR / LP PROPANE COOLER MONITOR 317.69 10.2 3240.438 0 - - - - - -
L-641-E-001 No. 1 HOT OIL WHRU MONITOR 144.44 10.2 1473.288 0 - - - - - -
INPEX Operations Australia Pty Ltd COMPANY Doc. No._______N/A___
ICHTHYS ONSHORE LNG FACILITIES (EPC) JKC Doc. No. H-0770-1241-0002 Rev.C
YOC FIRE PROTECTION BM/BQ CONTROL SHEET Sheet No._15 of 28

TABLE-5-3
FIRE WATER DEMAND SUMMARY _ INLET FACILITIES (YOC)
WATER SPRAY SYSTEM/SUPPLIMENT NOZZLE

Equipment Information Minimum Requirement Calculated WATER MONITOR


Total Water Demand Additional Hose
Nozzle Capacity Water Demand per System(inclusive Streams Firewater Demand
Protection Total Surface Nozzle Quantity Water of 20% allowance) Flow Rate per
AFP ZONE App. Rate Water Demand K Factor Discharge per (inclusive of 20% Quantity Water Demand TOTAL (4 Hose Stream) Remarks
Method Area (per equipment) Demand Water Monitor
Equipment No. Service Pressure Nozzle allowance)

Lpm/bar
m2 lpm/m2 Lpm pcs. barg Lpm Lpm Lpm Lpm pcs Lpm Lpm Lpm Lpm Lpm m3/hr
0.5
FZ-B1 L-521-K-001 STABILIZER OVHD COMPRESSOR SPRAY 34.00 20.4 693.6 8 Fixed 3.5 109.8 878.40 1054.08
L-521-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-521-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-521-C-001 STABILIZER SPRAY 36.7 10.2 374.34 12 25.9 2 36.6 439.20 527.04
L-521-V-002 STABILISER OVHD COMPRESSOR SPRAY 14.6 10.2 148.92 8 25.9 2 36.6 292.80 351.36 4743.36 - - - - 2400.00 7143.36 428.60
L-521-V-003 FIRST STAGEOVHD
STABILISER KO DRUM
COMPRESSOR SPRAY 11.3 10.2 115.26 8 25.9 2 36.6 292.80 351.36
L-521-V-001 SECOND STAGE
STABILIZER FEEDKO DRUM
SEPARATOR SPRAY 22.1 10.2 225.42 16 25.9 2 36.6 585.60 702.72
L-521-E-001 STABILIZER REBOILER SPRAY 25.1 10.2 256.02 16 25.9 2 36.6 585.60 702.72
L-521-E-005 STABILIZER PREHEATER SPRAY 27.4 10.2 279.48 12 25.9 2 36.6 439.20 527.04

FZ-B2 L-522-K-001 STABILIZER OVHD COMPRESSOR SPRAY 34.00 20.4 693.6 8 Fixed 3.5 109.8 878.40 1054.08
L-522-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-522-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-522-C-001 STABILIZER SPRAY 36.7 10.2 374.34 12 25.9 2 36.6 439.20 527.04
L-522-V-002 STABILISER OVHD COMPRESSOR SPRAY 14.6 10.2 148.92 8 25.9 2 36.6 292.80 351.36 4743.36 - - - - 2400.00 7143.36 428.60
L-522-V-003 FIRST STAGEOVHD
STABILISER KO DRUM
COMPRESSOR SPRAY 11.3 10.2 115.26 8 25.9 2 36.6 292.80 351.36
L-522-V-001 SECOND STAGE
STABILIZER FEEDKO DRUM
SEPARATOR SPRAY 22.1 10.2 225.42 16 25.9 2 36.6 585.60 702.72
L-522-E-001 STABILIZER REBOILER SPRAY 25.1 10.2 256.02 16 25.9 2 36.6 585.60 702.72
L-522-E-005 STABILIZER PREHEATER SPRAY 27.4 10.2 279.48 12 25.9 2 36.6 439.20 527.04

FZ-B3 L-523-K-001 STABILIZER OVHD COMPRESSOR SPRAY 34.00 20.4 693.6 8 Fixed 3.5 109.8 878.40 1054.08
L-523-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-523-P-001A STABILIZER RECYCLE PUMP SPRAY 3.8 20.4 77.52 2 Fixed 3.5 109.8 219.60 263.52
L-523-C-001 STABILIZER SPRAY 36.7 10.2 374.34 12 25.9 2 36.6 439.20 527.04
L-523-V-002 STABILISER OVHD COMPRESSOR SPRAY 14.6 10.2 148.92 8 25.9 2 36.6 292.80 351.36 4743.36 - - - - 2400.00 7143.36 428.60
L-523-V-003 FIRST STAGEOVHD
STABILISER KO DRUM
COMPRESSOR SPRAY 11.3 10.2 115.26 8 25.9 2 36.6 292.80 351.36
L-523-V-001 SECOND STAGE
STABILIZER FEEDKO DRUM
SEPARATOR SPRAY 22.1 10.2 225.42 16 25.9 2 36.6 585.60 702.72
L-523-E-001 STABILIZER REBOILER SPRAY 25.1 10.2 256.02 16 25.9 2 36.6 585.60 702.72
L-523-E-005 STABILIZER PREHEATER SPRAY 27.4 10.2 279.48 12 25.9 2 36.6 439.20 527.04

FZ-B4 L-510-V-002 FEED GAS SEPARATOR SPRAY 137.7 10.2 1404.54 20 59 2 83.4 1668.00 2001.60
L-510-E-002 FEED PREHEATER SPRAY 42.4 10.2 432.48 20 25.9 2 36.6 732.00 878.40 3778.56 - - - - 2400 6178.56 370.71
L-530-V-001 CONDENSATE MERCURY ADSORBER SPRAY 67 10.2 683.4 16 33.1 2 46.8 748.80 898.56

FZ-B5 L-510-V-001 FEED GAS SEPARATOR SPRAY 137.7 10.2 1404.54 20 59 2 83.4 1668.00 2001.60
2880.00 - - - - 2400 5280.00 316.80
L-510-E-001 FEED PREHEATER SPRAY 42.4 10.2 432.48 20 25.9 2 36.6 732.00 878.40

FZ-B6 L-510-E-003A CONDENSATE PREHEATER SPRAY 10 10.2 102 8 25.9 2 36.6 292.80 351.36
L-510-E-003B CONDENSATE PREHEATER SPRAY 10 10.2 102 8 25.9 2 36.6 292.80 351.36
2459.52 - - - -
L-510-E-004A CONDENSATE PREHEATER SPRAY 27.5 10.2 280.5 20 25.9 2 36.6 732.00 878.40
L-510-E-004B CONDENSATE PREHEATER SPRAY 27.5 10.2 280.5 20 25.9 2 36.6 732.00 878.40 2400 14359.52 861.5712
K-510-V-001 SLUG CATCHER MONITOR 237.8 10.2 2425.56 - - - - - - - 2 1900 3800
K-510-V-001 SLUG CATCHER MONITOR 237.8 10.2 2425.56 - - - - - - - 9500
3 1900 5700
K-510-V-003 FEED GAS PIG RECEIVER MONITOR 160 10.2 1632 - - - - - - -

FZ-B7 - - - - - - - - - - - - - - - - - 2400 2400.00 144

FZ-B8 - - - - - - - - - - - - - - - - - 2400 2400.00 144

FZ-B9 - - - - - - - - - - - - - - - - - 2400 2400.00 144


JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-1 Sheet 16 / 28

144.0 m3/h 144.0 m3/h 467.41 m3/h 363.78 m3/h

FZ-A1 FZ-A2 FZ-A3 FZ-A4

270.14 m3/h 1365.49 m3/h 265.56 m3/h 113.97 m3/h

998.65 m3/h 685.58 m3/h 242.58 m3/h

FZ-A7 FZ-A6 FZ-A5

709.05 m3/h 372.0 m3/h 535.28 m3/h


JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-2 Sheet 17 / 28

FZ-B6

FZ-B7

144.0 m3/h

FZ-B5

316.80 m3/h

FZ-B4

370.71 m3/h

FZ-B3

428.6 m3/h
861.57 m3/h
FZ-B2

428.6 m3/h

FZ-B1

428.6 m3/h

FZ-B8

144.0 m3/h

FZ-B9
144.0m3/h
Attachment-3 JKC Doc. No. H-0790-1241-0001 Rev.C
Sheet 18 / 28

258.0 m3/h
FZ-B101 FZ-B201

FZ-B102 351.3m3/h

144.0 m3/h

144.0 m3/h 342.0 m3/h

FZ-B301
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-4 Sheet 19 / 28

144.0 m3/h 144.0 m3/h

882.0 m3/h 882.0 m3/h


15.6 m3/h 15.6 m3/h

FZ-C101 FZ-C102
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-5 Sheet 20 / 28

114.0 m3/h 144.0 m3/h 144.0 m3/h 787.6 m3/h 144.0 m3/h 144.0 m3/h

FZ-C203

FZ-C202 FZ-C201

FZ-C501
450.0 m3/h 450.0 m3/h
Attachment-6 JKC Doc. No. H-0790-1241-0001 Rev.C
Sheet 21 / 28

684.0 m3/h
144.0 m3/h

FZ-D101
15.6 m3/h
Attachment-7 JKC Doc. No. H-0790-1241-0001 Rev.C
Sheet 22 / 28

144.0 m3/h

804.0 m3/h
FZ-D201
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-8 Sheet 23 / 28

227.1 m3/h 227.1 m3/h


FZ-C402 FZ-C401

371.5 m3/h
371.5 m3/h

144.0 m3/h 144.0 m3/h


Attachment-9 JKC Doc. No. H-0790-1241-0001 Rev.C
Sheet 24 / 28

FZ-C302
FZ-C301

FZ-C303

FZ-C304

879.0 m3/h 106.0 m3/h


106.0 m3/h 218.9 m3/h
1060.5 m3/h 144.0 m3/h
FZ-C701
15.6 m3/h 106.0 m3/h 126.0 m3/h

510.5 m3/h

144.0 m3/h
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-10 Sheet 25 / 28

144.0 m3/h

FZ-E301
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-11 Sheet 26 / 28
FZ-E601

144.0 m3/h
JKC Doc. No. H-0790-1241-0001 Rev.C
Attachment-12 Sheet 27 / 28

180 .0 m3/h
180 .0 m3/h
GATEHOUSE 180 .0 m3/h

HAZARDOUS
180 .0 m3/h MATERIALS
WAREHOUSE

WORKSHOP
WAREHOUSE
Attachment-13 JKC Doc. No. H-0790-1241-0001 Rev.C
Sheet 28 / 28

180 .0 m3/h

OPERATIONS
OFFICE 180 .0 m3/h

LABORATORY CCB

180 .0 m3/h

You might also like