This document is a checklist for inspecting the mechanical, plumbing, and firefighting systems in a hospital room. It lists 40 items to inspect including the installation of air conditioning units, ductwork, piping for water, drainage, medical gases, and sprinklers. The checklist tracks the status of each item as done, pending, or with an expected completion date. It also records the room number, name, and date of inspection.
This document is a checklist for inspecting the mechanical, plumbing, and firefighting systems in a hospital room. It lists 40 items to inspect including the installation of air conditioning units, ductwork, piping for water, drainage, medical gases, and sprinklers. The checklist tracks the status of each item as done, pending, or with an expected completion date. It also records the room number, name, and date of inspection.
This document is a checklist for inspecting the mechanical, plumbing, and firefighting systems in a hospital room. It lists 40 items to inspect including the installation of air conditioning units, ductwork, piping for water, drainage, medical gases, and sprinklers. The checklist tracks the status of each item as done, pending, or with an expected completion date. It also records the room number, name, and date of inspection.
This document is a checklist for inspecting the mechanical, plumbing, and firefighting systems in a hospital room. It lists 40 items to inspect including the installation of air conditioning units, ductwork, piping for water, drainage, medical gases, and sprinklers. The checklist tracks the status of each item as done, pending, or with an expected completion date. It also records the room number, name, and date of inspection.
ROOM NO: ____, _____, _____, _____. Space name.___________________. Date: _____________
Item Item Description Done Pending Expected Other
No. Completion 1. FCU installation with valve kit 2. Chilled water pipe with insulation 3. Condensate pipe with insulation 4. Chilled water pipe pressure test 5. Condensate pipe slope test 6. Supply and return duct with insulation 7. FAD with insulation 8. Plenum boxes with flexible ducts 9. Supply and return grille as per ID HVAC plans 10. VD in SAD, RAD & EAD 11. VAV in supply and return duct 12. Duct and pipe support 13. Toilet exhaust duct with fire damper 14. Duct sleeves crosses fire rated valve with fire rated sealant 15. Filter access 16. Duct & pipe clashes 17. Smoke and make up air duct 18. MFSD 19. Cold and hot water pipe installation 20. Cold and hot water pipe pressure test 21. Maintenance valves, thermal balancing valves and WHA 22. Hot water pipe with insulation 23. Pipe supports 24. Vent pipe connection to plumbing fixture 25. Vent pipe connection to riser Plumbing 26. Pipe sleeves, Sealed with fire rated sealant 27. Gravity test report for drainage pipes 28. Drainage pipe installation at high level if exist 29. Storm water pipe (slope and supports) if exist 30. Dialysis chair water piping 31. Dialysis chair drainage piping 32. Sprinkler pipe drop in its original location and numbers as per ID 33. Pipe supports properly installed Fire Final paint on pipes done 34. Fighting Fire pipe clashes with other services 35. Fire Hose Cabinet 36. Zone Control valve
ROOM CHECKLIST – Mechanical Plumbing & FF
37. Medical gas piping pressure test 38. Medical gas outlets, medical air, Medical vacuum and oxygen 39. Gas Medical gas piping supports and Piping connected with AVSU 40. Check pipe clashes with other services