Deliverables List 

 
 Simulation 
 PFDs (Process Flow Diagrams) 
 Material Balances 
 Design Basis 
 Equipment List 
 
 Simulation 
 PFD 
 Material Balances / Water Balances 
 Specifications 
 Material Diagram 
 Operating/Design Temperature/Pressure Diagram 
 Design Basis 
 Tank Sizing Summary 
 Vessel Sizing Calculations 
 Chemical Injection Summary 
 Utilities Balances (FG, IA/UA, Steam, Vapour Recovery, Glycol) 
 Pump and Compressor Hydraulics based on plot plan 
 PSV, vendor PSV and PVSV hydraulics based on plot plan 
 Line Sizing Summary 
 System & Tank Transient Analysis 
 Instrument Sizing Calculations 
 SP Item Preliminary Sizing Calc Sheets 
RFQ Data Sheets issued to mechanical from process 
 design basis for future connections 
 MSDS documents 
 Line List (issued with  P&IDs) 
 Control Philosophies 
 Shutdown Keys 
 Tie‐in List 
 Car Sealed Valves List 
 
Line List (Issued with IFH P&IDs) 
 
  ‐ Issued for Design (Used for Class III Estimate ‐ bids back from vendors/ PO's issued) 
 
 Simulation Stick File 
 PFD Stick File 
 Material Balances / Water Balances Stick File 
 Specifications Stick File 
 Material Diagram Stick File 
 Operating/Design Temperature/Pressure Diagram Stick File 
 Design Basis Stick File 
Tank Sizing Summary 
 Vessel Sizing Calculations 
 Chemical Injection Summary 
 Utilities Balances (FG, IA/UA, Steam, Vapour Recovery, Glycol) 
 Pump and Compressor Hydraulics based on preliminary/stress isometrics/piping study model 
 PSV, vendor PSV and PVSV based on preliminary/stress isometrics/piping study model with client sign‐
off 
 PSV Relief Summary with client sign‐off. 
 Line Sizing Summary ‐ based on pump/compressor/PSV hydraulic calcs or separate line sizing 
calculations. 
 System & Tank Transient Analysis 
 Instrument Sizing Calculations based on preliminary isometrics/piping study model with client sign‐off. 
 SP Item Preliminary Sizing Calc Sheets 
RFP Data Sheets issued to mechanical from process 
RFQ SP Item Data Sheets issued to mechanical from process 
RFP Instrument Data Sheets issued to instrumentation from process 
 design basis for future connections 
 MSDS documents collected with corrosion/material considerations. 
 Line List (issued with  P&IDs) 
 Control Philosophies 
 Shutdown Keys 
10% study model review & comments 
 Operating Manual 
 
 
 
Simulation Stick File Updated 
 PFD Stick File Updated 
 Material Balances / Water Balances Stick File Updated 
 Specifications Stick File Updated 
 Material Diagram Stick File Updated 
 Operating/Design Temperature/Pressure Diagram Stick File Updated 
 Design Basis Stick File Updated 
RFP Data Sheets issued to mechanical from process ‐ keep copy (scan) sent to mechanical in Process Refs 
folder as basis of P&IDs. 
RFP Instrument Data Sheets issued to instrumentation from process ‐ keep copy (hard copy in a binder) 
by tag# sent to mechanical in Process Refs folder as basis of P&IDs (scan whole thing when done). 
RFQ SP Item Data Sheets issued to mechanical from process ‐ keep copy (scan) sent to mechanical in 
Process Refs folder as basis of P&IDs. 
 design basis for future connections 
 MSDS documents collected with corrosion/material considerations. 
 Line List (issued with  P&IDs) 
 Control Philosophies & SDK/Control Philosophy Review comments incorporated ‐ stored in a section of 
the control philosophy/SDK binder/folder. 
 Shutdown Key & SDK/Control Philosophy Review Meeting comments incorporated ‐ stored in a section 
of the control philosophy/SDK binder/folder. 
 Tie‐in List 
Issued for Demolition Drawings issued. 
 Tie‐in P&IDs issued prior to  issue. 
 Car Sealed Valves List 
30% model review comments 
 Operating Manual 
 
 Calculations to complete and sign by checker 
 
Keep Calculation Log ‐ contains file number/location, calc. number, revision and revision date, status (ie. 
"In progress (initials of responsibility)" or "With checking (initials)"), due date (matches deliverables list). 
 
 Tank Sizing Summary complete and signed as checked 
 Vessel Sizing Calculations complete and signed as checked 
 Chemical Injection Summary complete and signed as checked 
 Utilities Balances (FG, IA/UA, Steam, Vapour Recovery, Glycol) complete and signed as checked 
 Pump and Compressor Hydraulics based on final isometrics/piping model, pump sales or test curve 
complete and signed as checked 
 PSV, vendor PSV and PVSV based on final isometrics/piping model and vendor informaiton/drawings 
with client sign‐off 
 PSV Relief Summary with client sign‐off. 
 Line Sizing Summary ‐ based on pump/compressor/PSV hydraulic calcs or separate line sizing 
calculations complete and signed as checked. 
 System & Tank Transient Analysis complete and signed as checked 
 Instrument Sizing Calculations based on final isometrics/piping model; complete and signed as checked. 
 SP Item Final Sizing Calc Sheets complete and signed as checked 
 
 Re‐ ‐ Re‐Issued For Construction (Post Construction / Commissioning) 
 
 Operating Manual 
As‐Built Data Sheets (Equipment, Packages, Instrumentation, SP‐Items) signed by process and sent to 
mechanical/instrumentation. 
Data Books (Equipment, Packages, Instrumentation, SP‐Items) signed‐off by process. 
Re‐Issue all other documents, calculations, etc. that have changed 
 