Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ASME Section I with ASME B31.

Course Description: This seminar is a basic introductory


overview of the Section I Power Boiler Code and related
requirements of ASME B31.1 Power Piping. It focuses on the
ASME Certificate Holder engaged in welded construction, and
Repair Organizations working on ASME Code Power Boilers
under the National Board Inspection Code (NBIC).

The course describes the formatting ASME B31.1 – Power Piping


and structure of Section I, its scope −−Code Jurisdictional Boundaries
and its implementation in a Code −−BEP – Boiler External Piping
HSB is part of Munich Re Power Boiler fabrication program. ··Steam Piping
··Feedwater Piping
HSB is a leading specialty The ASME B31.1 segment focuses on −−Receiving Inspections
insurer providing equipment Boiler External Piping (BEP) −−Identification and Marking
breakdown, other specialty construction details, including weld ··Coded Markings
coverages, inspection services joint preparation and alignment, tack ··Subdivided Materials
and engineering-based risk welds, required weld sizing, welding −−Documentation Requirements
management that set the standard qualification requirements, final weld ··Test Reports
for excellence worldwide. acceptance criteria, preheat ··Certificates of Compliance
We anticipate risks and provide recommendations, postweld heat ··Partial Data Reports
forward-thinking solutions. treatment (PWHT) requirements and −−Material Recertification (PG-10)
exemptions, NDE requirements, −−Standard Pressure Parts
www.munichre.com/HSB pressure testing, Section I Code −−Authorized Inspector Involvement
stamping requirements and Data
Report preparation. Fabrication Requirements
−−Cutting Plates and Other Stock
Topics Covered −−Joint Preparation
··Edge Alignment
Overview of ASME Section I ··Dissimilar Thickness
··Tack Welds
Organization and Formatting ··Joint Cleaning
of Section I
−−Scope of Section I Welded Fabrication Requirements
−−Pressure and Temperature Scope −− Acceptable Welding Processes
−−Scope and Exemptions −−Procedure and Performance
−−Effective Code of Construction Qualifications
−−Boiler Type ··Blowoff Piping
−−Boiler Service ··Miscellaneous Piping
−−Boiler Sizes −− NBEP – Non-Boiler External Piping

Other Section I Components Design Requirements


−−Feedwater Heaters −−Basic Design Philosophy
−−Economizers −−Design Loads
−−Superheaters −−Determining Design Parameters
−−Water Columns
−−Unfired Steam Boilers
Hartford Steam Boiler Page 2/2
ASME Section I with ASME B31.1

Material Requirements −−End Preparations −−Weld Reinforcement


−−Pressure Retaining −−Cleaning −−Longitudinal Butt Welds
··Water Wetted −−Alignment −−Performance Qualification
··Steam Touched −−Socket Spacing and Dimensions ··Previous Qualification
··Water Level Indicators and Piping −−Tack Welds ··Collective Qualification
−−Non-pressure Retaining −−Joint Preparation
−−Heat Treat of Austenitic Stainless −−Final Welding Inspection Criteria Welding Preheat
Steels −−Postweld Heat Treatment
−−Creep Stress Enhanced Ferritic ··Exemptions Post Heat Treatment
Steels ··Time at Temperature
−−Joint Stress Reduction Factors ·· Heating and Cooling Rates NDE Requirements
−−Acceptability ··Thermocouple Placement −−Examination Methods
−−Material Metal Selection −− NDE Requirements −−Personnel Qualifications
−−Filler Metal Section ··Examination Methods
−−Purchase Orders ··Acceptance Criteria Pressure Testing
··Personnel Qualifications −−Test Pressure and Temperature
Overview of ASME B31.1 ··Sequencing of NDE −−Temporary Supports
−−Defect Repairs −−Overpressure Protection
Structure and Organization of B31.1 −−Welded Attachments −−Surface Exposure
−−Scope and Definitions −−Inspection Openings −−BEP vs. NBEP
−−Scope Exemptions −−Pneumatic
−−Section I Referenced Edition Pressure Testing
−−Test Pressure Determination Code Stamping for BEP
Materials −−Test Application
−−Acceptable Materials Manufacturer’s Data Reports
−−Allowable Stresses Code Stamping for BEP
−−BEP Restrictions −−Location −−Preparation and Certification
−−Components −−Required Information −−Distribution
−−Record Retention
Welding Manufacturer’s Data Reports
−−Procedure (WPS) Qualification −−Preparation and Certification
−−WPS Qualification by Others −−Distribution and Record Retention
−−Filler Metal Selection −−Girth Butt Welds
−−Backing Rings

For more information contact:

+1-860-722-5767 or
Email: GetInfo@hsb.com

© 2017 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

NOT IF, BUT HOW HSB-166 (New 12/16)

You might also like