Professional Documents
Culture Documents
8D Reort Format
8D Reort Format
NO :
CORRECTIVE & PREVENTIVE ACTION
REV. NO :
REPORT
DATE(Rev.) :
8 D No. Issued By Complaint For Sample Received
Supplier Complaint Date Lot Size
Part Name : SRV Rejection Date
Part Number : LINE Rejection M.Doc No.
D-1 C. Team
Name Department Designation Contact No.
D-2 PROBLEM DEFINITION (Attach Photographic details of failure, Attach Trend data, Pareto analysis, Warranty etc) Photo / Sketch ( If Possible)
D-3 CONTAINMENT ACTION / SHORT TERM ACTION (Within 1 day after receiving part/photos)
Actual Implementation
S. No. Action (s) Responsibility Target Date
D.4-ROOT CAUSE ANALYSIS - WHY ~ WHY .. ANALYSIS (Ishikawa diagram-Cause & Effect) within 2 Days after Containment Action
Man MACHINE
Problem :-
Material Method
Occurrence
Flow Out
D-5 CORRECTIVE ACTIONS / LONG TERM ACTION (Attach Photographs of actions taken)
S No. Root Cause Identified Corrective Action To be Implemented Responsibility Target Date Impl. On Remarks
D-7A Action Taken to Prevent Reoccurance & Horizontal Deployment (If Applicable)
3 Fixture Modification
4 Any other Engineering Change
AttachEvidence/List if any
7B Standardization of Corrective and preventive Actions Implemented
S. No. QMS Document P if Yes Responsible Planned Date Actual Date Status
1 Control Plan
2 Process check sheet
3 Process Flow Diagram
4 DFMEA/PFMEA/PPAP
Sign
Date
Name
Designation
Lot Date
Lot Status
Sign
Date
Name