SOP Aviation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 45

,p-ih-,fo;’ku dsoy bZ/ku ls dgh c<+dj

fgUnqLrku iVªks- dkW- fy- dh ,d O;olkfgd bdkbZ,p- ih- ,fo;’ku

cnyrs
lius

dqN ,sls gSa tks liuksa esa] rFkk dqN ,sls gS tks okLrfodrk eaas thrs gSa ekud izpkyu izfØ;k,a & foekuu ,l ch ;w
ysfdu ge ;gka oks gSa tks liuksa dks okLofodrk esa cnyrs gSa STANDARD OPERATING PROCEDURES
Hindustan Petroleum Corporation Limited
Aviation SBU, Hindustan Bhawan, 8, S.V Marg, Mumbai - 400001 Hindustan Petroleum Corporation Limited
dke;kch dk vkdyu mldh izkfIr ls ugha
cfYd geus ihNs D;k NksMk gS] ls gksrk gS

03
Table of Contents fo”k; lwph

01. Pipeline Receipts at Airports 01 ,vjiksVZ ij ikbiykbu ls izkfIr izfØ;k


02. Tank Truck Receipts at Airports 02 ,vjiksVZ ij Vsad Vªd ls izkfIr;ka
03. Tank Truck Receipt at On wheel ASF's 03 vkWu Oghy dk;ZLFkyks ij Vsad Vªd izkfIr
04. Product Transfer from Refueller to Refueller 04 fjQ;wyj ls fjQ;wyj esa mRikn dk LFkkukarj.k
05. Quality Control Checks on Storage Tanks 05 HkaMkj.k Vsadksa dh xq.koRrk fu;a=.k tkap
05.1 Daily Morning Fast Flush check 05.1 HkaMkj.k Vsad nSfud QkLV Qy’k izfØ;k
05.2 Floating Suction Check 05.2 QyksfVax lD’ku tkap
05.3 Tank Cleaning Procedure 05.3 HkaMkj.k Vsad ds lQkbZ dh izfØ;k
06 Routine checks on Refuelling Equipments 06 eksckby fjQ;wfyax midj.kksa dh nSfud tkap
07 Refueller Topping up procedure 07 fjQ;wfyax VkWfiax vi izfØ;k
08 ForTnightly Flushing of Equipment 08 fjQ;wfyax midj.k dh ikf{kd Qyf’kax izfØ;k
09 Earthing and Bonding Reel checks on Equipments 09 midj.ksa dh vfFkZax vkSj ckafMax jhy tkap
10 Procedure for Approaching the Aircraft & Positioning Refuelling vehicle. 10 foeku rd igWqp vkSj fjQ;wfyax okgu dks [kMk djus dh izfØ;k
11 Underwing Refuelling with Hydrant Dispenser 11 fjQ;wfyax ls vaMjfoax fjQ;wfyax
12 Underwing Refuelling with Hydrant Refueller 12 fj¶;wyj ls vaMjfoax fj¶;wfyax
13 Overwing Refuelling 13 vksoj foax Q;wfyax
14 Defuelling Procedure 14 foeku dh fMQ;wfyax izfØ;k
15 VVIP Refuelling Procedure 15 vfr fof’k”V egRoiw.kZ O;fDr;ksa ds foeku dh fjQ;wfyax izfØ;k
16 Copper Corrosion & Silver Corrosion Test 16 rkez tax rFkk jtr tax dh tkWp izfØ;k
17 Conductivity Measure Procedure 17 lqpkydrk ekius dh izfØ;k
18 Millipore Test Procedure 18 feyhiksj tkap izfØ;k
19 Microbiological Sampling Procedure 19 lw{e tSfod tkWp dh uewuk p;u izfØ;k

04 05
1. Pipeline Receipts at airport 1. ,vjiksVZ ij ikbiykbu ls izkfIr izfØ;k

Pipeline receipt at airports shall be through segregated and dedicated ,vjiksVZ ij ikbiykbu ls izkfIr dsoy vyx vkSj lefiZr ikbiykbu ls gh gksxhA
pipeline only.
ikbiykbu ls LFkkukarj.k izkjaHk djus ds igys lqfuf’pr djsa fd vU; lHkh ikbiykbuksa ls vkiwfrZ
Before starting pipeline transfer ensure that complete isolation of the supply fLFkfr HkaMkj.k Vsad iwjh rjg vyx gksA
location storage tank from all other pipelines.

Prior to receipt of product, a bottom sample of the designated receiving tank(s)


mRikn izkIr djus ds igys inukfer izkfIr Vsad ¼dksa½ ds isanh dk uewuk VsLV ^,Q* ds v/khu djsaA
shall be subjected to Test “F”.
lqfuf’pr djsa fd ikuh fudkyus okys okYoksa ds lkFk Vsad ds fMLpktZ okYo can gksa vkSj lhy fd,
See if tank discharge valves are closed & sealed with water draws off valves. gq,A

Record the Quality Control Checks on storage tanks (Test F) in QF-302 (Static D;w ,Q&302 ¼LFkSfrd midj.k xq.koRrk fujh{k.k ykWx½ esa HkaMkj.k Vsadksa dh ¼VsLV ,Q½ xq.koRrk
equipment Quality Inspection Log). fu;a=.k tkap fjdkMZ djsaA
Start the transfer only after receipt of a Full Specification/Batch Formation Test ikbiykbu LFkkukarj.k ls iw.kZ fof’k”V cSp QkesZ’ku VsLV fjiksVZ feyus ds ckn gh djsaA
report for the subject batch.
lacaf/kr vko’;d okYoksa dks izpkfyr djds lacaf/kr izkfIr Vsad esa LVkWd dk iRkk yxk,aA VSad ds
Ascertain stock in receiving tank is lined up for receipt by operating all necessary
valves. Lining up of tank is opening receipt line of receiving tank, closing all outlet
ykbu&vi ds fups Vsad dk izkfIr ykbu dks [kkys lHkh izkfIr okYoksa dks can djsa vkSj izkfIr izokg
lines of receiving tank & isolating all other tanks in location from receipt flowline. J`a[kyk ls yksds’ku esa vU; lHkh VSadksa dks vyx djukA

Advise shipping location to start transfer after ensuring lining up of the tank. Vsad dk ykbfuax&vi lqfu’pr djus ds ckn LFkkukarj.k ‘kq# djus ds fy, f’kfiax yksds’ku dks
lwfpr djsaA
During receipt through dedicated pipeline, after displacement of the product
already in the line and an additional quantity of 50 KL, the product sample lefiZr ikbiyku ds tfj, izkfIr ds nkSjku ykbu esa igys ls jgs mRikn ds foLFkkiu ds ckn rFkk 50
ex filters /strainers/Line (bottom) shall be checked for Test ‘H’ every 10 fdyh- ls vfrfjDr ek=k ds ckn vk/ks ?kaVs rd gj nl feuV ij VsLV ^,p* ds fy, mRikn uewuk
minutes for the first half an hour and compare the density with the parent fQYVj@LVsªulZ@ykbu ¼isanh½ esa tkap dh tk, vkSj ewy Vsad ds ?kuRo ls mlds ?kuRo dh rqyuk dh
tank density. Thereafter, product shall be checked for Test ‘H’ every one hour. tk,A rRi’pkr gj ,d ?kaVs ij VsLV ^,p* ds fy, tkap djsaA
If product is from separate tanks with different densities, frequency of checking
;fn mRikn fHkUu ?kuRo ds vyx Vsadksa ls gks rks igys vk/ks ?kaVs esa gj nl feuV ij tkap dh ckjackjrk
every 10 minutes for first half an hour shall be done after receipt of interface of
tanks & an additional quantity of about 50 KL. Vsadksa ds varjkQyd dh izkfIr vkSj yxHkx 50 fdyks yhVj dh vfrfjDr ek=k ds ckn tkap djsaA

If density variation is more than ± 2.5 Kg/m3, pumping should be stopped ;fn ?kuRo esa ifjorZu + 2-5 fdyks@ehVj3 ls vf/kd gks rks rqjar iafiax can dj nsa vkSj dkj.kksa dk irk
immediately & investigate reasons. Pumping shall be recommenced only after yxk,aA vko’;d mipkjkRed dk;Zokgh ds ckn gh iafiax fQj ls ‘kq# djsaA
necessary corrective action is taken.

06 07
If the product in the dedicated line is dormant for more than one month, ;fn lefiZr ykbu esa mRikn ,d eghus ls iM+k gks rks LFkkukarj.k ‘kq# djus ds igys VsLV ^,p* ds
Copper strip corrosion Test shall be carried out on the line sample in addition to vykok ykbu ds uewus dk dkWij] fLVªi djkstu VsLV Hkh djsaA
Test “H” before commencement of transfer.
;fn ;g rhu eghuksa ls vf/kd le; ls iM+k gks rks ykbu dk mRikn djsa vkSj mi;ksx ds igys cSp
If it is dormant for more than 3 months, the line content shall be segregated and QkesZ’ku VsLV ¼VsLV ^ch*½ fd;k tk,A
batch formation test (Test “B”) shall be carried out before use.

Pressure differential across filters shall be checked as an when the product is tc dHkh mRikn izkIr fd;k tk, rks izkfIr fQYVjksa ds ncko varj dh tkap djsa vkSj mldks fjdkMZ djsaA
received.
mRikn izkfIr dh nj dk irk yxk;k tk, vkSj LFkkukarj.k dh vof/k dk vuqeku yxk;k tk,A
The rate of product receipt is ascertained and the duration of the transfer
estimated. The shipping location is accordingly advised of the time of stoppage rnuqlkj f’kfiax yksds’ku dks LFkkukarj.k can djus ds le; ds ckjs esa lwfpr djsaA
of the transfer.
LFkkukarj.k ds jksdus dh laiqf”V gksus vkSj Vsad esa izkIr LVkWd dk irk yxus ij f’kfiax yksds’ku }kjk
The stoppage of the transfer is confirmed & the stock received in the tank fMfyoj dh xbZ ek=k dh rqyuk djsaA
ascertained & compared with the quantity delivered by the shipping location.
,fo,’ku DokfyVh daVªksy ,aM ,’;ksajsal eSU;qvy ds [kaM 3-35 esa ;Fkk of.kZr Vsad ds lek;kstu ds
After the settling of the tank as detailed in the Section 3.3.5 of Aviation
Quality Control & Assurance Manual, the bottom sample shall be taken &
ckn isanh dk uewuk fy;k tk,] vkSj VsLV & ,Q ds fy, tkWp djsaA
subjected to Visual Check Test ‘F’.
lHkh xq.koRrk fu;a=.k tkaps D;w ,Q%302 LFkSfrd midj.k xq.koRrk fujh{k.k ykWx esa fjdkMZ djsaA
All the Quality control Checks are to be recorded in the QF-302 Static Equipment
Quality Inspection Log. ,vjiksVZ HkaMkj.k Vsad esa mRikn izkIr gksus ds ckn Vsad dk D;w ,Q&301 cSp daVªksy fjdkMZ mi;qDr
rjg ls viMsV djsaA
After receipt of product into the Airport Storage tank, QF-301 Batch Control
Record of Tank shall be suitably updated.

08 09
2. Tank Truck Receipt at Airports 2. ,vjiksVZ ij Vsad Vªd ls izkfIr dh izfØ;k

The tank trucks details are matched with the documents/QRC that come xarO;@mRikn ds xszM vkfn dh mi;qDrrk ds fy, Vsad Vªd dk fooj.k nLrkostksa@D;w vkj lh ls feyk;k
along with Tank trucks for correctness of destination / Product Grade etc. tk, tks Vsad Vªd ds lkFk vkrs gksaA
Tank trucks shall not be accepted for unloading in absence of basis documents t#jh nLrkostksa tSls Vh vks , vkSj DokfyVh fjyht lfVZfQdsV ¼D; vkj lh½ ds u jgus dh fLFkfr esa
like TOA & Quality Release Certificate (QRC). vuyksfMax gsrq VSad Vªdksa dks Lohdkj u djsaA
The tank truck is checked for safety fittings like flame arrester, fire extinguisher,
vuyksfMax {ks= esa vkus dh vuqefr nsus ds iwoZ Vsad Vªd dh lqj{kk fQfVax tSls ¶yse vjsLVj]
etc. before being allowed into the unloading area.
vfXu’keu vkfn dh tkap djsaA
The tank truck on arrival shall be checked to verify that the seals/locks are
intact. If numbered seals are used, the numbers should be verified with the Vsad Vªdksa ds vkus ij lhy@ykWd ds nqjLr jgus ds ckjs esa mudh tkap djsaA ;fn la[;k okyh lhy dk
dispatch documents. mi;ksx fd;k x;k rks izs”k.k nLrkostksa ls la[;k dh tkap dh tk,A

It is ensured that a copy of the test report of the batch number referred to on the ;g lqfuf’pr fd;k tk, fd Vh vks , esa lanfHkZr cSp la[;k dh VsLV fjiksVZ dh izfr , ,l ,Q esa
TOA is available at the ASF. miyC/k gksA
The tank truck is properly positioned on the unloading point, handbrake VSad Vªd dks vuyksfMax IokbaV ij Bhd rjg ls [kM+k djsa] gkFk dk cszd lfØ; j[kk tk,] Oghy pkWd
activated, wheel chocks applied, proper earthing/ bonding done and a fire iz;qDr gksa] mi;qZDr vfFkZax@ ckafMax dh xbZ gks vkSj vkl&ikl vfXu’keu rS;kj j[kk x;k gksA
extinguisher positioned in the vicinity.

The stock in the T/T shall be ascertained as per the dips of the Tank Trucks. Vsad Vªdksa dh fMi ds vuqlkj Vh@Vh esa LVkWd dk irk yxk;k tk,A

In case of any shortage in dip shall be ascertained, recorded on the invoice fMi esa fdlh izdkj dh deh ds ekeys esa bldk irk yxk;k tk, vkSj chtd esa fjdkMZ fd;k tk,A
& with signature of the TT crew obtained in original on the invoice. chtd ij Vh Vh ds dehZ ny dk gLrk{kj fy;k tk,A

The bottom sample of each compartment is subjected to Visual Check Test ‘H’ VSad Vªdksa ds mRikn ds fLFkj gksu ds 10 feuV ckn n`’; tkap VsLV ^,p* gj daikVZesaV ds isanh ds uequs
after product in tank truck has been allowed to settle for 10 minutes.
esa fd;k tk,A
The conductivity of product in each compartment is also noted.
gj daikVZesaV esa mRikn dh lapkydrk Hkh uksV dh tk,A
The results of checks are to be recorded in QF-309 (Quality Release Certificate).

The density at 15°C for each shall be within 2.5 Kg/M3 of the density at tkap ds ifj.kke D;w ,Q&309 ¼DokfyVh fjyht lfVZfQdsV½ esa fjdkMZ djsaA
15 °C shown on the Test Report.
izR;sd daikVZesaV ds fy, 15 fMxzh lsaVhxzsM ?kuRo rFkk VsLV fjiksVZ ij n’kkZ;h xbZ 15 fMxzh lsaVhxzsMs
3
?kuRo dk varj 2.5 fdyks@eh ls T;knk u gksA

10 11
The stock in the receiving tank is ascertained and the tank lined izkfIr Vsad esa LVkWd dk irk yxk;k tk, vkSj lHkh vko’;d okYoksa dks izpkfyr djds Vsad dks izkfIr
up for receipt by operating all the necessary valves. ds fy, rS;kj fd;k tk,A
Tank Truck lining up means opening the receipt line of the receiving tank, Vsad Vªdksa dh ykbfuax &vi dk vFkZ gS izkfIr Vsad ds izkfIr ykbu dks [kksyuk] izkfIr Vsad ds lHkh
closing all outlet lines of the receiving tank and isolating all other tanks in vkmVysV ykbuksa dks can djuk vkSj VSad Vªdksa vuyksfMax flLVe ls yksds’ku esa lHkh vU; Vsadksa dks
the location from the tank truck unloading system. The quality Control Checks
on the storage Tank shall be done as per Test-F.
vyx djukA VsLV&,Q ds vuqlkj HkaMkj.k Vsad esa xq.koRrk fu;a=.k dh tkap dh tk,xhA

While in operation, a sample from the receipt filter shall be drawn and checked izpkyu ds nkSjku izkfIr fQYVj ls ,d uewuk ysa vkSj VsLV ^,Q* ds tkap djsa ,oa ncko varj fjdkMZ
for Test “F” and Differential Pressure to be recorded. djsaA

When unloading is completed, it is ensured that the tank truck is totally empty & tc vuyksfMax iwjh gks tk, rks] ;g lqfuf’pr fd;k tk, fd Vsad Vªd iwjh rjg [kkyh gks vkSj vfFkZax @
the discharge hose connections along-with the earthing / bonding disconnected. ckafMax ds lkFk fMLpktZ gkst dusD’ku fMLdusDV dj fn;k x;s gksA
The tank truck is then sealed/locked and released. rRi’pkr Vsad Vªd lhy fd;k tk, @ ykWd fd;k tk, vkSj fjyht dj fn;k tk,A
After the settling of the storage tank as detailed in the Section 3.3.5 of the tSlk fd ,fo,’ku DokfyVh daVªksy vkSj ,’;ksjsal eSU;qvy ds [kaM 3-3-5 esa mYys[k fd;k x;k gS
Aviation Quality Control and Assurance Manual, the bottom sample shall be
taken and subjected to Visual Check Test ‘F’. The Test may be done at the shift end
HkaMkj.k VSad ds fLFkj gksu ds ckn isanh dk uewuk fy;k tk, vkSj n`’; tkap VsLV ^,Q* fd;k tk,A tc
if no loading operation from tank is scheduled in the shift. f’k¶V esa Vsad ls fdlh izdkj ds yksfMax izpkyu dk dk;ZØe u gks rks f’k¶V ds var esa tkap dh tk,A

These checks are recorded in QF-302 ( Static Equipment Quality Inspection Log). ;s tkapsa D;w ,Q&302 esa fjdkMZ djsa ¼LFkSfrd midj.k xq.koRrk fujh{k.k ykWx½

After receipt of product into the Airport Storage tank, QF-301 (Batch Control ,vjiksVZ HkaMkj.k Vsad esa mRikn izkIr gksu ds ckn Vsad dk D;w ,Q&301 ¼cSp daVªksy fjdkMZ½ mi;qDr
Record) of Tank shall be suitably updated. rjhds ls viMsV djsaA

12 13
3. Tank Truck Receipts at on wheel locations 3. vkWu Oghy dk;ZLFkyks ij Vsad Vªd izkfIr

REFUELER TANK REFUELER TANK

V0 NOZZLES V0 V0 NOZZLES V0

BY VALVE BY VALVE BY VALVE BY VALVE

TOP UP LINE TOP UP LINE


V0 NOZZLES V0 NOZZLES

BY VALVE BY VALVE BY VALVE BY VALVE

V1 V1
BY PASS BY PASS
LINE STRAINER LINE STRAINER

V0 POW FLOW METER V0 POW FLOW METER


FILTER FM FILTER FM

4 WAY VALVE 4 WAY VALVE


TANK TRUCK CONNECTION TANK TRUCK CONNECTION
FOR PRODUCT DECANTATION FOR PRODUCT DECANTATION

Close Refueller Bottom loading valve V1 fj¶;wyj isanh dk yksfMax okYo V1 can djsaA
Connect the Tank Truck decanting hose to the TT adaptor of refueller near Pump Vsad Vªd vkSj fj¶;wyj ds lHkh xq.koRrk izfØ;kvksa dks iwjk djus ds ckn iai lD’ku ds djhc fj¶;wyj
suction connection after completing all quality procedures of Tank Truck & ds Vh Vh ,MkIVj ls VSad Vªd fMdSafVax gksl dusDV djsaA
Refueller.

Ensure that the In-Line strainer is attached between tank truck adapter and
lqfuf’pr djsa fd VSad Vªd ,MkIVj vkSj fj¶;wyj iai lD’ku ,MkIVj ds chp bu&ykbu LVªªsuj yxk gksA
refueller pump suction adapter.
fj¶;wyj esa okYo V2 vkSj lacaf/kr okYoksa dks [kksy nsa ¼;Fkk iz;ksT; V3 c ;k V4½A
Open Valve V2 & respective Valves in the Refueller ( V3 or V4 as applicable)
VkWi&vi ykbu ls vkj ,p ,l vkSj @ ;k ,y ,p ,l gksl tksM+ nsaA
Connect the RHS and/or LHS hose to the top up line.
okYo V5 vkSj V6 [kksysa ¼ftlds lkFk jhy gksl tqM+k gks½A
Open Valves V5 & V6 (To which Reel hose is connected)
fj¶;wyj dks izkjaHk djsa vkSj ih Vh vks yxk,aA
Start Refueller and engage PTO.
vuyksfMax ‘kq# djus ds fy, eksckby HkaMkj.k Vsad dh MsMeSu fLop nck,a] ftldk ¶yks ehVj jhfMax
The deadman switch of mobile storage tank pressed to commence the
unloading., which can be ascertained by the flow meter reading. The product
ls irk yxk;k tk ldrk gSA mRikn ,d ekbØku fQYVj ls xqtjrk gSA
passes thru a 1 micron filter.

14 15
Refueller pump suction will suck product from tank truck and thru pump delivery fj¶;wyj iai lD’ku Vsad Vªd LVªªsuj ls gksrs gq, mRikn [khapsxk vkSj iai fMfyojh ykbu] fQYVj]
line , filter , flow meter and thru refueller bottom loading valve product will be ¶yks ehVj ,oa fj¶;wyj ckWVe yksfMax okYo ds ek/;e ls fj¶;wyj VSa eSa mRikn izkIr gksxkA
received in refueller tank.
pawfd fj¶;wyj ckWVe yksfMax okYo ds ek/;e ls mRikn izkIr gksrk gS] blfy, vksoj ¶yks ls lqj{kk
As the product received thru refueller bottom loading valve, refueller jet iznku djus ds fy, fj¶;wyj tsV lsalj ls¶Vh midj.k Hkh dk;Z djsaxkA
sensor safety device will also work to provide protection against overflow.

When the unloading is completed, it is ensured that the tank truck is totally tc vuyksfMax iwjh gks tk,] rc lqfuf’pr fd;k tk, fd Vsad Vªd fcYdqy [kkyh gks vkSj vfFkZax
empty and the discharge hose connections along-with the earthing/bonding ckafMax lfgr fMLpktZ gksl dusD’ku fMLdusDV dj fn, x, gksaA eksckby HkaMkj.k dh Dyksftax fMi
disconnected. The closing dip of mobile storage is taken. yh tk,A

Circulate at least 5000 liters of product in the refueller and then keep the fj¶;wyj dks de ls de 5000 yhVj mRikn ls ljD;wysV djsa] fQj mlss ikfdZax fLFkfr esa j[ksaA
Refueller in the parking position.
lqfuf’pr djsa fd yksds’ku ds DokfyVh daVªksy tkap lwph esa ykbu LVªsuj tkap Hkh ‘kkfey dh xbZ gksA
Ensure that the line strainer check is also included in the QC check list of Location.
tSlk fd ,fo,’ku daVªksy ,aM ,’;ksajal eSU;qvy ds [kaM 3-3-5 esa mYys[k fd;k x;k gS] eksckby
After the settling of the Mobile storage tank as detailed in the Section of the HkaMkj.k Vsad ds fLFkj gksus ds ckn isanh dk uewuk fy;k tk, vkSj n`’; tkap VsLV ^,p* dh tk,
Aviation Quality Control and Assurance Manual, the bottom sample shall
be taken and subjected to Visual Check Test ‘H’ (Section 5.5.8 of the Aviation
¼,fo,’ku DokfyVh daVªksy ,aM ,’;ksjsal eSU;qvy dk [kaM 5-5-8½A ;s tkapsa LFkSfrd midj.k xq.koRrk
Quality Control & Assurance Manual). These checks are recorded in the Static fujh{k.k ykWx ¼D;w ,Q&301½ esa fjdkMZ dh tk,A
Equipment Quality Inspection Log (QF-301).

16 17
4. Product transfer from refueller to refueller at 4. vku Oghy , ,l ,Q esa fj¶;wyj ls fj¶;wyj esa mRikn dk LFkkukarj.k izfØ;k%
On- Wheel ASF’s

Refueller is to be positioned on the refueller loading point & wheel chocks placed fj¶;wyj yksfMax fcanq ij fj¶;wyj dks [kM+k fd;k tk, vkSj Oghy pkd yxk fn;k tk,aA ckafMax vkSj
in position. Bonding & earthing connections are to be made. The mobile storage vfFkZax dusD’ku fd;k tk,aA eksckby HkaMkj.k Vsad ds isanh ds uequksa dh tkap dh tk, vkSj DokfyVh
tank bottom sample to be checked & recorded in Quality Format QF-401. QkesZV D;w ,Q&401 esa fjdkMZ fd;k tk,aA
The refueller is then put in the “top up” mode by operating the refuel/top up” rRi’pkr fj¶;wy@VkWi vi daVªksy okYo dks izpkfyr djds fj¶;wyj dks ^VkWi vi* fLFkfr esa j[kk tk,A
control valve on the refueller to the “top up” position.

The Reel hose is hooked up to the loading adaptor & the loading line of the
fj¶;wyj ds jhy gksl] yksfMax ,MkIVj ls tksMs+ rFkk fj¶;wyj ds yksfMax ykbu okYoksa dks [kksysa
valves on refueller are opened.
;g lqfuf’pr djsa fd fMyhojh ykbu dk ¶yks ehVj ¼;fn miyC/k gks½ ‘kwU; ij fjlsV fd;k x;k gks]
Valve on mobile storage is then opened after ensuring that the delivery line flow eksckby HkaMkj.k dk ckWVe yksfMax okYo [kksy nsa rFkk fQYVj osly dk okYo [kqyk j[ksaA
meter (if available) is reset to zero & valve of 1micron filter vessel is kept open.
yksfMax izpkyu ‘kq# djus ds fy, eksckby HkaMkj.k fj¶;wyj dk ih Vh vks pkyw djsaA
Engage the PTO of the mobile storage refueller to start the loading Operation
LFkkukarj.k ‘kq# djus ds fy, eksckby fj¶;wyj dh MsMeSu fLop nck;sa rFkk mRikn ds izokg dk irk
Dead man switch of the mobile storage refueller to be pressed to commence the yxkus ds fy, ¶yks ehVj dh tkap djsaA
transfer. Check the flow meter to ascertain the flow of product.
izk;% gj fj¶;wfyax izpkyu ds ckn fj¶;wyjksa dks iw.kZ {kerk rd VkWi vi fd;k tkrk gSA ;g ;k rks
Usually refuellers are topped up to full capacity after each refueling operation, VkWi vi ¶yks ehVj ¼;fn miyC/k gks½ dks ns[kdj fd;k tkrk gS ;k Vsad esa miyC/k fQy ekdZ lsA
by referring to top-up flow meter (if provided), or fill mark provided in the tank.

In case the refueller is to be topped up to a specific level, this may be done using
;fn fj¶;wyj dks fdlh fof’k”V Lrj rd VkWi vi fd;k tkuk gks rks fMi jkM vkSj dSfyczs’ku pkVZ dk
a dip rod and calibration chart. However, it should be ensured that the refueller mi;ksx djds ,slk fd;k tk ldrk gSA gkykafd] ;g lqfuf’pr fd;k tk, fd fj¶;wyj VkWi vi f’k¶V
top up is physically verified from the tank manhole at least once a shift. esa de ls de ,d ckj fj¶;wyj VkWi vi Vsad ds esu gksy ls okLro esa lR;kfir fd;k x;k gksA

During top up, the line filter separator sump sample is subjected to Visual Check VkWi vi ds nkSjku ykbZu fQYVj lsijsVj lEi ds uewus dh n`’; tkap VsLV ^,Q* dh tk, ¼,fo,’ku
Test ‘F’ (Section 5.5.6 of the Aviation Quality Control & Assurance Manual). DokfyVh daVªksy ,aM ,’;ksajsal eSU;qvy dk [kaM 5-5-6½A
After a settling period of 10 minutes refueller tank bottom sample is checked for nl feuV ds fLFkj vof/k ds ckn fj¶;wyj Vsad ds isanh ds uewus dk ^VsLV ,Q* tkap dh tk, ¼,fo,’ku
“Test F” (Section 5.5.6 of the Aviation Quality Control and Assurance Manual). DokfyVh daVªksy ,aM ,’;ksjsal eSU;qvy dk [kaM 5-5-6½A
All the previously opened valves on the refueller & the loading point are closed fj¶;wyj vkSj yksfMax fcanw ij igys ds [kksys x, lHkh okYo can dj nsa vkSj ckafMax dusD’ku gVk nsaA
and the bonding connections removed. The dust caps are replaced on all the lHkh yksfMax ukWtyksa] fj¶;wyj ,MkIVjksa vkSj uewuk fcanqvksa ij MLV dSiksa dks can dj nsaA
loading nozzles, refueller adaptors & sample points.

The refueller is placed back at its parking place. fj¶;wyj dks blds ikfdZax LFky ij okil LFkkfir djsaA

18 19
5. Quality control checks on storage tanks 5. HkaMkj.k Vsadksa dh xq.koRrk fu;a=.k tkap izfØ;k

Status Signs: The inlet and outlet valves of each tank shall be labeled with fLFkfr dh igpku % izR;sd Vsad ds buysV vkSj vkmVysV okYoksa ij izR;sd VSad dh fLFkfr bafxr djrs
a signboard indicating the status of each tank (e.g. Receiving, Settling, gq, lkbucksMZ dk yscy yxk;k tk, ¼mnkgj.k ds fy, izkfIr] fLFkrjrk] laxjks/k ;k fjyht½A tc
Quarantined or Released). When the status of the valves changes, the signboard okYoksa dh fLFkfr cnys rks mDr cnyko dks izfrfcafcr djus ds fy, lkbucksMZ rqjar cny fn, tka,A
shall be changed immediately to reflect said changes.
;fn fjeksV daVªksy okYo iz;qDr fd, x, gksa] rks Vsad esa fu’kkuksa ds fy, daVªksy iSuy ij mlh rjg ds
If remote control valves are used, similar signs on a mimic panel may be
substituted for the signs at the tank shell.
fu’kku izfrLFkkfir fd, tk,aA

Stored product is subjected to daily morning quality control checks to prevent VSad dh isanh esa ikuh @ lSMhesaV ds teko dks jksdus ds fy, HkaMkj.k fd, x, mRikn dks nSfud izkr%
water/sediments accumulation at tank bottoms. The bottom samples of storage dkyhu xq.koRrk fu;a=.k tkap djasA HkaMkj.k VSadksa ds isanh ds uewus VsLV ^,Q* ds v/khu gksaxs vkSj D;w
tanks are subjected to Test ‘F’ and recorded in QF-302.-Static Equipment Quality ,Q&302 LFkSfrd midj.k xq.koRrk fujh{k.k ykWx esa fjdkMZ tk,aA
Inspection Log.
ikuh@lSMhesaV ds teko dks jksdus ds fy, Hkkjh cjlkr ds ckn Vsad dh isanh ls mRikn fuFkkjs tk,axs
To prevent water/sediment accumulation, product shall be drained from tank vkSj VsLV ^,Q* ds vuqlkj tkaps tk,axs rFkk D;w ,Q&302 esa fjdkMZ fd, tk,aA
bottom after heavy rains and checked as per Test ‘F’ and recorded in QF-302 .
eghus esa ,d ckj izR;sd HkaMkj.k Vsad ds isanh ds uewus dk dkWij fLVªi rFkk flYoj fLVªi ( IP:154/
Copper Strip Corrosion Test (as per IP:154/ ASTM D-130) and Silver Strip ASTM D-130) djkstu VsLV ¼vkbZ ih%227 ds vuqlkj½ fd;k tk,A bls D;w ,Q&305 vkSj D;w
Corrosion Test (as per IP:227) is carried out on the Bottom Sample of each
storage tank once a month. The same is recorded in QF-305 Copper/Silver
,Q&310 dkWij @ flYoj djkstu VsLV esa fjdkMZ fd;k tk,A
Corrosion Test Record and QF-310 Copper/Silver Corrosion Test Report.
;fn mRikn izkjafHkd izek.ku ds ckn 6 eghuksa ls vf/kd iqjkuk gks rks bls VsLV ^Mh* ds vuqlkj iqu%
If the product is more than six months old after the initial certification, it shall be izek.ku ds fy, VsLV fd;k tk, vkSj mlds ckn gj 3 eghus ij bldk fQj ls VsLV&Mh fd;k tk,A
tested for recertification as per Test ‘D’ & retested every three months thereafter.
VsLV fjiksVZ en dh rkjh[k mRikn ds izekf.kr/ iqu% izekf.kr ds fy, yh tk,sxhA tc dHkh dksbZ mRikn
The date of test report issue shall be taken as the date product certified/ fQj ls izekf.kr fd;k tkrk gS rks tkjh dh xbZ rnuq#i VsLV fjiksVZ esa iz;ksx’kkyk VsfLVax dk dkj.k
recertified. Whenever a product is recertified, the lab shall indicate, Reasons iqu% izek.ku ¼fjlkVZfQds’ku½ bafxr djsxhA
for testing - “Recertification” in the test report issued.
;fn izpkyuRed vko’;drkvksa dks iwjk djus ds fy, izek.ku ds 3 ls 6 eghuksa ds Hkhrj mRikn dk
If tank to tank transfer of product is done to meet operational exigencies, LFkkukarj.k VSad ls VSad esa gks rks VsLV ^ch* djus ds ckn gh mRikn fjyht fd;k tk,A tks mRikn iqu%
within 3 to 6 months of certification, the product shall be released only after
carrying out Test ‘B’. Product shall not be delivered from the storage tanks
izek.ku ds fy, fu;e mls Vsad fMfyoj ugha fd;k tk,xk] tc rd larks”ktud VsLV fjiksVZ miyC/k u
if it becomes due for recertification, until satisfactory test report is available. gksA

If the product is dormant for one year or more, it shall be tested for Test “A” ;fn mRikn ,d o”kZ ;k mlls vf/kd fnuksa ls iqjkuk gks rks fMyhojh djus ds igys bldk VsLV ^,*
before making deliveries. fd;k tk,A

20 21
The first batch of product received after Tank Cleaning shall be tested for Batch Vsad lkQ djus ds ckn mRikn ds igys cSps dks cSp QkesZ’ku VsLV ¼VsLV ^ch*½ ds fy, VsLV djsA
Formation Test (Test “B”)
15 fnu esa ,d ckj ;k gj izkfIr ds ckn HkaMkj.k VSad mRikn dh lqpkydrk ekih tkuh pkfg,A
The conductivity of the storage tank product is measured once a fortnight or
after every receipt. fj¶;wyj VSadksa esa mRikn dh lqpkydrk nSfud vk/kkj ij ekih tk,xhA vkbZ-ih%274@ch ,l 2000%
The conductivity of product in refueller tanks is measured on daily basis. The
Hkkx 274 ds vuqlkj eki yh tk,xhA bls D;w ,Q&304 lqpkydrk fjdkMZ esa fjdkMZ fd;k tk,A
measurement is to be carried out as per IP:274/BS 2000:Part 274. The same is
recorded in QF-304 Conductivity Record. o”kZ esa1ckj VSad ds isanh ds uequksa dk lw{e tSfod ijh{k.k ¼vkbZ ih%385 ds vuqlkj fd;k tk,xkA
iz;ksx’kkyk ls izkIr VsLV ifj.kke D;w ,Q&307 HkaMkj.k Vsad lw{e tSfod VsLV fjdkMZ esa fjdkMZ djsA
The Microbiological Test (as per IP:385) is carried out on the tank bottom
samples once every year. The test results received from the laboratory are Vsadksa ds chp LFkkukarj.k % vuqqeksfnr xq.koRrk ds cSp LVkWd] fcuk fdlh vkSj VsfLVax ds vyx vkSj
recorded in QF-307 Storage Tank Microbiological Test Record. lefiZr ikbiykbZuksa ds ek/;e ls mlh xszM ds VSadksa ds chp LFkkfUkrfjr fd, tk ldrs gSaA gkykafd
izkfIr Vsad dks ,fo,’ku DokfyVh daVªksy ,aM ,’;ksjsal eSU;qvy ds vuqlkj fLFkj djuk vko’;d gS
Transfers Between Tanks : Batched stock of approved quality is transferred vkSj izkfIr Vsad dks u;k cSp iznku djsaA
between tanks in same grade through segregated & dedicated pipelines without
further testing. Receiving tank will be settled in accordance with Aviation Quality
Control & Assurance Manual & new batch number assigned to receiving tank.

5.1 Storage tank daily fast flush procedure 5.1 HkaMkj.k VSad nSfud QkLV ¶y’k izfØ;k
The drain valves of the Storage tank, assigned for Fast Flush check, shall be QkLV ¶y’k tkap ds fy, fu/kkZfjr HkaMkj.k VSad ds Mªsu okYo QkLV ¶y’k Mªe esa ykbZu dh lkexzh dh
opened to drain out the line content qty in fast flush drum . ek=k dks fudkyus ds fy, [kkys tk,aA
Sample from drain line sample point near fast flush drum shall be checked QkLV ¶y’k Mªe ds fudV Mªsu ykbZu lsEiy ikbaV ls lsEiy fuEu rjg ls ns[kdj tkapsaA
for visual checks as described below :

The sample to be checked is drawn in a clear one litre bottle and checked for
tkaps tkus okys uewuksa dks 1 yhVj ds lkQ cksry esa fudkyk tk, vkSj Li”Vrk dh tkap dh tk,A
clarity. The bottle is twirled to create a vortex at the centre. The apex of the e/; esa Hkoj fufeZr djus ds fy, cksry ?kqek nsaA Hkoj ds fupys Hkkx esa ikuh vkSj lSfMesUVl dh
vortex is examined for presence of water and sediments. (Test F). mifLFkfr dh tkap djsa ¼VsLV ,Q½A

A measuring Jar (500 ml capacity) is filled with the sample from the one litre 1 yhVj cksry ls eki dk tkj ¼500 feyh- {kerk dk½ Hkjk tk,A mi;qDr gkbMªksehVj vkSj FkekZehVj
bottle. The density and temperature is noted with an appropriate hydrometer ls ?kuRo vkSj rkieku dk eki djsaA
and a thermometer.

22 23
The Value of density is converted to density at 15 C using ASTM charts. ?kuRo dk ;g ewY; , ,l Vh ,e pkVZ dk mi;ksx djrs gq, 15 fMxzh lsaVhxzsM ij ?kuRo esa ifjofrZr
This density is then compared to parent density. Any variation in excess of 2.5 fd;k tk,A rRi’pkr bl ?kuRo dh ewy ?kuRo ls rqyuk dh tk,A 2-5 fdxzk@ehVj3 ls vf/kd dk
kg/m3 indicates that ample does not meet specifications. varj ;g bafxr djrk gS fd uewuk fofunZs’kuksa dks iwjk ugha djrkA
100ml clear glass bottle is filled from the lower most product from 1L QC bottle. 1 yhVj Xykl cksry ds lcls fupys mRikn ls 100 feyh- dh Li”V Xykl dh cksry esa HkjsaA
The AQUADIS capsule is added in 100ml bottle & contents shaken well for 5
seconds. Wait for 1minute and check if any change in colour of Aquadis granules.
‘kofM’k dSIlqy blesa Mkysa vkSj 100 feyh- dh cksry rFkk mldh lkexzh 5 lsdsaM rd vPNh rjg
The Shade of red shows presence of water in excess of fifteen parts per million. fgyk,aA 1 feuV rd izrh{kk djsa vkSj ,DokfMl xSzuqYl ds jax esa fdlh izdkj ds ifjorZru dh tkap
(Test G) djsaA yky jax dh mifLFkrh izfr fefy;u 15 Hkkx vf/kd ikuh bafxr djrk gSA ¼VsLV th½A

In case the presence of water or sediments is noted in any of the tank bottom ;fn fdlh Vsad ds isanh ds uewus esa ikuh ;k lSfMesUV ik;k tk, rks tc rd Li”V uewuk izkIr u gks
sample, the sample point is drained in the fast flush drum till a clear sample of tk, rc rd QkLV ¶y’k Mªe ls mRikn fudkyrs jgsaA
the same is obtained.
fQYVjksa ds tfj, bls Vsad esa okil Hkstus ls igys mRikn QkLV ¶y’k Mªe esa fLFkj gksuk pkfg,A QkLV
The product shall be settled in the fast flush drum before sending back to tank ¶y’k Mªe ds isanh dk mRiknu MkÅuxzsM fd;k tk,A
through the filters. The bottom product of fast flush drum shall be downgraded .
LVSfVd Vsad vkSj LVSfVd fQYVjksa dh tkap LVSfVd midj.k xq.koRrk fujh{k.k ykWx ij fjdkMZ dh tk,A
Checks static tank, filters recorded on "Static Equipment Quality Inspection Log".

Checks are recorded using Quality Control Check Codes (refer Annexure I) viz. DokfyVh daVªksy psd dksM dk mi;ksx djrs gq, tkapksa dk fjdkMZ fd;k tk;A ¼foLr`r tkudkjh ds fy,
Code 1 for Morning QC checks on tanks , Code 5 for QC checks on tank during vuqyXud I ns[ksa½ tSls Vsad esa izkr% D;w lh tkap ds fy, dksM 1] Hkkjh cjlkr esa D;w lh tkap ds fy,
heavy rains, etc. Check codes identify stage of operation & type of equipment dksM 5 vkfnA tkap dksM izpkyu ds pj.k dk irk yxkrs gSa rFkk midj.k ds izdkj dk irk yxkrs gSa
from which samples are drawn. ftlls uewus fy, tkrs gSaA

5.2 Floating suction check 5.2 ¶yksfVax lD’ku tkap izfØ;k


The bounce of the storage tank Floating suction is checked once in a week. HkaMkj.k VSad ¶yksfVax lD’ku ds ckmal dh lIrkg esa ,d ckj tkap dh tk,A
The SS rope provided on top of the tank (connected to bell mouth) is pulled & VSad ¼csy ekmFk ls dusDVsM½ ds ‘kh”kZ ij miyC/k djk, x, LVhy jksi dks [khaps vkSj NksMsa+ rFkk fQj ,d
released & repeated once more. ckj ,slk vkSj djsaA
;fn ¶yksfVax lD’ku Bhd rjg ls dk;Z dj jgk gS rks jLlh [khapus okys O;fDr dks ckmal eglwl
If floating is functioning properly then person pulling rope will feel the bounce.
gksxkA
The Floating suction bounce indicator, provided at the side of the tank, should be Vsad ds cxy esa miyC/k ¶yksfVax lD’ku bafMdsVj dh lkFk&lkFk tkap dh tk, tks ¶yksfVad lD’ku dk
checked simultaneously indicating the movement of the floating suction. lapkyu bafxr djrk gSA
The SS rope should not be twisted & should not have sharp protrusions. ;g Hkh tkap ysa fd ,l ,l jksi esa ,saBu ugha gksuk pkfg, vkSj mlesa uqdhys mHkkj ugha gksus pkfg,A

24 25
After completing Bounce check ensure if the SS rope is put back into enclosure ckaml psd iw.kZ gksus ij ;g lqfuf’pr djsa fd ,l ,l jksi okil buDykstj esa j[k nh tk,] ftlds
having proper water proof cover. Åij mi;qDr okVjiwzQ doj gksA

5.3 Storage tank cleaning procedure 5.3 HkaMkj.k Vsad ds lQkbZ dh izfØ;k
Tank designated for cleaning shall be segregated from delivery / receipt / fast lQkbZ ds fy, inukfer Vsad dh CykbaM@Mcy CykWd CyhM okYo izpkyuksa dk mi;ksx djrs gq,
flush system completely using blinds / double block bleed valve operations. fMfyojh @ izkfIr @ QkLV ¶y’k flLVe ls iwjh rjg vyx dj fn;k tk,A
See if product in tank is emptied out fully or at level below suction level of tank. lqfuf’pr djsa fd Vsad dk mRikn iwjh rjg [kkyh gks ;k Vsad ds lD’ku Lrj ds uhp ds Lrj rd [kkyh
dj fn;k x;k gksA
Hot work permit will be issued before opening of tank manholes.

All safety precautions like availability of water hydrant/safety rope/proper


Vsad dk esu gksy [kksyus ls igys gkWV odZ ijfeV tkjh fd;k tkuk pkfg,A esu gksy [kksyus ds igys
ventilation/standby persons/availability of SCBA/etc. shall be taken before lHkh lqj{kk lko/kkfu;ka cjrh tk,aA tSls okVj gkbMsaªV @ lqj{kk jLlh@
opening of manholes.
mi;qDr laokru @ vfrfjDr O;fDr @ ,l lh ch , dh miyC/krk] vkfn miyC/k gksA
Open both the manholes of horizontal tanks and all four manholes of vertical
above ground tanks. lekukarj VSadksa ds nksuksa esu gksy [kksy nsaA ;fn VSad ofVZdy flfyfUMªdy gS rks Vsad ds Åij ‘kSy ds
lHkh pkjksa esu gksy [kksy nsaA
Empty out the remaining left over product using flame proof pumps.
¶yse izwQ iaiksa dk mi;ksx djrs gq, ‘ks”k cps mRikn [kkyh dj nsaA
Tank shall be left for degassing for 24-48 hrs naturally or using flameproof fans.
SVSad dks 24&48 ?kaVs rd izkd`frd #i ls xSl fofgu djs ;k ¶yse izwQ Qsu dk mi;ksx fd;k tk,A
All manholes shall be barricaded using rope ,so that no person can enter the tank
during degassing period.
jLlh dk mi;ksx djds lHkh esu gksy dks doj djs rkfd xSl foghu djrs le; dksbZ Hkh O;fDr
Check the oxygen level inside the tank after degassing period and before vessel mlesa izos’k u dj ldsA
entry by any person.
xSl foghu djus ds ckn vkSj O;fDr ds izos’k ds igys VSad ds Hkhrj vkDlhtu ds Lrj dh tkap djsaA
Oxygen level shall be minimum 0.8 LEL for enabling persons entry into tank
Vsad esa fdlh O;fDr ds izos’k ds fy, vkDlhtu dk Lrj de ls de 0-8 ,y b ,y gksuk pkfg,A
Ensure that all person entering in tank should be equipped with safety shoes
/safety cloths / safety glasses/ safety helmet / safety gloves with safety ;g lqfuf’pr djsa fd Vsad esa izos’k djus okys lHkh O;fDr;ksa ds ikl lqj{kk twrs @ lqj{kk diM+s@ lqj{kk
harness rope. p’esa @ lqj{kk gsyesV @ lqj{kk nLrkus vkSj lqj{kk gkusZl jksi gksaA

26 27
Person should not carry hard objects for tank cleaning which can damage epoxy Vsad dh lQkbZ ds fy, dBksj oLrq,a u iz;qDr dh tk,a] tks Vsad dks ,ikWDlh dksfVax {kfrxzLr dj nsA
coating of tank.
LoPN , Vh ,Q dk mi;ksx djrs gq, LoPN diMs+ ls lQkbZ dh tk,A lQkbZ ds fy, lkcqu dk ?kksy
Cleaning shall be done using clean cotton cloths & clean ATF. No soap solutions ;k ikuh iz;qDr u fd;k tk,A
or water to be used for cleaning.
lqfuf’pr djsa fd lHkh izkfIr @ fMfyoj ykbZu] VQZ @ lsaVj lEi Bhd rjg ls lkQ fd, tk,aA
Ensure that all receipt/ delivery line turf / centre sump are cleaned properly.
¶yksV ds lkFk ¶yksV ikbZi mBkdj ¶yksfVax lD’ku dh dk;kZRedrk dh tkap djsa ¶yksfVax lD’ku
Check the functionality of floating suction by lifting the float pipe with floats.
midj.k ds dlko@ uV@cksYV dh miyC/krk dh tkap djsaA
Check tightening/ availability of nut/bolts on floating suction device.

Check condition of swivel joint and greas it with petrosen grease if required. fLoy tkWbUV ds tksM+ksa dh fLFkfr dh tkap djsa ;fn vko’;d gks rks isVªkslu xzhl ls bls xzhflax djsaA

Check the wire guide rope of floating suction. ¶yksfVax lD’ku ds ok;j xkbM jksi dh tkap djsaA

Check the epoxy painting condition of tank. Touch up if required. Vsad ds ,ikWDlh isafVax dh tkap djsaA ;fn vko’;d gks rks Vp&vi djsaA

Check the thickness of tank shell & end plates once in 5 years as per procedure. izfØ;k ds vuqlkj ikap o”kZ esa ,d ckj Vsad lsy vkSj vafre IysVksa ds eksVkbZ dh tkap djsaA eksVkbZ dh
Touch up all areas after thickness check. tkap ds ckn lHkh {ks=ksa dk Vp&vi djsaA

Clean all foot marks on floor from in to out while boxing up the tank. Ensure izfØ;k ds vuqlkj ikap o”kZ esa ,d ckj VSad lsy vkSj vafre IysVksa ds eksVkbZ dh tkap djsaA eksVkbZ dh
that all cloths/cleaning material removed before boxing up tank manholes. tkap ds ckn lHkh {ks=ksa dk Vp&vi djsaA
Change the manhole gasket during boxing up. Replace manhole bolts if found to Vsad dh ckWfDlax vi ds le; Q’kZ ij lHkh in fpUgksa dks Hkhrj ls ckgj dh rjQ lkQ djsaA Vsad ds
be loosen threads, mismatch, etc. esu gksy dh ckWfDlax vi ds igys lqfuf’pr djsa fd lHkh diM+s @ lkQ djus dh lkexzh gVk nh xbZ
gksA
Box up the tank . Take small parcel in the tank.
ckWfDlax vi ds le; esu gksy xSldsV cny nsaA ;fn pqM+h <hyh gks] feleSp gks rks esu gksy ds cksYV
Carry out quality control checks on product like Test H, Test G & Test C before cny nsaA Vsad dks ckWDl & vki djsaA ‘kq#okn essa Vsad esa FkksM+k gh izksMDV ysaA
taking more products or starting delivery.

Start the fresh batch no. with first parcel after tank cleaning.
vkSj vf/kd mRikn ykus ds igys ;k fMfyojh ‘kq# djus ds igys mRikn dh xq.koRrk fu;a=.k tkap djsa
tSls VsLV ,p] VsLV th ,oa VsLV lhA
Update all records of tank cleaning / Hot work permit.
Vsad lkQ djus ds ckn iklZy ds lkFk u;k cSp uacj ‘kq# djsaA

Vsad dh lQkbZ @ gkWV odZ ijfeV ds lHkh fjdkMZ viMsV djsaA


28 29
6. Routine checks on mobile refuelling equipments 6. ekcskby fj¶;fwyx
a midj.kkas dh nfSud tkp
a ifzØ;k

The bottom samples of Refueller Tanks & Filter monitor inlet/FWS sump samples fj¶;wyjksa vkSj fMLisaljksa ds fj¶;wyj Vsad ds isanh ds uewuksa vkSj fQYVj ekfuVj @ fQYVj okVj lSijsVj
of Refuelers & Dispensers shall be subjected to Test “F” in each shift & shall ds lEi uewuksa dh VsLV ^,Q* ds fy, gj ikjh esa dh tk, vkSj D;w ,Q&401 esa fjdkMZ dh tk,
be recorded in QF-401 (Mobile Equipment Quality Control & Refuelling Log). ¼eksckbZy midj.k xq.koRrk fu;a=.k ,oa fj¶;wfyax ykWx½A ;fn dgha ikuh ;k lSfMesUV feys rks mldh
Approximate quantity of any free water or sediments found shall be recorded. vuqekfur ek=k fjdkMZ dh tk,A
While sampling, it has to be ensured that an amount of product in excess of the
uewus ds le; ;g lqfuf’pr fd;k tk, fd ykbZu lkexzh ls vf/kd mRikn dh ek=k foLFkkfir dh
line content has been displaced.
xbZ gksA
The applicable QC checks as well as Routine Checks as per QF-401 on Refuelling
Equipment shall be done at the beginning of each shift & recorded suitably. izR;sd f’k¶V ds izkjaHk esa fj¶;wfyax midj.k dh D;w ,Q 401 ds vuqlkj iz;ksT; xq.koRrk fu;a=.k
tkap vkSj #Vhu tkap dh tkuh pkfg, rFkk mi;qDr rjg ls fjdkMZ dh tkuh pkfg,A
Refuelling Equipments shall be drained of water and sediments as follows:
fj¶;wfyax midj.kdksa dks fuEu rjg ls ty foghu vkSj lSfMesUV foghu fd;k tk, %
Daily at the start of the morning shift.(Refueller tank & FS/FWS)
After every filling operations (Refueller tank only) lqcg dh f’k¶V ‘kq# gksus ij izfrfnu ¼fj¶;wyj Vsad ,oa ,Q ,l @ ,Q MCy;w ,l½
After Defuelling gj fQfyax izpkyu ds ckn ¼dsoy fj¶;wyj Vsad½
After Heavy Rain or snowfall fM¶;wfyax ds ckn
After vehicle washing or maintenance of Tank, filter or fueling system.
Hkkjh cjlkn ;k fgeikr ds ckn
If abnormal quantities of free water or sediments are found, or if it is not
possible to obtain a clear and bright sample which provides a satisfactory visual okgu ds /kksus ;k VSad] fQYVj ;k ¶;wfyax iz.kkyh ds vuqj{k.k cknA
& water detection check, the vehicle shall be withdrawn from service & an ;fn ikuh ;k lSfMesUV dh vlkekU; ek=k feys ;k LoPN vkSj lkQ uewuk ysuk laHko u gks] tks
investigation shall be carried out immediately to determine the sources of larks”ktud nd ,oa ty dk irk yxkus dh tkap miyC/k djk lds rks okgu dks lsok ls gVk fn;k
contamination. tk, vkSj feykoV ds lzksrksa dk fu/kkZj.k djus ds fy, rRdky tkap dh tk,A

The slop tank provided in the refuelling equipment shall be drained daily izfrfnu fj¶;wfyax midj.k esa miyC/k Lyki VSad [kkyh fd;k tk, vkSj D;w ,Q eksckby midj.k
and recorded in QF-Mobile Equipment Quality control and Inspection log. xq.koRrk fu;a=.k ,oa fujh{k.k ykWx esa fjdkMZ fd;k tk,A
Once in a fortnight, the refuelling equipment shall be subjected to Flushing. iUnzg fnu esa ,d ckj fj¶;wfyax midj.k dks ¶y’k fd;k tk,A blds nkSjku ukWty Lvªsuj gVk fn;k
During this the nozzle strainer shall be removed and inspected for cleanliness / tk, vkSj LoPNrk @ fLFkfr dk fujh{k.k fd;k tk,A D;w ,Q &402 eksckby midj.k ikf{kd ¶yf’kax
Condition. Also all the other checks as stipulated in QF-402 Mobile Equipment esa ;Fkk fofgr vU; lHkh tkap Hkh dh tk,a vkSj mUgsa fjdkMZ fd;k tk,A
Fortnightly flushing record shall be conducted & recorded.

30 31
7. Refueller topping up Procedure 7. fj¶;y
w j VkfWix
a vi ifzØ;k

Refuellers shall be loaded from a storage tank which has been settled fj¶;wyj dks mUgha HkaMkj.k Vsadksa ls VkWi&vi djsa tkss {kSfrt Vsdksa ds fy, U;ure 1 ?kaVs dk fLFkjrk
(Minimum 1 Hour settling time for Horizontal tank and 2 hours for Vertical le; vkSj ofVZdy Vsadksa ds fy, 2 ?kaVs dk gksA
Tanks) and storage Tank cleared of water/sediments.
fjDr fj¶;wyj dh yksfMax lss igys fj¶;wyj o fQfyax dusD’ku nksuksa ds mRikn xzsM dh igpku dh
Prior to loading an empty refueller, grade identification shall be checked tkap djsaA ;fn dksbZ fj¶;ywj ejEer dk;Z dh otg ls ,d eghus ls vf/kd le; ds fy, fjDr j[kk
both on the refueller as well as the filling connection. However, in case of
empty refueller after maintenance/remaining idle for a period exceeding
gks rks igys mls mRikn ls ¶y’k djsa ftlls ;g lqfuf’pr gks tk;s dh Vsad dh vkUrfjd fLFkrh
one month, the refueller tank shall be flushed with product and drained to lUrks”kutd gSA
ensure internal condition of the tank is satisfactory.
fj¶;wyj dks fj¶;wyj ds fy, fpfUgr djsa o Oghy pkWd yxk nsaA xSaVªh esa fn, x, vfFkZax ikWbUV ls
The refueller is to be positioned on the refueller loading point & wheel chocks ckafMax djsaA
placed in position. Bonding to be made with earthing points given at the Gantry.
okgu dk gSaMczsd yxk,a vkSj Oghy pkd dks iksft’ku esa j[ksaA inukfer {ks= esa fj¶;wyj dks ikdZ djus
Apply vehicle handbrake & position wheel chocks. After parking Refueller at ds ckn batu can dj fn;k tk,A fj¶;wyj ds esu lIykbZ fLop dks can dj fn;k tk, ¼ekLVj fLop½A
designated area, shut off the engine. Switch-off Refueller main supply switch
(Master Switch). fj¶;wfyax iSuy esa ,vj Vsad ds ncko xst dh tkap djus ds ckn VkWfiax vi ds nkSjku iz.kkyh esa
U;wure 90 ih ,l vkbZ ok;q ncko dh miyC/krk lqfuf’pr djsaA
Ensure minimum 90 psi air pressure available in the system during the complete
course of topping up by checking the air tank pressure gauge at Refueling panel.
HkaMkj.k Vsad ds isanh ls ,d yhVj dh cksry esa uewuk fudkysa vkSj LoPN ,oa lkQ mRikn rFkk ikuh ;k
Draw sample in a 1 litre bottle from the bottom of the storage tank and check for lSfMeUV dh vuqifLFkfr ds fy, VsLV ^,Q* dh tkap djsaA ,sls Vsad dk pquko fd;k tk, tks fLFkrjk
Test “F” for clear and bright product and absence of water or sediments. Tank le; dh xq.koRrk fu;a=.k dlkSfV;ksa dks iwjk djsA
shall be selected which meets the quality control criteria of settling time.
VkWi&vi gksl yksfMax ,MkIVj ls tksM+ fn;k tk, vkSj fj¶;wfyax ds yksfMax ykbZu okYo [kksy fn, tk,aA
The top up hose is hooked up to the loading adaptor and the loading line valves
on the refueller are opened. fMyhojh ykbZu ¶yks ehVj ¼;fn miyC/k gks½ ‘kwU; lqfuf’pr djus ds ckn xSaVªh ds yksfMax ikWbUV ds
oWkYo [kksy fn, tk,aA
The valve on the loading point on the gantry is then opened after ensuring that
the delivery line flow meter (if available) is reset to zero. eSU;qvy iz.kkyh esa yksfMax izpkyu izkjaHk djus ds fy, iaiksa dks eSU;qvyh izpkfyr fd;k tkrk gSA
vksVksesVsM iz.kkfy;ksa esa ncko de gksus vkSj izokg dh vko’;drk dk irk yxus ij iai vius vki
In case of manual systems, the pumps are operated manually to start the loading
operation. In case of automated systems, the pumps start automatically on pkyw gks tkrs gSaA
sensing the drop in pressure and flow requirement.

32 33
The Refueller loading operation should always be done under the supervision of fj¶;wyj dk yksfMax izpkyu ges’kk l{ke dfeZ;ksa ds i;Zos{k.k ds varxZr gh fd;k tk,A yksfMax
competent personnel. The loading operation should not be left unattended. izpkyu vuqifLFkr u NksM+k tk,A
Usually, Refuellers are topped up to full capacity after each refuelling
operation. This is done, by referring to either the top-up flow meter (if provided), lkekU;r;k izR;sd fj¶;wfyax izpkyu ds ckn fj¶;wyjksa dks iwjh {kerk rd VkWi&vi fd;k tkrk gSA
or the fill mark provided in the tank. ;g VkWi vi ¶yks ehVj ¼;fn miyC/k gks½ dks ns[kdj fd;k tkrk gS ;k Vsad esa miyC/k djk, x, fQy
ekdZ ls fd;k tkrk gSA
In case the refueller is to be topped up to a specific level, this may be done using
a dip rod and calibration chart.
;fn fj¶;wyj dks fdlh fof’k”V Lrj rd VkWi&vi fd;k tkuk gks rks fMi jkM vkSj dSfycsz’ku pkVZ dk
During top up, the line sump sample filter separator in the loading is mi;ksx djds ,slk fd;k tk ldrk gSA
subjected to Visual Check Test ‘F’ and recorded in QF-302-Static Equipment
Quality Inspection Log. VkWi&vi ds le; yksfMax esa fQYVj lsijsVj ds ykbu lSaiy dh n`’; tkap VsLV ^,Q* dh tk, vkSj
After a settling period of 10 minutes the refueller tank bottom sample is checked D;w ,Q&302 LFkSfrd midj.k xq.koRrk fujh{k.k ykWx esa fjdkMZ dh tk,A
for “Test F” and recorded in QF-401- Mobile Equipment Quality Control and
Refuelling Log . nl feuV ds fLFkjrk vof/k ds ckn fj¶;wyj Vsad ds isanh ds uewus dh ^VsLV ,Q* ds fy, tkap dh tk,
vkSj D;w ,Q&401 eksckby midj.k xq.koRrk fu;a=.k ,oa fj¶;wfyax ykWx esa fjdkMZ dh tk,A
Update all quality control records as applicable.

All the previously opened valves on the refueller and the loading point are ;Fkk iz;ksT; lHkh xq.koRrk fu;a=.k fjdkMksZ dks viMsV fd;k tk,A
closed and the bonding connections removed. The dust caps are replaced
on all the loading nozzles, refueller adaptors and sample points. fj¶;wyj vkSj yksfMax fcanqvksa ij igys [kqys lHkh okYoksa dks can dj fn;k tk, vkSj ckafMax
The refueller is placed back at its parking place. dusD’ku gVk fn;k tk,A lHkh yksfMax ukWtyksa] fj¶;wyj ,MkIVjksa vkSj lSaiy IykbaV ij dk;Z
gksus ds ckn MsLV dSi yxk nsaA

fj¶;wyj dks vius ikfdZax LFky ij okil [kM+k dj fn;k tk,A

34 35
8. Refuelling equipment fortnightly flushing 8. fj¶;wfyax midj.k dh ikf{kd ¶yf’kax izfØ;k

When preparing for fortnightly flushing of Refuellers/Dispensers, see if all tools fj¶;wyjksa@fMLisaljksa dh ikf{kd ¶yf’akx dh rS;kjh djrs le; lqfuf’pr djsa fd ukWty] LVsªuj] CykWd
are available for removal of nozzle, strainer, Block out device, sealing wire, lead vkÅV fMokbl] flfyax ok;j] ysM lhy vkfn gVkus ds fy, lHkh ;a= miyC/k gksaA
seals etc.
ckbZ rjQ dk jhy gksl ukWty gVk nsa] lhy rksM+ nsa vkSj bls ^¶yf’kax Mªe ls tksM+ nsaA ykbZu vkSj
Remove the LHS reel hose nozzle, break open the seal and connect the same ukWty gSaMy esa vkblksys’ku okYo [kksy nsa rkfd gksl ls mRikn Mªe esa [kkyh fd;k tk ldsA
to the “Flushing Drum”. Open the isolation valve in the line and the nozzle handle
so that the product from the hose can be emptied in to the drum.
uewus ds Mªe esa ikbZi ds uhps 1 yhVj ds uewus dh cksry j[k nsa rkfd uewuk tek fd;k tk ldsA
Place a 1 Litre sampling Bottle at the bottom of the pipe in the sampling drum so
that sample can be collected. uewus dks VsLV ^,Q* vkSj ^th* ds fy, tkapsa vkSj bls D;w ,Q&402 esa fjdkMZ djsaA

Perform Test “F” and “G” on the sample and record in QF-402. fDod fMLdusDV ds LØw dks <hyk djss] ukWty esa LVªsuj dks j[krs gq,] uksty dks fDoy fMldusDV
Hkkx ls vyx djsaA
Loosen the screws at Quick Disconnect and remove the nozzle from the Quick
Disconnection Joint keeping the strainer in the nozzle. vc ukWty LVªsuj fudky ysa vkSj jsr] jcj d.kksa] fdlh izdkj ds isaV] VwVu ;k fdlh vU; lkexzh dk
fujh{k.k djsa vkSj ;fn dqN feys rks mldh tkap djsaA
Now remove the nozzle and inspect for sediments, rubber particles, any paint
flakes, rupture or any other material and investigate if anything found.
fDod fMLdusDVj ls ukWty fQj ls tksM+ nsaA /;ku jgs fd Lvªsuj vHkh u yxk,aA
Reconnect the nozzles to the quick disconnector.
fj¶;wyj@fMLisalj ds ckdh lHkh gkslksa ds ukWty esa ;gh izfØ;k nksgjk,A
Repeat procedure Number 2 to 7 for all other hoses fitted with delivery nozzles.
;fn fdUgh gkslksa ij vksoj foax ukWty fQV fd;k x;k gks rks ;gh izfØ;k gksxhA gkykafd ¶yf’kax Mªe
In case Over-wing nozzle is fitted on any of the hoses, the procedure will be the dk mi;ksx fd, fcuk gh ukWty gVk fn;k tk,axsA
same. However the nozzles have to be removed without using the flushing drum.
vc midj.k ‘kq# djsa vkSj ¶yf’kax ds fy, rS;kj djsaA nksuksa ekeyksa esa pkgs fj¶;wyj gks ;k fMLisalj
Now start Equipment & ready equipment for flushing. In both cases, whether it is gks midj.k dks VsLV fjax ls tksM+uk gksxk] u fd jh ldZqys’ku ykbZu lsA fj¶;wyj ds ekeys esa ;fn
Refueller or Dispenser the equipment has to be connected to a test rig and not to
yksds’ku ij VsLV fjax miyC/k u gks rks gksl dks nwljs fj¶;wyj dh jh ldZqys’ku ykbZu ls tksM+ nsaA
the Re-circulation line. In case of Refueller, if test rig is not available at Location,
then the hose shall be connected to the re-circulation line of another refueller. lko/kkuh % /;ku nsa fd izkfIr fj¶;wyj esa fjDr txg dh miyC/krk gks rkfd vksoj ¶yks ls cpk tk
Caution : Note availability of ullage in receiving refueller to avoid overflow. ldsA
Start circulation & establish full flow rate through equipment. Observe & record ldZqys’ku ‘kq# djsa vkSj midj.k ds ek/;e ls iw.kZ izokg nj LFkkfir djsaA vf/kdre izokg nj ns[ksa
maximum flow rate . vkSj fjdkMZ djsaA

Close test Rig Valve/Re-circulation Valve slowly till flow rate just starts reducing. tc rd izokg nj ?kVus u yxs rc rd /khjs&/khjs VsLV fjax okYo@jh ldZqys’ku okYo dks can djsaA
Then close valve further to ensure full stoppage in 2 Seconds. Note reading of rRi’pkr nks lsdsaM esa iw.kZ canh lqfuf’pr djus ds fy, okYo dh vksj can dj nsaA ukWty ds MkÅu
nozzle downstream pressure Gauge (Maximum 120 psi). LVªhe izslj xst dh jhfMax uksV djsa ¼vf/kdre 120 ih ,l vkbZ½A
36 37
Ensure the pressure developed as above is more than 55 psi and update record lqfuf’pr djsa fd mi;qZDr fodflr ncko 55 ih ,l vkbZ ls vf/kd gks vkSj D;w ,Q&402 esa fjdkMZ viMsV
in QF-402. djsaA
Restart flow & record air pressure shown by pressure gauge in refuelling panel. izokg dks fQj ls ‘kq# djsa vkSj fj¶;wfyax iSuy ij yxs izslj xst n~okjk iznf’kZr ok;q lanHkZ ncko fjdkMZ djsaA
Release the deadman and check for proper functioning including the buzzer
MSM eSu fjyht djsa vkSj rhu feuVksa esa ctj dks lfØ; djus lfgr mldh dk;kZRedrk dh tkap djsaA
activation with 3 Minutes. Record the findings.
miyfC/k;ksa dks fjdkMZ djsaA
Observe and Record the PCV opening time from the start of the flow.
izokg ds izkjaHk ls ih lh Ogh ds [kqyus dk le; ns[ksa vkSj fjdkMZ djsaA
Observe and Record the PCV opening timing to attain the full flow.
lEi.kZ izokg izkIr djus ds fy, ih lh Ogh ds [kqyus dk le; ns[ksa vkSj fjdkMZ djsaA
Observe and Record the closing timing to attain full stoppage of Flow.
izokg dh laiw.kZ canh ds fy, can gksus dk le; ns[ksa vkSj fjdkMZ djsaA
Observe and Record product Quantity delivered after releasing the Deadman
at Full Flow. iw.kZ izokg ij MsM eSus fjyht gksus ds ckn fMfyoj dh xbZ mRikn dh ek=k ns[ksa vkSj fjdkMZ djsaA
Operate all emergency fuelling shut-off knobs, Emergency Engine shut off knobs,
IVysVQkeZ ij lHkh vkikrdkyhu ¶;wfyax lV&ukQ ukWc] vkikrdkyhu batu lV&vkQ ukWc] vkikrdkyhu
Emergency platform lowering valves, Wand sensors at platform (Dispenser only).
Each emergency system shall be independently tested & recorded in QF-402. IysVQkeZ dks uhps djus ds okYo] oSM lsalj dks izpkfyr djsa ¼dsoy fMLisalj ds fy,½A izR;sd vkikrdkyhu
iz.kkyh dks Lora= #Ik ls tkapsa vkSj D;w ,Q&402 esa fjdkMZ djsaA
In the case Emergency shut off, the time taken for flow to fully stop on operating
the emergency shut off shall be recorded. (for all the Emergency Shut off Knobs). vkikrdkyhu lV&vkQ ds ekeys esa vkikrdkyhu lV&vkQ ds ckn izpkyu dks iwjh rjg jksdus ds fy,
izokg esa fy;k x;k le; fjdkMZ fd;k tk,xk ¼lHkh vkikrdkyhu lV vkQ ukWc ds fy,½A
Check the operation of manual override of Deadman control & record findings.
MSM eSu daVªksy ds eSU;qvy vksoj jksbZM ds izpkyu dh tkap djsa vkSj fu”d”kksZa dks fjdkMZ djsaA
While flow is on, check all nozzles for general condition, wear & tear, leaks &
record the findings.
tc izokg gks rc lkekU; fLFkfr] f?klkbZ] lzko ds fy, lHkh ukWtyksa tkaps djsa vkSj fu”dk”kkZas dks fjdkMZ djsaA
In the case of Dispenser, check inlet coupler for general condition, wear & tear &
record the findings. fMLisalj ds ekeys esa lkekU; fLFkfr] f?klkbZ ds fy, buysV diyj dh tkat djsa vkSj fu”d”kksZa dks fjdkMZ djsaA

During operation of equipment, record pump pressure in Psi. In case of Refueller midj.k ds izpkyu ds nkSjku ih ,l vkbZ esa iai dk ncko fjdkMZ djsaA fj¶;wyj ds ekeys esa ;g fj¶;wyj iai
it is Refueller Pump Pressure & in case of Dispenser, it is Hydrant Pump Pressure. ncko gksxk vkSj fMLisalj ds ekeys esa ;g gkbMªsV iai dk ncko gksxkA

While in operation, remove product from all sampling points of FWS/Filter izpkyu ds le; ,Q MCY;w ,l@fQYVj ekfuVj ds lHkh lSEiy ikWbUV ls lSEiy psd jsa vkSj VsLV ,Q ,oa th
monitor & check for Test F & G. Update the Records. ds fy, tkap djsaA fjdkMkZs dks viMsV djsaA
38 39
Record inlet Pressure (In the case of Dispenser). buysV izslj dks fjdkM djsaA ¼ fMLisalj ds fy;s½

It has to be ensured that all hoses are connected and flushed as above during the ;g lqfuf’pr fd;k tk, fd ¶yf’kax ds izpkyu ds nkSjku lHkh gksl tqMsa gksaA
Flushing Operation.
vc fj¶;wyj ds ekeys esa ,d jhy gksl dk mi;ksx djrs gq, fM¶;wfyax iz.kkyh dh tkap dh tk,A gkQ dV
Now the defuelling system has to be checked using one reel hose in the case of Mªe esa dqN mRikn fudky ysa] jhy gksl ukWty ls mls LikÅV ds }kjk tksM+ nsa vkSj gkQ dV Mªe esa mRikn
Refueller. Drain some product in a half cut drum, connect a sprout to the reel hose izokfgr djsaA
nozzle and insert in the product in the half-cut drum.
fM¶;wfyax iz.kkyh izpkfyr djsa vkSj mi;qDr dk;kZRedrk dh tkap djsaA ukWty dk gSaMy vkSj ykbZu
Operate the defuelling system and check for proper functioning. The handle in dk vkblksys’ku [kksyk tkuk pkfg,A
the nozzle and isolation valves in the line need to be opened.
;g lqfuf’pr fd;k tk, fd fM¶;wfyax iz.kkyh Bhd rjg ls dk;Z djs vkSj gkQ dV Mªe ls mRikn
It has to be ensured that the defuelling system is working properly & continuous
withdrawal of product is happening from the half cut drum. To keep the level
yxkrkj vk,A gkQ dV Mªe esa Lrj cuk, j[kus ds fy, fQYVj ls mRikn dks yxkrkj fudyuk
in the half cut drum, continuous draining of product from the filter may be ensured lqfuf’pr djuk pkfg,A ¼ fQYVj lSaiy ykbZu okYoksa dks fu;af=r djds ½
(By controlling the filter sample line valves).
midj.k dh ikf{kd ¶yf’kax izpkyu ds nkSjku ncko varj] ukWty ncko] izkjafHkd ehVj jhfMax] vafre
Record Differential Pressure, Nozzle pressure, Initial Meter Reading, Final Meter ehVj jhfMax] izokg nj vkSj ehVj ds ek/;e ls laiw.kZ izokg fjdkMZ djsaA
Reading, flow rate and total flow through the meter during the fortnightly
flushing Operation of Equipment. ,d ckj tc mi;qZDr lHkh izpkyu lekIr gks tk,a rks midj.k can dj nsa] lHkh gksl vkfn dks
fMLdusDV dj nsaA
Once all the operations are over as above, stop the equipment, disconnect all
the hoses etc. fQj ukWty gVk nsa ;fn ukWty Lvªsuj vPNh fLFkfr esa gks rks mls , Vh ,Q vkSj ncko ds varxZr ok;q
ls lkQ djds fQj ls fQV dj nsaA ;fn Lvªsuj VwV x;k gks rks u;k yxk nsaA
Again remove the nozzle and if the nozzle strainer is in good condition, refit the
same after cleaning the same with ATF & with air under pressure. If the strainer is
ruptured, replace the same with new one. fDod fMLdusDV ls ukWty dks fQj ls tksM+ nsa vkSj lhfyax ok;j ,oa lhy ls bls lhy dj nsaA

Reconnect the nozzles to the quick disconnector and seal the same with sealing fjlko dh tkap ds fy, mRikn fQj ls ldqZysV djsa vkSj okgu dks ikfdZax LFky esa [kM+k dj nsaA
wire and seals.
Åij fn;s vuqlkj lHkh fjdkMZ vkSj lacaf/kr nLrkostksa esa ,fo,’ku vkijs’ku eSU;qvy ds vuqlkj
Re-circulate product to check for leaks & keep the vehicle in the parking space. ykxw lHkh izfof”V;ka viMsV djsaA
Update all records as above and all other entries applicable as per the Aviation
Operations Manual in respective documents.

40 41
9. Earthing and bonding reel checks on equipments 9- midj.kksa dh vfFkZax vkSj ckafMax jhy dh tkap izfØ;k

Continuity and resistance check to be carried on weekly basis. lkIrkfgd vk/kkj ij dfUVU;qfV vkSj izfrjks/kdrk dh tkap dh tk,A
Unreel the bonding wire from the bonding wire drum. ckafMx ok;j Mªe ls ckafMax ok;j dks iwjk [kksy ysaA
Set Multimeter to “Continuity Range” and connect one lead of the multimeter to eYVhehVj dks ^dfUVU;qfV jsat* esa lsV djsa vkSj eYVhehVj ds ,d ysM dks ØksdksMkby fDyi ls tksM+ nsa
the crocodile clip and touch the other lead to the equipment earthing plate.
rFkk nwljs ysM midj.k ds vfFkZax IysV ls tksM nsaA
Check and listen for the continuous tone from the multimeter confirming
the continuity of the bonding wire from the crocodile clip to the equipment. eYVhehVj ls lrr /kqu dh tkap djsa vkSj lqusa] tks ØksdksMkby fDyi ls midj.k ds ckafMax ok;j dh
dfUVU;qfV laiq”V djssxhA
Set the multimeter range to “0-20 ohms” point & check/register resistance value.
eYVhehVj dh jsat ^0 ls 20 vkse* lsV djsa vkSj izfrjks/k ewY; dh tkap djsa@ iathd`r djsaA
While carrying out the above mentioned check the bonding wire must be slowly
pulled from the bonding drum & simultaneously the resistance value to be noted. mi;qZDr tkap djrs le; ckafMax Mªe ls /khjs l ckafMax ok;j [khapsa] lkFk gh izfrjks/k ewY; uksV djsaA
Resistance value (units Ohms) to be recorded. izfrjks/kd oSY;w ¼vkse bdkbZ½ fjdkMZ dh tk,A

42 43
10. Approaching aircraft & positioning the vehicle 10- foeku ds utnhd rd igWqapus vkSj okgu dks ikdZ djus dh izfØ;k%

When the aircraft parking position/bay is known, the refuelling equipment and tc foeku ds ikfdZax dh fLFkfr @ cs dh tkudkjh gks rks foeku ds vkus ds igys fj¶;wfyax midj.k
crew shall proceed to the fuelling area in advance of the aircraft arrival so that vkSj ny ds ¶;wfyax {ks= esa pys tk,a rkfd fj¶;wfyax midj.k foeku ds vkus ij foeku rd rqjar
the refueling equipment may be moved promptly to the aircraft when it arrives. igqap tk,aA foeku rd igWqapus ds igys okgu ds czsdksa dh tkap dh tk,A
The vehicle brakes should be checked before approaching the aircraft.
foekuksa dh ¶;wfyax dsoy vkÅVMksj dh tk,xh vkSj fdlh Hkou ls de ls de 50 ehVj nwj gksuh
Fuelling of aircrafts shall only be done outdoors & not less than 50 meters away
from any building.
pkfg,A

Refuelling equipment shall be operated carefully on periphery roads & apron ,vjiksVZ dh iSjhQsjh lM+dksa ij fj¶;wfyax midj.k lko/kkuhiwoZd pyk, tk;axs vkSj vizu rFkk xfr
& speed shall not exceed approved limits for the airport. If the speeds are not ,vjiksVZ ds fy, vuqeksfnr lhekvksa ls vf/kd ugha gksxhA ;fn fdlh ,vjiksVZ ij xfr fofufnZ”V u
specified at any airport, the following speeds may be taken into consideration: gks rks fuEu xfr;ksa ij /;ku fn;k tk, %
On the periphery roads :30 kmph. iSjhQsjh dh lM+dksa ij % 30 fdeh @ ?kaVk
On the Apron : 15 kmph. vizu ij % 15 fdeh @ ?kaVk
Approaching aircraft : 5 kmph. foeku ds utnhd esa % 5 fdeh @ ?kaVk
Use of a mobile phone while driving a fuelling vehicle is strictly prohibited. ¶;wfyax okgu pykrs le; eksckby Qksu dk mi;ksx fcYdqy izfrcaf/kr gSA okgu pykrs le; u rks
Qksu djsa vkSj u gh Qksu fjlho djsaA
Vehicles shall not approach aircraft until aircraft anti-collision lights have been
switched off.
tc rd foeku dh ,aVh dksfytu ykbZV cq>k u nh tk,a rc rd okgu foeku rd u tk,aA
The approach to an aircraft shall be such that in the event of the vehicle’s brake
failure, collision will be avoided. The crewman, who shall get down from the foeku rd bl rjg igaqps fd okgu ds czsd ds foQy gksus dh fLFkfr esa VDdj ls cpk tk ldsA tc
refueling equipment when the refueling equipment is about 50 feet from the ¶;wfyax midj.k foeku ls yxHkx 50 QhV nwj gks rc ny dks uhps mrjdj midj.k dks foeku dh
aircraft, should guide the equipment under the wing. foax ds uhp xkbZM djuk pkfg,A
The order of arrival of support equipment is generally prescribed by airline, with lgk;d midj.k ds vkus dk Øe lkekU;r;k ,vjykbZu }kjk fu/kkZfjr fd;k tkrk gSA igys lhf<+;ka
stairs or aerobridge being positioned first. Refuelling equipment shall arrive ;k ,jksfczt yxk, tkrs gSaA HkhM+&HkkM+ ls cpus vkSj ¶;wfyax fcyac dh laHkkouk ds fy, ¶;wfyax
strictly on time in order to avoid congestion & possibility of fuelling delays. This is midj.k Bhd le; ij igaqpsA ;g fo’ks”k #i ls cM+s {kerk ds ¶;wfyajkas ds fy, egRoiw.kZ gS ftUgsa
important for large refuellers, which require a substantial area for manoeuvring. tula;kstu ds fy, i;kZIr {ks= vko’;d gksrh gSA
Wherever possible, refuelling equipment should be moved in forward direction.
If moving a refuelling equipment in reverse is necessary in & emergency then two tgka rd laHko gks lds fj¶;wfyax midj.k dks QksMZokMZ ¼vxzLFk½ fn’kk esa gh pyk;saA ;fn fj¶;wyj dks
guides (crewman, supervisor or assistance from airline) shall be used, one fjolZ djuk t#jh gks rks nks xkbZM dh lgk;rk yh tk;sA ,d pkyd ds lkeus gks vkSj nwljk ihNs tks
located at front in the driver’s direct view, & other at rear but visible to driver fd pkyd dks ihNs ns[kus okys dkap ls fn[kkbZ ns ldsA NksVs okguksa ds fy, ,d gh xkbZM i;kZIr gksrk
through rear view mirror. One (1) guide shall be used for smaller vehicles. Airline gSA bl tula;kstu ds fy, ,vjykbZ ds xzkmaM LVkQ dh lgk;rk yh tk,A
ground crew assistance and concurrence should be sought for this manoeuvre.

44 45
Vehicles shall be positioned safely, taking account of the following: fuEu dk /;ku j[krs gq, okguksa dks lqjf{kr <ax ls [kM+k fd;k tk,

Extreme care should be taken to avoid the possibility of collision with any part ¶;wfyax fLFkfr esa tula;kstu ds le; foeku ds fdlh Hkkx ;k ry ij dk;Zjr midj.kksa ls
of the aircraft or ground servicing equipment whilst manoeuvring into (and away Vddj dh fdlh laHkkouk ls cpus ds fy, i;kZIr lko/kkuh cjruh pkfg,A
from) the fuelling position.
¶;wfyax LVkWQ ;g lqfuf’pr djsxk fd vkikrdkyhu fLFkfr esa ¶;wfyax midj.kksa dks rsth ls gVkus
Fuelling staff shall ensure that clear path is maintained to permit rapid removal ds fy, ekxZ [kkyh gksaA fj¶;wfyax midj.k dks foeku rd igWqapus ds fy, mfpr ekxZ miuk,a tk,aA
of fuelling equipments in case of emergency. While placing the Refuelling fj¶;wfyax dks dHkh Hkh foeku dh vksj fjolZ MkbjsDlu esa u yk;k tk,A
equipment oblique approach to the aircraft shall be followed. The refuelling
equipment shall never be reversed towards the aircraft.
foeku dh oSaV ikbZi lqj{kk tksu] ¼de ls de rhu ehVj ds v/kZO;kl½ , ih ;w ,D>kLV] bZ ¶yDl
Aircraft vent pipe safety zones (minimum 3 metre radius), APU exhaust efflux ;k vU; [krjukd {ks=ksa ls cpsaA
or other danger areas should be avoided.
cSxst gSaMfyax midj.k ;k foeku esa mi;ksx vkus okys vU; okguksa ds [krjs dks de djus ds fy,]
Vehicle delivery hoses & hydrant servicer inlet hoses should be positioned to okgu fMfyojh gksl vkSj gkbMsaªV buysV gksl bl rjg yxk, tk,a rkfd okgu mu ij u p<+sa vkSj {kfr
minimise risk of baggage handling equipment or other aircraft servicing vehicles u igWqapk,aA
driving over them & causing damage.
;fn vaMjfoax Msd gksl iz;qDr fd, tkus gksa rks fcuk dksbZ vfrfjDr ncko cuk,] gkslsl dks foeku ds
If underwing deck hoses are to be used, hoses can be connected to aircraft ¶;wfyax IokbaV ls tksM+saA ,d ckj tqM+ tkus ij gkslsls Lora= #Ik yVd ldrs gSa vkSj ¶;wfyax IokbaV ds
fuelling point without exerting sideways pressure which can damage aircraft tqM+s gq;s gkst LorU= #I ls yVds gksa vkSj ¶;wfyax IokWabV ds oVhZdy ¼m/okZ/kj½ gkasaA
adapters. connected hoses should hang freely & vertically from fuelling point.
;g lqfuf’pr djus ds fy, fd fo’ks”k lko/kkuh cjrsa dh vaMjfoax ¶;wfyax ds fy, iz;qDr okgu
Special precautions shall be taken to ensure that vehicles used for underwing
fuelling have sufficiently low profile for this purpose. fuEu izksQkby dk gksA

Additional factors to consider when positioning at an aircraft include: fdlh foeku ds ikl okgu [kM+k djrs le; /;ku nsus ;ksX; vfrfjDr dkjd %
minimum hose length exposed to other traffic, effective control and safety vU; ;krk;kr ds fy, vukPNkfrn gksl dh U;wure yackbZA
monitored by refuelling staff, efficient deployment & recovery of hoses, possibly fj¶;wfyax LVkWQ }kjk izHkkoh fu;a=.k ,oa lqj{kk fuxjkuhA
avoid any part of vehicle in line with aircraft engine exhaust ensuring if deck gkslsl dk dq’ky la?kVu ,oa gkslsl dh fjdojhA
hoses can hang freely & vertically (without sideways pressure) from aircraft ;fn laHko gks rks foeku ds batu fudkl ds ykbZu esa okgu [kM+k u djsa] lqfuf’pr djsa fd
adaptors. Msd gkslsl foeku ds ,MkIVjksa ls Lora= vkSj m/okZ/kj ¼fcuk ncko ds½ yVdsA
During position driver shall not leave cab until parking brakes have been tc iksft’ku esa gks rks pkyd ikfdZax czsd yxk, fcuk rFkk ykWd bu iksft’ku esa j[ks fcuk okgu ugha
applied & locked in position. It is the responsibility of the supervisor to ensure
that fuelling vehicles can be positioned safely relative to the aircraft as NksM+sxkA i;Zos{kd dk ;g mRrjnkf;Ro gksxk fd ;g lqfuf’pr djs fd ¶;wfyax okgu tSlk Åij
described above and to take action with the airport authority or airport safety mYys[k fd;k x;k gS foeku ds laca/k esa lqjf{kr #Ik ls [kM+k fd;k tk,A ;fn lHkh vis{kk,a iwjk
committee in writing if it is not possible to meet all of these requirements. djuk laHko u gks rks ,vjiksVZ ds izkf/kdkjh ;k ,vjiksVZ dh lqj{kk lfefr ds lkFk ;g ekeyk fyf[kr
#Ik ls mBk,A
46 47
Due allowance should be made for settlement of aircraft wing & other surfaces ¶;wfyax okgu dh iksft’kfuax esa laof/kZr ¶;wy yksM ds varxZr foeku ds foax vkSj vU; varjkQydksa
under increased fuel load in positioning fuelling vehicle. If possible, engine of the dks fLFj djus ds fy, fu;r le; nsuk pkfg,A ;fn laHko gks rks foeku ds foax ds uhps ¶;wfyax
fuelling vehicle should not be positioned under wing of the aircraft. okgu dk batu u j[ksaA
Under normal circumstances fuelling equipment shall be positioned to allow clear lkekU; ifjfLFkfr;ksa esa ¶;wfyax midj.k dks vkikrdkyhu fLFkfr esa Li”V #Ik ls vkxs pykus dh
forward drive out in emergency & to permit ready movement to another aircraft xaaqtkb’k gksuh pkfg, rFkk tc ¶;wfyax iwjh gks tk, rks nwljs foeku ds lapkyu esa ck/kk u MkysA
when fuelling is complete.

When in position, the operator of the refueling equipment shall not leave the cab
until the parking brakes have been applied.

While raising lift platform of dispenser, care shall be taken to ensure that it does fdlh fMLisalj dk fy¶V IysVQkeZ mBkrs le; ;g /;ku nsuk pkfg, fd og foeku ds fdlh Hkkx ds
not touch any part of the aircraft. laidZ esa u vk,A

48 49
11. Underwing refuelling with hydrant dispenser 11- gkbMªasV fMLisalj ls vaMjfoax fj¶;wfyax izfØ;k

Promptly after the dispenser has been positioned for the refuelling, the following fMLisalj dkss fj¶;wfyax ds fy, iksft’ku djuss ds rqjar ckn fuEu izpkyu J`a[kykc) #Ik esa fu”ikfnr
operations shall be performed in sequence: fd, tk,axs %
When the equipment has been positioned properly, the operator shall activate midj.k mfpr <ax ls [kM+k djus ds ckn gsaM czsd lfØ; fd;s tk,aA
the handbrakes .
okgu ds Vk;j ds uhps vfFkZax IysV lqjf{kr #Ik ls j[kh tk,A
An earthing plate should be securely placed under the vehicle tyre.

Fire extinguisher to be unclamped & kept at panel side of Refuelling Equipment ckafMax Oghy ok;j dks [kksysa vkSj lqjf{kr #Ik ls foeku ds inukfer fcanq ij tksM+ nsaA
at an easily accessible position.
;fn dksbZ fcanw fpfUgr u fd;k x;k gks rks ,slk fcanq ¼ojh;rk ds rkSj ij foeku izpkyd dh lgk;r
Unreel & securely connect the bonding reel wire to designated point on aircraft. ls½ pqusa tks /kkrq dk rks gks ysfu fuEu u gks %
If no point is designated, select a point (preferably with assistance of the aircraft Oghy vlsacyh dk dksbZ Hkkx ¼foeku ds ‘ks”k Hkkx ls dksbZ dUVhU;wVh u gksxh½
operator) which is bare metal but not to: fdlh jsfM;ksa ,aVhuk
Any part of wheel assembly (there may be no continuity to rest of the aircraft); dksbZ iksfyl fd;k gqvk] LykbfMax ;k laihfMr ?kVd tSls vaMj dSjst fMVsy] ¶ySi VªSd ;k izkisyjA
Any radio antenna; ckafMax ds fy, mi;qDr ?kVdksa esa vusd ¶;wfyax iSuy igqap nokjksa ds bnZ&fxnZ fy¶V ;k blh rjg ds
Any polished, sliding or stressed components such as undercarriage details, flap vU; fNnz ‘kkfey gSaA gkykafd foeku ds bathfu;j ls fDy;jsal feyus ds ckn gh ,slk fd;k tk,xkA
tracks or propellers. Suggested components suitable for bonding include the lip
around many fuelling panel access doors or other similar apertures. This should
however be done only after obtaining the clearance from the aircraft engineer. foeku ls fMyhojh gksl tksMs+aA lqfuf’pr djsa fd foeku esa ukWty dh ckafMax foeku ds ,MkIVj ls
ukWty dks tksM+us ds igys dh tk,A ukWty okYo [kksysaA lqfuf’pr djsa fd [kqyus okyk fyoj gSMy
Connect delivery hoses to aircraft. Ensure that bonding of nozzle to aircraft is vksoj lsaVj iksft’ku esa gksA tkap djsa fd ykWd iksft’ku esa ukWty gSaMy ls ukWty gVkuesa esa foeku
done before nozzle is connected to aircraft adaptors. Open nozzle valve. See if ds ,MkIVj ls dusD’ku lqjf{kr gksA
opening lever handle is in over centre position. See if aircraft connection adaptor
is secure by attempting to remove nozzle with nozzle handle in locked position. gkbMsaªV fiV doj gVk nsa vkSj ,MkIVj ds i`”V ij ls /kwy ;k ikuh lkQ djsaA
Remove hydrant pit cover & remove any dirt or water on adapter surface. gkbMsaªV fiV okYo ls ysu;kMZ cka/k nsa vkSj ysu;kMZ dks izpkyu fLFkfr esa vkxs rd ys tk,a ftlesa dksbZ
ck/kk u gksA lqfuf’pr djsa fd fiV okYo can djus ds fy, ysu;kMZ lfØ; djds can dj fn;k tk,A
Attach lanyard to hydrant pit valve & extend lanyard towards operating position
& clear obstructions. See if pit valve is closed by activating lanyard to close it.
fiV okYo ls buysV gkbMsªaV diyj tksM+ nsaA tc rd fj¶;wfyax ‘kq# u gks tk, rc rd gkbMªsaV fiV
Connect intake hydrant coupler to pit valve. Do not actuate hydrant pit valve until okYo dks pkyw u djsaA
fuelling is to start.
gkbMsaªV fiV okYo dh n`’;rk lq/kkjus ds fy, fiV ds eqag ds Åij mPp n`’;rk okys gtkMZ ekdZj
To improve visibility of hydrant pit valve, high visibility hazard marker shall be iznf’kZr fd;k tk,A blds fy, mPp n`’;rk lkexzh ls fufeZr >aMs dh vuqla’kk dh tkrh gSA fdarq blh
displayed above pit opening. A flag constructed from high visibility material is rjg dh lexz n`’;rk miyC/k djkus okys oSdfIyd fMtkbu@ midj.k i;qDr fd, tk ldrs gSaA
recommended. But alternative designs/equipments providing similar degree of
all round visibility may be used.

50 51
Place the traffic cones during operations in position for segregating the area. {ks= dks vyx&Fkyx djus ds fy, izpkyu ds nkSjku ;krk;kr dksu [kM+s djsaA
Note & record accurate meter totalizer readings. Do not use totalizer readings lHkh ehVj VksVykbtj jhfMa+x dks lgh&lgh uksV djsa vkSj fjdkMZ djsaA fiNyh fMfyojh ls VksVykbtj
from previous delivery. jhfMa+x dk mi;ksx u djsaA
Open manual fuelling valve on aircraft, if provided. (In case of Boeing B-707
should’nt open manual tank distribution valves till tank load distribution is known.
foeku ij eSU;qvy ¶;wfyax okYo [kksYksa] ;fn miyC/k gksA ¼cksbax ch 707 ds ekeys esa eSU;qvy Vsad
forj.k okYo rc rd ugha [kksyk tk,xk tc rd Vsad yksM forj.k ekywe gks½A
QC check test “F” & “G” to be performed on line sample drawn from outlet of
filter monitor vessel or filter water sump. On airline representative advise, fQYVj ekfuVj oslsy ;k fQYVj okVj lSijsVj ds vkmVysV ls fy, x, ykbZu uewus dk D; lh psd
delivery starts , open hydrant pit valve & actuate deadman control to start flow. VsLV ^,Q* ,oa ^th* fu”ikfnr djsA tc ,vjykbZu dk izfrfuf/k ;g lwfpr djs fd fMyhojh ‘kq# dh
tk ldrh gS rks gkbMªsaV fiV okYo [kksy nsa vkSj izokg ‘kq# djus ds fy, MSMeSu daVªksy pkyw dj nsaA
If so requested by airline, after start of flow to aircraft; approx.1000 litres will
ensure most dispensers have been flushed of fuel from previous delivery before ,vjykbZu }kjk ,slk vuqjks/k fd;k x;k gSa rks foeku esa izokg ‘kq# djus ds ckn yxHkx 1000
taking sample. yhVj tku dss ckn fMLisalj dk fQYVj lSEiy fn[kk,A
The showing of the sample and microdetector capsule check results to the airline foeku fMfyojh jlhn esa ikuh ,oa d.k eqDr fMyhokjh ds Lohdk;Zrk dh vfHkLohd`fr dks lqxe cukus
representative is desirable to facilitate the acknowledgment of acceptance of
water & particulate free delivery in the Aircraft Delivery Receipt. ds fy, ,vjykbZu ds izfrfuf/k dks uewuk vkSj ekbØkfMVsDVsj dSIlwy psd ifj.kke fn[kkuk okaNuh;
gSA
Hand hold open deadman control throughout fuelling & maintain clear view of
dispenser control panel & aircraft fuelling points. Where deadman timers are lai.kwZ ¶;fyax ds nkSjku le; [kqy MSMeSu daVªksy dks gkFk ls idM+s jgsa vkSj fMLisalj daVªksy iSuy rFkk
installed, deadman should be actuated in frequency with setting to avoid fuelling foeku ¶;wfyax fcanqvksa dks Li”V #Ik ls ns[krs jgsa] tgka MsM eSu VkbZej yxk, x, gksa ogka ¶;wfyax esa
interruption. vkus okyh ck/kk ls cpus ds fy, MSMeSu dks lsfVax ds lkFk ckjackjrk esa ‘kq# djuk pkfg,A
Note: All Electrical deadman systems include a deadman override. It should be uksV % lHkh fon;qr MsM eSu iz.kkfy;ksa esa MSMeSu vksoj jkbZM gksrk gSA ;g ojh;rk ds rkSj ij fLizax
preferably of spring loaded, push button type. In case no spring return deadman yksMsM] iq’k cVu izdkj dk gksxkA ;fn dksbZ fLizax fjVuZ MSMeSu vksoj jkbZM fLop iz;qDr u dh xbZ gks
override switches are used same need to be properly sealed in inoperative rks vkikrdkyhu mi;ksx ds vykok gj le; bls vizpkfyr fLFkfr esa mi;qDr rjg ls lhy fd;k
position at all times other than for emergency use. Whenever used during
refueling, it should continuously attended by refueling operator/supervisor.
tkuk vko’;d gSA fj¶;wfyax ds nkSjku ges’kk tc dHkh iz;qDr gks rks fdlh fj¶;wfyax izpkyd @
Deadman over ride switch should be used only for completing ongoing refueling i;Zos{kd }kjk bls vVsaM fd;k tkuk pkfg,A MSMeSu vksoj jkbZM fLop dsoy lrr fj¶;wfyax iw.kZ gksus
& deadman should be repaired before it is taken for next refueling. ds fy, gh iz;qDr dh tk, vkSj vxyh fj¶;wfyax ds fy, ys tkus esa MSMeSu dh ejEer dh tk,A

During fuelling, occasionally check vehicle, inlet & all delivery hoses for leaks, ¶;wfyax ds nkSjku dHkh&dHkh okgu dh tkap djsa] fjlko ds fy, buysV vkSj lHk fMyhojh gkslksa dh
aircraft fuel vents for overflow & monitor dispenser gauges for operation within tkap djsa] vksoj ¶yks ds fy, foeku ds ¶;wy osaV dh tkap djsa vkSj lhek ds Hkhrj izpkyu ds fy,
limits, particularly differential & fuelling sense pressures. fMLisalj xst ekfuVj djsa] fo’ks”k #Ik ls fMQjsfUV;y vkSj ¶;wfyax izs’kj eglwl djus esaA

52 53
Record Inlet pressure, Nozzle Pressure, differential pressure & flow rate of the tc ncko varj uksV djsa rks buysV ncko] ukWty ncko] ncko varj vkSj fj¶;wfyax dh izokg nj
refuelling when differential pressure is noted. Be alert to respond to instructions fjdkMZ djsaA lrdZ jgsa vkSj ,vjykbZu ds izfrfuf/k ds vuqns’kksa ij /;ku nsa ;k vkikrdkyhu dkjZokbZ
from the airline representative, or to situations requiring emergency action. tSlh fLFkfr;ksa ij /;ku nsaA
Note: If fuelling sense (venturi) pressure is greater than maximum indicated on or uksV % bZa/ku izokg ds nkSjku ;fn ¶;wfyax vuqHkwfr ¼osapqjh½ ncko foeku xst ij ;k foeku xst ls lVs
adjacent to aircraft gauge (HPCL limits for same is 50 psi unless a lower limit is bafxr vf/kdre ncko ls vf/kd gks ¼blds fy, ,p ih lh ,y dh lehk 50 ih ,l vkbZ gS tc rd
prescribed for aircraft) while fuel is flowing, the fuelling should be stopped since
the secondary pressure controller (the Pressure Control Valve) is apparently no foeku ds fy, fuEurj lhek fofgr u dh xbZ gks½ rks ¶;wfyax can djsA D;ksafd lsdsaMjh izslj daVªksyj
longer able to limit steady flow pressure to a level which is safe for the aircraft. okg; #Ik ls fLFkj izokn ncko dks foeku ds fy, lqjf{kr Lrj rd lhfer djus esa leFkZ ugha gksxkA

On completion of fuelling & after confirmation from airline representative, close ¶;wfyax iwjh gksus ij vkSj ,vjykbZu ds izfrfuf/k;ksa ls laiqf”V ij gkbMªsaV okYo can dj nsa rFkk ehVj
hydrant valve & accurately record meter totalizer readings & delivered quantity VksVykbtj jhfMax vkSj , Mh vkj vkSj midj.k iqLrd esa fMyhojh dh xbZ ek=k dks lgh fjdkMZ djsaA
on ADR & Equipment book.
fQYVj okVj lsijsVj lai ;k fQYVj ekfuVj oslsy ds vkmVysV dh vksj ls vkgfjr uewuksa dh ¶;wfyax
Perform after fuelling quality control checks Test “F” & “G” on the sample drawn ds ckn xq.koRrk fu;a=.k tkap VsLV ^,Q* vkSj ^th* fu”ikfnr djsaA
from filter water separator sump or the outlet side of the filter monitor vessel.
ukWty fMLdusDV djsa vkSj MLV doj yxk,a] gkslsls dks okil yk,a vkSj gksYMjksa esa ukWty yVdk nsaA
Disconnect nozzles & attach dust covers; retrieve hoses & securely stow nozzles in
holders. Do not remove ladder or lower lift platforms until airline representative
tc rd ,vjykbZu ds izfrfuf/k ,MkIVj vkfn dh tkap iwjh u dj ysa rFkk iSuy dk;Z iwjk u dj ysa
has completed his check of the adapters, etc., and has completed panel work. rc rd lh<+h ;k fupyk fy¶V IysVQkeZ u gVk,aA

Disconnect inlet coupler, replace dust covers on hose coupler & hydrant adapter. buysV diyj dks fMLdusDV dj nsa rFkk gksl diyj vkSj gkbMªsaV ,MkIVj dk MLV doj cny nsaA
Retrieve inlet hose & securely stow nozzles & inlet coupler in holders. buysV gksl dks okil yk,a vkSj lqjf{kr #Ik ls ukWtyksa vkSj buysV diyj dks gksYMjksa esa yVdk nsaA

Obtain the required signature from the Airline representative in the ADR. , Mh vkj esa ,vjykbZu ds izfrfu/kh dk visf{kr gLRkk{kj izkIr dj ysaA
Before removing dispenser on completion of fueling, do final check, including
complete “360 Degree” walk around vehicle to see if aircraft fuel caps have
¶;wfyax iwjk gksus ij fMLisalj gVkus ds igys okgu ds laiw.kZ 360 ?kwe dj vafre tkap fu”ikfnr djsaA
been refitted, & fuelling vehicle is properly disconnected from aircraft & that all rkfd ;g lqfuf’pr gks tk, fd foeku ds ¶;wy dSi fQj ls fQV fd, x, gSa vkSj ¶;wfyax okgu
equipments are stowed correctly. foeku ls Bhd rjg ls fMLdusDV fd;k gks vkSj lHkh midj.k Bhd rjg ls yVdk, x, gksaA

See if all hoses are properly stowed & lift platform & rails are fully retracted. lqfuf’pr djsa fd lHkh gksl Bhd rjg ls fQDl fd;s x, gksa vkSj fy¶V IysVQkeZ vkSj jsy okil yxk
Disconnect & retrieve bonding, grounding wires & see that no items are left fn;s x, gksaA ckafMax vkSj xzkamfMax ok;j dks fMLdusDV fd;k x;k gks vkSj okil fjokbaM dj fn;s x,
behind. gksaA lqfuf’pr djsa fd dksbZ Hkh en NwVus u ik,A
Drive dispenser off moving in a forward direction. If reversing is necessary due to fMLisalj dks vkxs dh fn’kk esa ys tk,aA ;fn HkhM+&HkkM+ ds dkj.k midj.k dks ihNs djuk vko’;d gks
congestion, concurrence of airline staff should be taken. Equipment should be rks ,vjykbZu ds LVkWQ dh lgefr yh tk,A midj.k dks Bhd rjg ls bldh fLFkfr esa xkbZM djsA
properly guided out of its position.

54 55
12. Underwing refuelling with refueller 12. fj¶;wyj ls vaMjfoax fj¶;wfyax

Promptly after the Refueller has been positioned for refuelling, the following fj¶;fwyax ds fy, fj¶;wyj ds iksft’ku esa gksu ds rqjar ckn J`[kaykc) #Ik ls fuEu izpkyu
operations shall be performed in sequence : fu”ikfnr fd, tk,a %
When equipment has positioned properly, operator shall activate handbrakes. tc midj.k mfpr <ax ls iksft’ku fd;k x;k gks rks izpkyd dks gSaM czsd lfØ; djuk pkfg,A
The earthing plate should be securely placed under the vehicle tyre. okgu ds Vk;j ds uhps ,d vfFkZax Ivsy lqjf{kr #Ik ls j[kh tk,A
Fire Extinguisher to be unclamped & kept at panel side of Refuelling Equipment
at an easily accessible position. vfXu’keu dks ckgj fudky fn;k tk, vkSj fj¶;wfyax midj.k ds iSuy ds ikl tgkWa vklkuh ls j[kk
tk lds] j[kk tk;sA
Unreel & securely connect the bonding reel wire to a designated point on the
aircraft. If no point is designated, select a point (preferably with the assistance ckafMax Oghy ok;j dks [kksy nsa vkSj lqjf{kr #Ik ls foeku ds inukfer fcanq ij tksM nsaA ;fn dksbZ
of the aircraft operator) which is bare metal but not to: fcanq inukfer u fd;k x;k gks rks ,slk fcanq ¼ojh;rk ds rkSj ij foeku izpkyd dh lgk;rk ls½
Any part of wheel assembly (there may be no continuity to rest of the aircraft) pqusa tks /kkrq dk rks gks ysfdu fuEu u gks
Any radio antenna Oghy vlsacyh dk dksbZ Hkkx ¼foeku ds ‘ks”k Hkkx ls dksbZ lkrR;rk u gksxh½
Any polished, sliding or stressed components such as undercarriage details, dksbZ jsfM;ksa ,aVhuk
flap tracks or propellers. dksbZ ikfyl fd;k gqvk] LykbfMax ;k laihfMr ?kVd tSls vaMj dSjst fMVsy] ¶ySi VªSd ;k izksisyjA
Suggested components suitable for bonding include lip around many fuelling
panel access doors or other similar apertures. This should however be done only
ckafMax ds fy, lq>k, x, mi;qDr ?kVdksa esa ¶;wfyax iSuy ds fudkl n~okjksa ds bnZ&dqN rjg ds fNnz
after obtaining the clearance from the aircraft engineer. ‘kkfey gSaA gkykafd foeku ds bathfu;j ls fDy;jsal feyus ds ckn gh ckafMax fd;k tk;sA

Connect delivery hoses to aircraft. Ensure that bonding of nozzle to aircraft is foeku ls fMyhojh gksl tksM+saA lqfuf’pr djsa fd foeku esa ukWty dh ckafMax foeku ds ,MkIVj ls
done before the nozzle is connected to aircraft adaptors. Open the nozzle valve. ukWty dks tksM+us ds igys dh tk,A ukWty okYo [kksysaA

Ensure that opening lever handle is in the over center position. Check if connection lqfuf’pr djsa fd [kqyus okyk fyoj gSaMy vksoj lsaVj iksft’ku esa gksA tkap djsa fd ykWd iksft’ku
to aircraft adaptor is secure by attempting to remove nozzle with nozzle handle esa ukWty gSaMy ls ukWty gVkus esa foeku ds ,MkIVj ls dusD’ku lqjf{kr gksA
in locked position.
lHkh ehVj jftLVj ‘kwU; ij fjlsV djsaA lHkh ehVj VksVykbtj jhfMax uksV djsa vkSj lgh&lgh fjdkMZ
Reset all meter registers to zero, note and record accurately all meter totalizer djsaA fiNyh fMyhojh ls VksVykbtj jhfMax iz;qDr u djsaA
readings. Do not use totalizer readings from previous delivery;

Open the manual fuelling valve on the aircraft if provided. (In case of Boeing foeku ij eSU;qvy ¶;wfyax okYo [kksysa] ;fn miyC/k gks ¼cksbax dh 707 ds ekeys esa eSU;qvy Vsad
B-707 manual tank distribution valves shall not be opened until the tank load forj.k okYo rc rd ugha [kksyk tk,xk tc rd Vsad yksM forj.k ekywe uk gks½
distribution is known).

56 57
QC check Test “F” & “G” to be performed on the line sample drawn from the tank sisanh vkSj fQYVj ekfuVj oslsy ;k fQYVj okVj lai ds vkmVysV ls fy, x, ykbZu uewus dk DokyhVh
bottom and outlet of the filter monitor vessel or filter water sump. When airline psd VsLV ^,Q* ,oa ^th* fu”ikfnr fd;k tk,A tc ,vjykbZu dk izfrfu/kh ;g lwfpr dj
representative advises that delivery can start, engage pump, open flow valves fd fMyhojh ‘kq# dh tk ldrh gS rks iai pkyw djsa] izokg ‘kq# djus ds fy, ¶yks okYo [kksysa
and actuate deadman control to start flow. Gradually advance engine speed vkSj MsM eSu daVªksy pkyw dj nsaA /khjs&/khjs okafNr izokg nj ds fy, batu xfr fu;a=.k c<k,aA ;fn ;g
control to the desired flow rate if this function is not automatic. dk;Z Lopkfyr u gksA
Perform quality control checks on line sample drawn downstream of the filter
water separator or filter monitor before commencement of refueling. fj¶;wfyax ‘kq# djus ls igys fQYVj okVj lsijsVj ;k fQYVj ekfuVj ds MkÅu Lvªhe ls fy, x,
ykbZu uewus ij xq.koRrk fu;a=.k tkap fu”ikfnr djsaA
The showing of the sample and micro detector capsule check results to the airline
representative is desirable to facilitate the acknowledgment of acceptance of a foeku fMyhojh jlhn esa ikuh ,oa d.k eqDr fMyhojh ds Lohdk;Zrk dh vfHkLohd`fr dks lqxe
water and particulate free delivery in the Aircraft Delivery Receipt. cukus ds fy, ,vjykbZu ds izfrfuf/k dks uewuk vkSj ekbØks fMVsDVj dSIlwy pSd ifj.kke fn[kkuk
okaNuh; gSA
Hand hold open deadman control throughout fuelling and maintain a clear view
of the dispenser control panel and aircraft fuelling points. Where deadman laiw.kZ ¶;wfyax ds nkSjku le; [kqy MSMeSUk daVªksy dks gkFk ls diM+s jgsa vkSj fMLisalj daVªksy iSuy
timers are installed, the deadman should be actuated in frequency with the rFkk foeku ¶;wfyax esa vkus okyh ck/kk ls cpus ds fy, MSMeSu dh lsfVax ds lkFk ckjackjrk esa ‘kq#
setting to avoid interruption to the fuelling; djuk pkfg,A
Note: All the Electrical deadman systems include a deadman override. This
should be preferably of the spring loaded, push button type. In case no spring
uksV % lHkh fon~;qr MSM eSu iz.kkfy;ksa esa MSMeSu vksoj jkbZM ‘kkfey gSaA ;gh ojh;rk ds rkSj ij fLizax
return deadman override switches are used the same need to be properly yksMsM] iq’k cVu izdkj dk gksxkA ;fn dksbZ fLiazx fjVuZ MSM eSu vksoj jkbZM fLop iz;qDr u dh xbZ
sealed in the inoperative position at all times other than for emergency use. gks rks vkikrdkyhu mi;ksx ds vykok gj le; bls vizpkfyr fLFkfr esa mi;qDr rjg ls lhy
Whenever used during refueling, it should be continuously attended by a fd;k tkuk vko’;d gSA fj¶;wfyax ds nkSjku tc dHkh iz;qDr gks rks fdlh fj¶;wfyax izpkyd @
refueling operator/supervisor. Deadman over ride switch should be used only i;Zos{kd }kjk bls ges’kk vVsaM fd;k tkuk pkfg,A MSM eSu vksoj jkbZM fLop dsoy lrr fj¶;wfyax
for completing the ongoing refueling and the deadman should be repaired iw.kZ gksus ds fy, gh iz;qDr dh tk, vkSj vxyh fj¶;wfyax ds fy, ys tkus ls igys MSM eSu dh
before it is taken for the next refueling. ejEer dh tk,A
During fuelling occasionally check vehicle & delivery hoses for leaks, aircraft fuel ¶;wfyax ds nkSjku dHkh&dHkh okgu dh tkap djsa] yhdst ds fy, fMyhojh gkslksa dh tkap djsa] vksoj
vent for overflow & monitor refueller gauges for proper operation within limits, ¶yks ds fy, foeku ds ¶;wy osaV dh tkap djsa vkSj lhek ds Hkhrj mi;qDr izpkyu ds fy, fj¶;wyj
particularly differential & fuel sense pressures. Be alert & respond to instruction xst ekfuVj djsa] fo’ks”k #i ls fMQjsfUl;y vkSj ¶;wfyax ncko fjdkMZ djsaA lrdZ jgsa vkSj
from airline representative or to situations requiring emergency action.
,vjykbZu ds izfrfuf/k ds vuqns’kksa ij /;ku nsa ;k vkikrdkyhu dk;Zokgh ds fy, visf{kr fLFkfr;ksa
Adjust engine speed as required by delivery conditions. ij /;ku nsaA

On completion of fuelling & after confirmation from airline representative, fMfyojh fLFkfr;ksa n~okjk ;Fkk visf{kr batu dh xfr lek;ksftr djsaA
disengage pump & accurately record meter totalizer readings.
¶;wfyax iwjh gksus ij vkSj ,vjykbZu ds izfrfuf/k ls laiqf”V ij iai can dj nsa rFkk ehVj VksVykbtj
jhfMax dks lgh&lgh fjdkMZ djsa
58 59
Perform after fuelling quality control check Test “F” and Test “G” on sample fQYVj okVj lsijsVj ;k fQYVj ekfuVj oslsy ds vkmVysV dh vksj ls vkgfjr uewuksa dh ¶;wfyax
drawn from the filter water separator sump or from the outlet side of the filter ds ckn xq.koRrk fu;a=.k tkap VsLV ^,Q* vkSj ^th* fu”ikfnr djsaA
monitor vessel.
ukWty fMLdusDV djsa vkSj MLV doj yxk,a] gkslsls dks okil yxk,a vkSj gksYMjksa esa lqjf{kr <ax
Disconnect nozzles & attach dust covers; retrieve hoses and securely store ls ukWty yxk nsaA tc rd ,vjykbZu ds izfrfu/kh ,MkIVj vkfn dh tkap iwjh u dj ysa rFkk iSuy
nozzles in holders. Do not remove ladders until airline representative has
completed his check of the adapters, etc. and has completed panel work.
dk;Z iwjk u dj ysa rc rd lh<+h u gVk,aA

Obtain the required signature from the Airline representative in the ADR. ,Mhvkj esa ,vjykbZu ds izfrfuf/k dk visf{kr gLrk{kj izkIr dj ysaA

Disconnect and retrieve bonding and grounding wires and ensure that all hoses ckafMax ,oa xzkmafMax ok;j dks fMLdusDV djsa vkSj okil yk,a rFkk lqfuf’pr djsa fd lHkh gkslsl
are stowed and that no items are left behind. yxs gksa rFkk dksbZ Hkh en NwV u tk,A
Before removing dispenser at the completion of the fuelling, ensure, perform a ¶;wfyax iwjk gksus ij fMLisalj gVkus ds igys okgu ds vklikl laiw.kZ “360 degree” pDdj yxk;sa
final check, including a complete “360 degree” walk around the vehicle to vkSj vafre tkap rd fu”ikfnr djsaA rkfd ;g lqfuf’pr fd;k tk lds fd foeku ds ¶;wy dSi
ensure that aircraft fuel caps have been re-fitted, that the fuelling vehicle is fQj ls fQV fd, x, gSa] ;g fd ¶;wfyax okgu foeku ls Bhd rjg ls
properly disconnected from the aircraft and that all equipment is stowed
correctly. Ensure that all hoses & ladder are properly stowed.
fMLdusDV fd;k x;k gks rFkk lHkh midj.k Bhd rjg ls yxk;s x, gksaA lqfuf’pr djsa fd lHkh
Disconnect and retrieve bonding and grounding wires and ensure that no items gkslsl vkSj lh<+h Bhd rjg ls fQDl dh xbZ gksA
are left behind.
¶;wfyax izpkyuksa ds vko’;d fooj.kksa ds lkFk eksckbZy midj.k xq.koRrk fu;a=.k vkSj ¶;wfyax
Mobile Equipment Quality Control and Fuelling Log QF-401 to be updated with ykWx D;w ,Q & 401 dks viMsV fd;k tk,A
necessary details of the fuelling operations.
fj¶;wyj dks vkxs dh fn’kk esa pyk,a] ;fn HkhM+&HkkM+ ds dkj.k ihNs ys tkuk vko’;d gks rks nks
Drive refueller off moving in a forward direction; if reversing is necessary due to xkbZM dh lgk;rk yh tk,A
congestion, the assistance of two (2) guide men shall be obtained.
;fn fj¶;wfyax ds nkSjku vkikrdkyhu fLFkfr esa czsd baVjykWd ;k MsM eSu vksoj jkbZM lhy VwV
Incase the Brake interlocks or Deadman Overide seal is broken in emergency tk, ;k midj.k esa dksb vU; =qfV @ vlkekU;rk ik;h tk, rks bldh lwpuk] lwpuk ykWx cqd esa
situation or any other defect/abnormality is seen in equipment during refuelling
fjdkMZ dh tk,A
information of same shall be recorded in Officers’ Information Log Book.

60 61
13. Overwing fuelling 13. vksojfoax ¶;wfyax

The following special precautions shall be adhered to for overwing fuelling: vksojfoax ¶;wfyax esa fuEu fo’ks”k lko/kkfu;ka cjrh tk,a %
For fuellings attended by the flight crew or aircraft operator, ensure there is a foeku ds Øw ;k foeku ds izpkyd }kjk ¶;wfyax vVsaM djus ij lqfuf’pr djsa fd ¶;wy xzsM fMVsy ;k
fuel grade decal or other sign writing around or adjacent to the aircraft fill vklikl vU; fyf[kr fu’kku ;k foeku ds lVs fQy fNnz ls ftlls foeku esa iz;qDr bZa/ku ds xzsM
aperture to identify clearly the grade of fuel to be used in this aircraft. dk Li”V #Ik ls irk yxk;k tk ldsA
It is preferable that details are received in writing with due endorsement from
the airline representative as per QF-407 Refuelling Request. d`i;k lqfuf’pr djsa dh ,vjykbZu ds izfrfuf/k ds fu;r fyf[kr i`”Vkadu ls D;w ,Q &407
fj¶;wfyax vuqjks/k ds vuqlkj fooj.k izkIr fd;k gS ;k ughaA
If there is no grade marking on the aircraft or if it is a non schedule flight, fueling
shall not commence until a Refueling Request (QF-407) reconfirming grade of the ;fn foeku ij fdlh xzsM dk fu’kku u gks ;k ;g dksbZ xSj vuqlwfpr foeku gks rks fj¶;wfyax vuqjks/k
fuel required has been filled/completed, by airline representative/operator. ¼D;w ,Q&407½ tks ,vjykbZu ds izfrfu/kh @ izpkyd }kjk visf{kr bZa/ku ds xzsM dh fQj ls iqf”V
djrk gks] dh izkfIr rd ¶;wfyax izkjaHk ugha dh tk,xhA
If it is necessary to climb onto any part of the aircraft to gain access to fill points,
do not wear footwear with protruding nails or studs since these may cause ;fn HkjkbZ fcanqvksa rd igWqapus ds fy, foeku ds fdlh fgLls esa p<+uk vko’;d gks rks daVhys ;k
damage to the wing surface of the aircraft. dhynkj twrs u igus D;ksafd blls foeku ds foax i`”V dks {kfr igaqp ldrh gSA
Do not carry loose items such as pens, pencils or loose change in the pockets of
shirts or jackets since these may fall into the aircraft tanks.
ywt phts tSls dye] isafly] ‘kVZ ;k tSdsV ds tscksa esa u ys tk,a] ;s foeku ds Vsad esa fxj ldrh gSaA

Ensure the grade of fuel is correct for the aircraft. Nozzle spouts used for fuelling lqfuf’pr djssa dh bZa/ku dk xzsM foeku ds fy, Bhd gksA tsV foeku dh ¶;wfyax ds fy, iz;qDr ukWty
jet aircraft must be of the flattened type with a major axis dimension of at least LikmV pkSMs+ izdkj ds gksa] ftudk /kwjh dk vk;ke de ls de 67 feeh- dk gks rkfd xSl pkgus okys
67mm to prevent misfuelling of aircraft requiring Avgas. foekuksa dh xyr ¶;wfyax jksdh tk ldsA

However, few jet aircraft have apertures too small to accept a 67mm dimension gkykafd dqN tsV foekuksa dk fNnz bruk NksVk gksrk gS fd 67 feeh- vk;ke dh Lohdk;Zrk ds fy,
& some AVGAS aircraft have apertures large enough to accept 67mm nozzles. NksVs gksrs gSa vkSj dqN voxkl foekuksa dk fNnz 67 feeh- ukWty Lohdk;Z djus ds fy, cgqr cM+k gksrk
It is therefore essential to have the Refuelling Request duly filled before the gSA vr,o fj¶;wfyax ‘kq# gksus ds igys fj¶;wfyax vuqjks/k fof/kor Hkjk tkuk vko’;d gSA
commencement of the refuelling.
;fn iz;ksT; gks] rks foax ds ‘kh”kZ dksus ls foax ds ‘kh”kZ {ks= esa tk,aA /;ku j[ksa fd fuf”kn foax {ks=ksa esa
Ascend, if applicable, to wing top area from wing leading edge. Take care not to
u tk,a ;k u Vgysa] fo’ks”k #Ik ls fdukjs ds ekxkZas ;k ¶ySiksa ijA
step or walk on prohibited wing areas, particularly the trailing edge or flaps.

Use ladders with padded ends and use mats to protect wing leading edges. xnnhnkj lhf<+;ksa dk iz;ksx djsa vkSj foax dh vksj tkus okys fdukjksa dh lqj{kk ds fy, pVkb;ksa dk
iz;ksx djsaA
Do not route hoses over trailing edges.
fdukjksa ds ekxksZa ij gkslsl u ys tk,aA

62 63
Position hose on the ladder, not along side. Ensure that mats protect wing edge gksl dks lh<+h ij j[ksaA lqfuf’pr djsa fd gksl ls foax ds fdukjksa dh j{kk ds fy, pVkb;ksa dk iz;ksx
from hoses. djsaA
On all aircraft fuelled with overwing nozzles, it is necessary to avoid: vksojfoax ukWty ls bZ/ku Hkjus okys lHkh foekuksa ij fuEu ls cpuk vko’;d gS&
1.Mechanical damage to the floor of the aircraft tank from:- vf/kd yackbZ dk ukWty LikmV ;k
o Having a nozzle spout of excessive length or
o Having an excessively powerful jet of product from the nozzle;
ukWty ls mRikn ds vR;f/kd ‘kfDr’kkyh tsV

2.Static electricity build up from splash filling, this shall be prevented by LFkSfrd fo|qr dks tks LyS’k fQfyax ls mRiUu gksrh gS ;g lqfuf’pr djds ;g jksdk tk ldrk gS fd
ensuring if the ends of nozzle used for a particular aircraft reaches within few fdlh fo’ks”k foeku ds fy, iz;qDr ukWty dk vafre fljk foeku ds Vsad ds Q’kZ ds dqN bapksa ds Hkhrj
inches of floor ofaircraft tank or surface of product already in tank or filling rd igWqaprk gks ;k Vsad esa igys rd ekStwn mRikn ds i`”V rd ;k tc rd mRikn }kjk ukWty dk fljk
takes place at reduced flow until end of the nozzle is covered by product; <d u fy;k tkrk gks rc rd fQfyax de izokg ij dh tk,A
Check if overwing nozzles do not have ratchet lugs or other mechanical devices tkap djsa fd vksoj foax ukWty esa jSpsV yXl ;k vU; ;kaf=d midj.k u gksa] ftlls ukWty [kqyk jgsA
to hold nozzle open. Overwing nozzles shall not be wedged open under any fdlh Hkh fLFkfr esa vksojfoax ukWty [kqyk u NksM+k tk,A igWqap nokj [kqyus ds igys foeku ds /kkrq ds
circumstance; Hkkx ls ukWty dks Li’kZ djk,aA
Touch nozzle to a bare metal part of the aircraft before opening the access door.

Bond the overwing nozzle to the aircraft if this is possible before removing the fill
fQy dSi gVkus ds igys ;fn laHko gks rks vksojfoax ukWty dks foeku ls cka/k nsaA
cap. Maintain bonding until the cap is replaced.
foeku ds izpkyd dh fofufnZ”V ‘krksZa dks iwjk djus ds fy, ¶;wfyax nj lek;ksftr djsaA c’krZs
Adjust fuelling rate to meet aircraft operator’s specified conditions provided izpkydksa dh vis{kk,a bl eSU;qvy dh izfØ;kvksa ls u Vdjk,aA
operator’s requirements do not conflict with the procedure in this manual.
cjlkr ;k rqQku esa ukWty fQy ds eqWag dks <dus ds fy, ,d LoPN okVj izwQ IykfLVd ‘khV miyC/k
Have available a clean waterproof tarpaulin to cover nozzle and fill opening j[ksaA tsV foeku dh ¶;wfyax ds le; peksbZ peM+k;k fdlh vU; izdkj ds Lvªsuj dk mi;ksx u djasA
during rains or thunder storms. Do not use a chamois leather or any other type of
strainer at the aircraft fill opening when fuellingjet aircraft. ‘kq”d ;k /kwy esa izkd`frd jsls ls fufeZr LoPN] fcuk jks,a ds diM+s ls ukWty vkSj fQyj fNnz ds chp
dh fjDrrk dks can djuk vko’;d gksxkA
In wet or dusty conditions, it may be necessary to block gap between nozzle &
filler or fix with a clean, lint-free cloth made from natural fibers.
lqfuf’pr djsa fd Vsad esa bl izfdz;k ds fy, i;kZIr fNnz gksaA
Ensure the tank is vented adequately for this procedure;
¶;wfyax iSuy xstksa esa ,vjykbZu ds izfrfuf/k ds lkFk fudV dk leUo; vuqjf{kr djsaA
Maintain close coordination with airline representative at fuelling panel gauges.
;fn foeku ds VSad ds mRikn ds fofunsZ’ku dh tkudkjh u gks rks fM¶;wy mRikn vyx ls LVksj fd;k
If specification of product in aircraft tank is unknown, defuelled product shall tk;sA
be segregated.

64 65
14. Defuelling of aircrafts 14. foeku dh fM¶;wfyax

If the specification of product in aircraft tank is unknown, defuelled product shall ;fn foeku ds VSad ds mRikn ds fofunsZ’ku dh tkudkjh u gks rks fM¶;wy mRikn vyx ls Lvksj
be segregated. fd;k tk;sA
Before defuelling, the samples from the Aircraft tanks shall be taken and
examined in a clear glass bottle & all water drained till a bright & clear sample
fM¶;wfyax ds igys foeku ds Vsad dk uewuk fy;k tk,xk vkSj Li”V ‘kh’ks dh cksry esa tkap dh
is obtained by the Airline /Oil Co. The sample shall then be checked for Test ‘H’ tk,xh rFkk tc rd ,vjykbZu @ rsy daiuh }kjk pedhyk vkSj Li”V uewuk u izkIr dj fy;k tk,
and Test “G”. rc rd mRikn esa mifLFkr ikuh fudkyk tk,A rRi’pkr VsLV ^,p* vkSj VsLV ^th* ds fy, tkap dh
tk,A
Refueller Tank bottom sample shall also be checked for Test F and Test G before
defueling the product from the Aircraft. foeku ls mRikn dh fM¶;wfyax ds igys fj¶;wyj Vsad ds isanh ds uewus dh Hkh VsLV ,Q vkSj VsLV th ds
fy, tkap dh tk,A
After defuelling, the product in the refueller shall be settled for 10 minutes and
a tank bottom sample shall be tested for Test ‘F’ and Test G
fM¶;wfyax ds ckn fj¶;wyj dk mRikn 10 feuV rd fLFkj fd;k tk, vkSj VsLV ,Q vkSj VsLV th ds
If a sample from the Aircraft tanks prior to the defuelling is found to be suspect fy, tkap dh tk,A
and if the defueling is still to be done, the product shall be defuelled directly into
the receptacle, segregated & downgraded. Suspect fuel is defined as follows: ;fn fM¶;wfyax ds igys foeku ds Vsad dk uewuk lansgkLin ik;k tk, vkSj rHkh Hkh fM¶;wfyax dh
Fuel known to be contaminated.
Unknown grade or type of fuel/specification.
tkuh gks rks mRikn lh/ks ik= /kkjd esa fM¶;wy fd;k tk,] vkSj MkÅuxzsM fd;k tk,A lansgkLin bZ/ku
Fuel defuelled due to accident or other unusual conditions. fuEu rjg ifjHkkf”kr fd;k tkrk gS :
Mixture of different grades of Aviation Fuels. bZ/ku feykoVh gSh
xzsM dh tkudkjh u gksuk ;k bZ/ku ds izdkj @ fofunsZ’ku dh tkudkjh u gksuk
In case an aircraft holding dormant fuel of acceptable specifications for more bZ/ku nq?kZVuk ds dkj.k fM¶;wy fd;k x;k gks ;k vU; vlkekU; fLFkfr;ksa esa
than 2 months, either fuel shall be segregated or subjected to Test ‘D’ before
defuelling. No defuelled product shall be taken back into the hydrant system or foekuu bZ/ku ds fofHkUu xzsMksa dk feJ.kA
into the storage tanks at the Aviation Service Facility.
If defuelling of the suspect fuel defined in clause is done by the refuelling ;fn foeku esa Lohdk;Z fofunsZ’kuksa okyk bZa/ku gS vkSj nks eghuksa ls vf/kd MkSjesUV gks rks ;k rks bZa/ku
equipment, the equipment used shall be thoroughly drained and flushed with dks vyx djsa ;k fM¶;wfyax midj.k dks vPNh rjg lkQ fd;k tk, vkSj fQj ls mi;ksx djus ds
fresh product before reuse. The drained & flushed product shall be downgraded. igys u, mRikn ls lkQ fd;k tk,A fuFkjk vkSj lkQ fd;k gqvk mRikn MkmuxszM fd;k tk,A
Usually the defuelled product should be returned to the same aircraft or to the lkekU;r;k ;fn laHko gks rks fM¶;wy mRikn mlh foeku esa okil fd;k tkuk pkfg, ;k mldh
same aircraft operator. foeku izpkyd dks okil fd;k tkuk pkfg,A
The applicable records like QF-402 the Mobile Equipment Quality control and
Refuelling Log should be updated while undertaking the defueling operation. fM¶;wfyax izpkyu djrs le; iz;ksT; fjdkMZ tSls D;w ,Q&402 eksckby midj.k xq.koRrk fu;a=.k
,oa fj¶;wfyax ykWx viMsV djuk pkfg,A

66 67
Defuelling - Aircraft Accident: fM¶;wfyax & foeku dh nq?kZVuk
If aircraft runs off runway or apron, or sustains any other accident on ground, it ;fn dksbZ foeku juos ;k vizku ls uhps mrj tk, ;k ry ij dksbZ vU; nq?kZVuk gks tk, rks ,slh
may be necessary to offload large quantities of fuel under conditions where fLFkfr esa bZa/ku dh Hkkjh ek=k dks vkWQyksM djuk vko’;d gksxk] tgka foeku dk bZa/ku iai mi;ksxh
aircraft fuel pumps may not be usable. Aircraft may also be located in area
inaccessible by normal vehicle operations.
ugha gksxkA foeku lkekU; okgu izpkyu }kjk u igaWapus okys {ks= esa Hkh fLFkr gks ldrk gSA

Under such conditions suitable auxiliary pumping equipment & extra hoses may bu ifjfLFkfr;ksa esa mi;qDr lgk;d iafiax midj.k vkSj vfrfjDr gksl foeku dks vuyksM djus ds
be required to unload aircraft & move fuel to point where it can be carried away fy, vko’;d gkssaxs vkSj bZa/ku dks ,sls LFkku ij ys tkuk gksxk tgka bls fj¶;wyjksa ;k VSSad Vªdksa }kjk ys
by refuellers or tank trucks. tk;k tk ldsxkA
Volume of fuel involved may be high, number of such vehicles could be required. pWawfd bZ/ku dk vk;ru vf/kd gksxk vr,o ,sls vusd okgu dh t#jr gksxhA ;g ,d vlkekU;
This is an unusual occurrence & it may be difficult for HPCL to do it alone. fLFkfr gksxh vkSj ,p ih lh ,y ds fy, vdsys ,slk dj ikuk dfBu gksxkA vr% vU; mn~;ksx lnL;ksa
Assistance from & to other industry members should be given & taken. Such ls lgk;rk ysuh vkSj nsuh pkfg,A ,slh fM¶;wfyax , Mh vkj esa LI”V #I ls uksV dh tkuh pkfg,
defuellings should be clearly noted on ADR.

68 69
15. VVIP aircraft refuelling 15. vfr fof’k”V egRoiw.kZ O;fDr;ksa ds foeku dh fj¶;wfyax izfØ;k%

General: lkekU;
•Aircraft used to transport Very Very Important Person (V.V.I.P) is termed as vfr fof’k”V egRoiw.kZ O;fDr;ksa ds ifjogu ds fy, iz;qDr foeku dks oh oh vkbZ ih foeku dgk
V.V.I.P aircraft. Aircraft used may be operating as a regular commercial flight or tkrk gSA ;g fu;fer okf.kfT;d foeku ;k dsoy oh oh vkbZ ih ds fy, izpkfyr fo’ks”k foeku ds
special flight operated only for V.V.I.P. The following are designated as VVIPs: #i esa izpkfyr dh tkrh gSA fuEu O;fDr;ksa dks ohoh vkbZih ds #Ik esa inukfer fd;k x;k gSA
o President of India. o Vice President of India. Hkkjr ds jk”Vªifr Hkkjr ds mi&jk”Vªifr
o Prime Minister of India. o Any Foreign dignitary of Equivalent Status. Hkkjr ds iz/kkuea=h leku vksgns dk dksbZ fons’kh fof’k”V O;fDr
Refuelling of a V.V.I.P. aircraft is a special type of operation where, due to vfr fof’k”V O;fDr;ksa ds foeku dh fj¶;wfyax ,d fo’ks”k izdkj dk izpkyu gS tgka foeku ds cksMZ ds
importance of the persons aboard the aircraft, certain security precautions have O;fDr;ksa dh egRrk ds dkj.k dfri; lqj{kk lko/kkfu;ka yh tkuh gksrh gSaA ftlds fy, fo’ks”k
to be taken, which necessitates adoption of special procedures. izfØ;k,a viukuk vko’;d gSA
Programme of refuelling V.V.I.P., aircraft is conveyed by the airline concerned vfr fof’k”V O;fDr;ksa ds foeku ds fj¶;wfyax dk dk;ZØe lacaf/kr ,vjykbZu }kjk de ls de nks
minimum 2 days in advance. fnu igys lwfpr djuk pkfg,
DGCA is to be intimated of the programme and coordination maintained Mh th lh , dks dk;ZØe lwfpr fd;k tk, vkSj dk;ZØe ns[kus ds fy, Mh th lh , }kjk ukfer
with the officer nominated by DGCA to oversee the programme. vf/kdkjh ds lkFk leUo; LFkkfir fd;k tk,
List of officers who will attend refuelling operation (including those from DGCA) fj¶;wfyax izpkyuksa ¼Mh th lh , lfgr½ dks vVsaM djus okys Øw vf/kdkfj;ksa dh lwph fo’ks”k oh oh vkbZ
is given to Security Branch/Protection Group of CID for issuing VVIP passes. ih ikl tkjh djus ds fy, lh vkbZ Mh ds lqj{kk ‘kk[kk @ lqj{kk lewg dks nh tk,A

One copy of the list of personnel is also sent to the Airline concerned. dfeZ;ksa ds lwph dh ,d izfr lacaf/kr ,vjykbZu dks Hkh Hksth tk,A

Refuelling by a Refueller: fj¶;wyj }kjk fj¶;wfyax


Two days prior to the refuelling, one refueller & storage tank are designated for fj¶;wfyax ds nks fnu igys ,d fj¶;wyj vkSj ,d HkaMkj.k Vsad oh oh vkbZ ih fj¶;wfyax dk;ZØe esa
use in VVIP refuelling programme. One standby refueller is also designated. iz;qDr djus ds fy, iz;qDr dh tk,xhA ,d vfrfjDr fj¶;wyj Hkh inukfer fd;k tk,xkA

The refuellers are topped up from the storage tank identified. fj¶;wyjksa dks oh oh vkbZ ih fj¶;wfyax ds fy, r; HkaMkj.k Vsad ls VkWi vi fd;k tk,A
Mh th lh ,] lh vkbZ Mh vkSj ,l ih th ¼;fn ykxw gks½ dh mifLFkfr esa nks yhVj ds pkj uewus
Four 2 litre samples (Composite of nozzle, tank and filter) are drawn from the
designated refuellers in the presence of DGCA, CID and SPG (if applicable).
¼ukWty] Vsad vkSj fQYVj½ inukfer fj¶;wyjksa ls fy, tk,aA ,d uewuk izR;sd Mh th lh ,] ,l ih
One sample each is kept by DGCA, SPG and HPCL. The fourth sample is sent to th vkSj ,p ih lh ,y j[ksxkA pkSFkk uewuk cSap QkesZ’ku VsLV ¼VsLV ch½ ds fy, lh vkbZ Mh dh lqj{kk
the nearest HPCL Lab for Batch Formation Test (Test B) under CID protection. esa ,p ih lh ,y ds fudVre iz;ksx’kkyk esa Hkstk tk,xkA

The refuellers are circulated & tested for proper functioning. The readings of the fj¶;wyj ifjpkfyr fd, tk,a vkSj mi;qDr dk;kZRedrk ds fy, tkap dh tk,A ¶yksehVj dh jhfMax
flow meter(s) are noted & recorded. Millipore Match Weight and Visual tests are uksV dh tk, vkSj fjdkMZ dh tk,A feyhiksj eSp osV vkSj fctqvy ijh{k.k fd, tk,aA feyhiksj eSp
performed. The Millipore Match Weight cartridge is sent to HPCL lab for testing osV dkfVZt esa lh vkbZ Mh dh lqj{kk ijh{k.k esa ,p ih lh ,y ySCk esa ijh{k.k dks Hkstk tk,A feyhiksj
under CID protection. The Millipore Visual membranes are kept by SPG. fctqvy esEcszu ,l ih th ds ikl j[kh tk,A

70 71
The refuellers and the storage tank are sealed at all outlet and inlet points. fj¶;wyjksa vkSj HkaMkj.k Vsadksa ds lHkh vkmVysV vkSj buysV fcanqvksa dks lhy fd;k tk,A Vsad vkSj
CID guards are posted for security of the tank and the refuellers. fj¶;wyjksa dh lqj{kk ds fy, lh vkbZ Mh ds xkMZ rSukr fd, tk,aA
Test reports of the Test B and Millipore Gravimetric test are received from the VsLV ch vkSj feyhiksj xzsohesfVªd VsLV dh fjiksVZ iz;ksx’kkyk ls izkIr djsaA fjiksVksZ dh izfr;ka ,l ih
Lab. Copies of the reports are given to SPG, DGCA and CID.
th] Mh th lh , vkSj lh vkbZ Mh dks nh tk,A
On the day of the refuelling, depending on schedule of departure of aircraft,
DGCA & CID officials are called & nominated refueller is taken towards aircraft fj¶;wfyax ds fnu] foeku ds izLFkku dk;ZØe ds vuqlkj Mh th lh , vkSj lh vkbZ Mh ds vf/kdkfj;ksa
at specified time. When aircraft is ready for refuelling, refueller is hooked to dks cqyk;k tk, vkSj ukfer fj¶;wyj dks fofufnZ”V le; ij foeku dh vksj ys tk;k tk,A tc
aircraft. Refuelling is then carried out as outlined earlier for any other refuelling. foeku fj¶;wfyax ds fy, rS;kj gks rks fj¶;wyj dks foeku ls tksM+ fn;k tk,A rRi’pkr fdlh vU;
fj¶;wfyax ds fy, tSlk igys mYys[k fd;k x;k gS] fj¶;wfyax dh tk,A
3 samples of product are drawn from nozzles before & after refuelling. They are
taken in 2 litre Aluminium Sample tins & placed in wooden boxes, sealed by fj¶;wfyax ds igys vkSj ckn esa ukWty ls mRikn ds rhu uewus fy, tk,aA uewus nks yhVj ds
HPCL, DGCA & CID, labeled with particulars & signed by officials of above ,Y;qfefu;e uewus fVu esa fy, tk,a vkSj ydM+h ds ckWDl esa j[ks tk,aA ,p ih lh] Mh th lh , vkSj
bodies. lh vkbZ Mh }okjk lhy fd, tk,aA lacaf/kr fooj.k ds ysoy yxk, tk,a rFkk mi;qZDr fudk;ksa ds
vf/kdkfj;ksa }kjk gLrk{kj fd;k tk,A
Samples are distributed among HPC, DGCA and CID. They are retained by
HPCL for 10 days at ASF.
uewus ,p ih lh] Mh th lh , vkSj lh vkbZ Mh esa forfjr fd, tk,aA ,d uewuk , ,l ,Q esa 10
Refueller is isolated from normal use. Oral confirmation of safe arrival of VVIP fnuksa rd ,p ih lh ,y }kjk j[kk tk,xkA
aircraft at destination is taken from airlines and DGCA informed. The refueller is
then put back in normal operation. fj¶;wyj dks lhYM gkyr esa lkekU; mi;ksx ls vxys j[kk tk,xkA xarO; ij oh oh vkbZ ih foeku
ds lqjf{kr vkxeu dh ekSf[kd laiqf”V ,vjykbZu ls yh tk, vkSj Mh th lh , dks lwfpr fd;k tk,A
Refuelling by dispenser: rRi’pkr fj¶;wyj dks lkekU; izpkyu esa yxk fn;k tk,A
1 dispenser is nominated for carrying out refuelling operations & another is
nominated as standby & this is communicated to DGCA, IB & VVIP Security Cell. fMLisalj }kjk fj¶;wfyax
Storage tank is designated to deliver into Hydrant System on day of refuelling. fj¶;wfyax izpkyu ds fy, ,d fMLisalj ukfer fd;k tk, vkSj nwljk vfrfjDr fMLisalj ds #i esa
ukfer fd;k tk, vkSj bls Mh th lh ,] vkbZ ch vkSj vfr fof’k”V O;fDr;ksa ds lqj{kk Vhe dks lwfpr
Two days prior to refuelling, three 2 litre samples (All level) are drawn from fd;k tk,A fj¶;wfyax ds fnu gkbMsaªV iz.kkyh esa fMyhojh ds fy, HkaMkj.k Vsad inukfer fd;k tk,
designated tank in the presence of DGCA, CID and SPG (if applicable).
One sample each is kept by DGCA & SPG. Third sample is taken by CID & sent to
nearest HPCL Lab for Batch Formation Test (Test B) under CID protection. Three fj¶;wfyax ds nks fnu igys 2 yhVj ds rhu uewus ¼vky ysoy½ Mh th lh ,] lh vkbZ Mh vkSj ,l ih
samples are taken from Hydrant Low point & tested as above (Batch Formation th ¼;fn ykxw gks½ ds mifLFkfr esa inukfer Vsad ls fy, tk,aA Mh th lh ,] lh vkbZ Mh vkSj ,l ih
Test). Designated tank is sealed and CID places a guard for security of the tank. th izR;sd }kjk ,d&,d uewuk j[kk tk,aA rhljk uewuk lh vkbZ Mh }kjk fy;k tk, vkSj lh vkbZ Mh
dh lqj{kk esa cSp QkeZs’ku VsLV ¼VsLV ch ds fy,½ fudVre ,p ih lh ,y iz;ksx’kkyk esa Hkstk tk,A
rhu uewus gkbMsaV ds yks IokabV ls Hkh fy, tk,a vkSj mi;qZDr ijh{k.k fd;k tk, ¼cSp QkesZ’ku VsLV½A
inukfer Vsad lhy fd;k tk, vkSj lh vkbZ Mh VSad dh lqj{kk ds fy, xkMZ j[ksA
72 73
On the day of refuelling, seal of the tank is broken in presence of DGCA, CID & fj¶;wfyax ds fnu Mh th lh ,] lh vkbZ Mh vkSj ,l ih th dh mifLFkfr esa VSad dh lhy rksM+h tk,A
SPG. Two dispensers (one as standby) are tested by circulating product from nks fMLisalj dh ¼,d vfrfjDr #Ik ls½ inukfer VSad ls mRikn ldqZysV djds tkap dh tk,A ¶yks
designated tank. Readings of flow meter are noted & recorded. Millipore Match ehVj dh jhfMax uksV dh tk, vkSj fjdkMZ dh tk,A feyhiksj eSp osV vkSj fctqvy ijh{k.k fd, tk,aA
Weight and Visual tests are performed. Millipore Match Weight cartridges are lh vkbZ Mh dh lqj{kk esa feyhiksj eSp osLV dkfVªZfjtst dks ijh{k.k ds fy, iz;ksx’kkyk esa Hkstk tk,A
sent to the Lab for testing under CID protection. The Millipore visual membranes feyhiksj fotqvy esaczsu ,l ih th ds ikl j[kh tk,aA mRikn ldZqysV djrs le; ldqZysV fd;k x;k
are kept by SPG. While circulating product, the circulated product is not taken
mRikn inukfer VSad esa okil u fy;k tk, cfYd , ,l ,Q esa fdlh vU; VSad esa j[kk tk,A
back into the designated tank but received into any other tank at the ASF.

The dispensers are then sealed at all outlet and inlet points. The designated tank rRi’pkr fMLisaljksa ds lHkh vkmVysV vkSj buysV fcanqvksa dks lhy dj fn;k tk,A inukfer Vsad
continues in delivery to the Hydrant System so that the line quantity in the Hydrant gkbMsaªV iz.kkyh esa fMyhojh tkjh j[ks] rkfd gkbMsaªV ykbZu esa ykbZUk dh ek=k oh oh vkbZ ih fj¶;qfyax
line is replaced with product from designated tank before the VVIP refuelling. ds igys inukfer Vsad ls mRikn dks cnyk tk ldsA

Copies of the Batch Formation Test and Millipore Match Weight test reports are cSp QkeZs’ku VsLV vkSj feyhiksj eSp osV VsLV fjiksVZ dh izfr;ka Mh th lh ,] lh vkbZ Mh vkSj ,l ih
given to SPG, DGCA and CID. th dks nh tk,aA
On the day of refuelling depending upon the schedule of departure of the fj¶;wfyax ds fnu] foeku ds izLFkku dk;ZØe ij fuHkZj Mh th lh ,] lh vkbZ Mh ds vf/kdkfj;ksa dks
aircraft, DGCA and CID officials are called in and the nominated dispenser is cqyk;k tk, vkSj ukfer fMLisalj dks fofufnZ”V le; ij foeku dh vksj ys tk;k tk,A tc foeku
taken towards the aircraft at the specified time. When the aircraft is ready for fj¶;qfyax ds fy, rS;kj gks tk, rks fMLisalj dks foeku ls yxk fn;k tk,A rRi’pkr fdlh vU;
refuelling, the dispenser is hooked up to the aircraft. Refuelling is carried out as
outlined in procedure for aircraft refuelling.
fj¶;qfyax ds fy, tS;k igys mYys[k fd;k x;k gS] fj¶;qfyax dh tk,aA

Three nozzle samples are taken from the dispenser before start and after fj¶;qfyax ‘kq# gksus ds igys vkSj iwjh gksus ds ckn esa fMLisalj ls rhu ukWty uewus fy, tk,aA uewus
completion of refuelling. The samples are taken in 2 litre Aluminium Sample tins nks yhVj ds ,Y;qfefu;e uewus fVu esa fy, tk,a vkSj ydM+h ds ckWDl esa j[ks tk,aA
and placed in wooden boxes, sealed by HPC, DGCA and CID, labelled with
relevant particulars and signed by officials of the above bodies. ,p ih lh] Mh th lh , vkSj lh vkbZ Mh }kjk lhy fd;k tk,aA lacaf/kr fooj.k ds ysoy yxk, tk,a
rFkk mi;qZDr fudk;ksa ds vf/kdkfj;ksa }kjk gLRkk{kj fd;k tk,A
The samples are distributed among HPC, DGCA and CID. The samples are
retained by HPCL for ten days at the ASF. uewus ,p ih lh] Mh th lh , vkSj lh vkbZ Mh esa forfjr fd, tk,aA ,d uewuk , ,l ,Q esa 10
fnuksa rd ,p ih lh ,y }kjk j[kk tk,xkA
The dispenser is isolated from normal use. Oral confirmation of safe arrival of
the VVIP aircraft at the destination is taken from the Airlines and the DGCA
informed. The dispenser is then put back in normal operation.

74 75
16. Copper corrosion and silver corrosion tests 16- dkWij djkstu ,oa flYoj djkstu ijh{k.k izfØ;k%

a)A 1 litre bottom sample from the storage tank is drawn in a glass bottle. d½ 1yhVj uewuk HkaMkj.k Vsad ds ryh ls Xykls tkj esa fudkys
b)Preparation Of Strip (Common for both Copper and Silver) [k½ fLVªi rS;kj djus dh izfØ;k ¼dkWij ,oa flYoj nksuksa ds fy, ,d leku gksrh gS½
Remove all surface blemishes from all the six sides of the strip with flyhdku dkckZbM dkxt ls fLVªi ds lHkh N% rjQ dss i`”V ds /kCcs lkQ dj nsaA rkfd
silicon carbide paper sufficiently fine to accomplish the desired results.
okafNr ifj.kke izkIr gksA
Finish with 240 grade silicon carbide paper removing all marks that may
have been made by other grades of paper. 240 xszM ds flyhdku dkckZbM isij ls fQfu’k djsa vkSj vU; xzsM ds isisj }kjk cus
fu’kkuksa dks lekIr dj nsaA
Immerse strip in Iso-Octane till final polishing just before commencement
of test. VsLV izkjaHk djus ls igys vafre ikWfyf’kax rd fLVªi dks vkblks&vkDVsu esa Mqck nsaA
Remove the strip from the Iso-Octane and, holding by the fingers protected ,S’kySl fQYVj isij ls jf{kr vaxqyh ls idM+dj vkblks&vkDVsu ls fLVªi fudky nsa]
by ashless filter paper, polish first in the ends and then the sides with 150- igys var esa ikWfy’k djsaA rRi’pkr 150esl flfydku dkckZbM ls cxy lkQ djsaA
mesh silicon carbide grains picked up from a clean glass plate with a pad vkblks & vkDVsu dh cwnksa ls Hkhaxs Åuh diMs+ ds iSM ls lkQ Xykl IysV ls nksuksa
of cotton wool moistened with a drop of the Iso-Octane. dks mBk,aA
Wipe vigorously with fresh pads of absorbent cotton and subsequently
handle only with stainless steel forceps. lekfgr djus okys diM+s ds u, iSM ls [kwc iksNsa vkSj LVsuyl LVhy ds fpeVs ls
gSaMy djsaA
Clamp in the "Strip Vice" and polish the main surfaces of the strip by
rubbing the silicon carbide grains on cotton pads along the long axis of ^fLVªi okbZl* esa dl nsa vkSj fLVªi ds /kqjh dh vksj diM+s ds iSM ij flyhdku
the strip. dkckZbM ikmMj nksuksa ls jxM+dj fLVªi ds eq[; i`”V dks ikWfy’k djsaA
Clean all metal dust from the strip by wiping with fresh cotton pads until tc rd u;k iSM xank u gks rc rd u, diM+ksa ds iSMksa dks iksaNdj fLVªi ls /kkrq
a fresh pad remains unsoiled. dh /kwy lkQ djsaA
Immerse the strip in the sample as described below within one minute of vafre ikWfy’k ds ,d feuV ds Hkhrj tSlk fd uhps mYys[k fd;k x;k gS fLVªi dks
the final polish.
uewus esa Mqck nsaA
c) Test Method : Copper Test
x½ ijh{k.k dk rjhdk % dkWij ijh{k.k
30 ml of the sample is taken in the test tube and the copper strip placed in it.
VsLV V~;wc esa 30 feyh- dk uewuk ysa vkSj dkWij fLVªi blesa Mky nsaA
The test tube is then placed in the "Test Bomb".
rRi’pkr VsLV V;wc dks ^VsLV ce* esa j[k nsaA

76 77
"Test Bomb" is then placed in "Water Bath" maintained at 100+/-1degree rRi’pkr ^VsLV ce* dks 100 +1 fMxzh- ij vuqjf{kr ^okVj ckFk* esa 2 nks ?kaVs
Celsius for 2 hours +/- 5 minutes. 5 feuV rd j[ksaA
After the test period, remove the copper strip from the bomb and immerse ijh{k.k vof/k ds i’pkr ce ls dWkij fLVªi gVk nsa vkSj vkblks&vkDVsu esa Mqck nsaA
it in the Iso-Octane.
rRdky fLVªi fudky ysa] CyfVax }kjk fQYVj isij ls bls lq[kk nsaA
Withdraw the strip immediately; dry it with filter paper by blotting.
Tarnish caused on it after test is compared with ASTM chart for copper corrosion. ijh{k.k ds ckn dkWij djkstu fLVªi ij yxs /kCcksa dh rqyuk ,- ,l- Vh- ,e- (ASTM) pkVZ ls djsaA

The accepted limits for the tarnish of the copper strip is level 1 dkWij fLVªi ds /kCcksa dh Lohdk;Z lhek,a Lrj 1a gSaA

The frequency of this test is fortnightly for product in storage tanks. bl ijh{k.k dh ckjackjrk HkaMkj.k Vsadksa ds mRiknksa ds fy, ikf{kd ¼QksVZukbV½ gSA
d) Test Method: Silver Test ?k½ ijh{k.k dk rjhdk % flYoj ijh{k.k
Pour 250 ml of the sample into the clean test tube. 250 feyh- ds uewus dks lkQ VsLV V;wc esa MkysaA
Suspend the freshly polished strip from hook on the "Cold Finger Condenser" Xykl ØSMy ls ^dksYM fQaxj daMsalj* ij gqd ls ubZ ikWfy’k dh xbZ fLVªi dks yVdk nsaA
by means of the "Glass Cradle".
lko/kkuhiwoZd fLVªi vkSj daMsalj dks VsLV V;wc esa >qdk,aA
Carefully lower the strip and the condenser into the test tube.
Place the test tube in the "Water Bath" and maintain the temperature at 50 +/-
VsLV V;wc dks ^okVj ckFk* esa j[ksa vkSj 4 ?kaVs rd 50+1 fMxzh lsfYl;l ij vuqjf{kr
1 degree Celsius for four hours. djsaA

During the test, pass water through the"Cold Finger Condenser" to induce the ijh{k.k ds nkSjku rki fLV;fjax izsfjr djus ds fy, ^dksYM fQaxj daMsalj* ds ek/;e
thermal stirring. ls ikuh xqtkjsaA
At the end of the test period, remove the silver strip from the test tube and ijh{k.k vof/k ds var esa VsLV V~;wc ls flYoj fLVªi gVk nsa vkSj bls vkblks&vkDVsu
immerse it in the Iso-Octane. esa Mqck nsaA
Withdraw the strip immediately; dry it with filter paper by blotting. rRdky fLVªi fudky ysa] CykfVax }kjk fQYVj isij ls bls lq[kk nsaA
The silver strip is then removed & the tarnish caused on it after the test rRi’pkr flYoj fLVªi gVk nsa vkSj flYoj dksjkstu ds fy, ijh{k.k ds ckn bl ij
compared with the ASTM chart for silver corrosion. cus /kCcksa dh rqyuk , ,l Vh ,e pkVZ ls djsaA
The accepted limits for the tarnish of the silver strip are level 0. flYoj fLVªi ds /kCcksa dh Lohdk;Z lhek,a ^0* Lrj gSaA
The frequency of this test is fortnightly for product in storage tanks. HkaMkj.k VSadks esa mRikn ds ijh{k.k dh ckjackjrk ikf{kd ¼QksVZukbV½ gSA

78 79
17. Conductivity measure procedure 17. lqpkyd ekius dh izfØ;k %

a) PREPARATION OF SAMPLE: d) uewuk rS;kj djuk


The sample container (preferably a 1 litre metal container) should be cleaned &
rinsed with the fuel to be tested. After the sample for test has been withdrawn,
uewus dk daVsuj ¼ojh;rk ds rkSj ij 1 yhVj ds /kkrq dk daVsuj½ VsLV fd, tkus okys bZa/ku ls lkQ
wait approximately two minutes for charges in the fuel to dissipate. fd;k tkuk pkfg, vkSj /kks;k tkuk pkfg,A VsLV dk uewuk ysus ds ckn yxHkx nks feuV izrh{kk djsa
ftlls fd bZa/ku ds vkos’k fudy tk,A
b) TEST PROCEDURE:
Attach probe to bottom connector on conductivity meter.
[k) ijh{k.k dh izfØ;k
Depress MEASURE switch (M) with probe OUT of fuel sample. Reading should be lqpkydrk ehVj dh isanh ds dusDVj ls izksc layXu djsaA
000 +/- 001 in approximately 3 seconds. ehVj ds estj fLop dks mRikn uewuk esa fcuk Mkys nck;sa 3 lsds.M ckn fjfM+ax 000+001 gksuh pkfg,
If reading is outside limits, remove probe & recheck zero by depressing switch.
;fn jhfMax lhek ds ckgj gks rks izksc gVk nsa vkSj eku cVu nckdj fQj ls ‘kwU; tkap djsaA
If zero adjustment is okay without probe but not when probe is attached,
the probe should be thoroughly rinsed with isopropyl alcohol and allowed to air
dry before retesting for zero. ;fn fcuk izksc ds ‘kwU; lek;kstu Bhd gks ysfdu izksc layXu gksus ij Bhd u gks rks izksc dks
vkblksizksikby vYdksgy ls vPNh rjg /kks,a vkSj ‘kwU; dh fQj ls tkap djus ls igys gok esa lq[kk,aA
Depress CALIBRATE switch (C) with probe OUT of fuel sample. After 3
seconds, reading should be 10 times the probe calibration number +/- 005. mnkgj.k
For Example : d) ;fn izksc la[;k = 40 ehVj jhfMax = 400+ /-5 ;k 395 ls 405
a) If Probe No. = 40Meter Reading = 400 +/- 5 or 395 to 405 [k) bZ/ku ds Åijh fNnz rd izksc izfo”V djsa vkSj eki cVu nck,aA
b)Insert probe in fuel to upper holes and depress MEASURE switch. x) 3 lsdsaM ds ckn iznf’kZr jhfMax fjiksVZ djsa ¼bZ/ku ds uewus ds /kqzohdj.k ds dkj.k
c) Report displayed reading after 3 seconds. (Due to the polarization of the
fuel sample the apparent reading will continue to change. Only the reading ckgjh jhfMax yxkrkj cnysxhA dsoy eki cVu nckus ds 3 lsdsaM dh jhfMax lgh gksxh
3 seconds after depressing the MEASURE switch is correct). ?k) uksV % ;fn fMLIys ds ck;h vkSj ^1* iznf’kZr gks rks lqpkydrk Lrj ehVj ds Åijh jsat ls
d) Note: If a “1” is displayed on the left side of the display, the conductivity vf/kd gksxk
level exceeds the upper range of the meter.

Note: uksV %
a) The conductivity should range between 50 and 600 PS/M. d) lqpkydrk 50 vkSj 600 ih ,l @ ,e ds chp gksuh pkfg,
b) If the conductivity does not meet required specified range then the [k) ;fn lqpydrk visf{kr fofufnZ”V jsat iwjk u djs rks xSj laiq”V mRikn gSaMy djus dh izfØ;k
procedure for handling nonconforming product will be followed.
viuk;h tk,xhA

80 81
18. Millipore test procedure 18. feyhiksj tkap izfØ;k %

This test is carried out when the filter to be tested is in operation. ;g tkap rc dh tkrh gS tc tkap fd;k tkus okyk fQYVj izpkfyr voLFkk esa gksA
The Millipore monitor & Millipore membrane is put in Millipore test apparatus. feyhiksj eSEczsu ,oa feyhiksj ekfuVj feyhiksj tkap midj.k esa mi;qDr LFkku ij j[kk tkrk gSA
The inlet of the apparatus is then connected to the corresponding adaptor rRi’pkr midj.k dk buysV fQYVj ds vkmVysV ij miyC/k rnuq#i ,MkIVj ls tksM+k tkrk gSA
provided on the outlet of the filter.

A small quantity of product (minimum 2 litres) is flushed through equipment by ijh{k.k izkjaHk djus ds igys midj.k dh LoPNrk lqfuf’pr djus ds fy, midj.k esa rhu rjQk
using 3 way valve provided on apparatus to ensure cleanliness of apparatus miyC/k okYo ds mi;ksx ls midj.k esa ls mRikn dh FkksM+h lh ek=k Mkyh tkrh gSA
before test starts.
rRi’pkr mRikn dh iwoZ fu/kkZfjr ek=k midj.k essa fQV fd, x, ekfuVj ls ikl dh tkrh
A predetermined quantity of the product is then passed through the monitor gSA rRi’pkr ekfuVj dk fo’ys”k.k fd;k tkrk gSA
fitted in the apparatus. The monitor is then taken out for analysis.
eSEczsuksa ds izdkj esa ekewyh varj j[kus okys fQYVj lsijsVj ij nks izdkj ds feyhiksj
There are 2 types of Millipore tests carried out on filter separator having a minor ijh{k.k fd, tkrs gSa ftuds esEezsuks ds izdkj esa ekewyh varj gksrk gS
difference in the type of membranes and the analysis of result as given below.
d½ feyhiksj fotqvy ijh{k.k %
a) MILLIPORE VISUAL TEST

In this test the millipore monitor has a single membrane which is inserted in the bl ijh{k.k esa feyhiksj ekfuVj esa ,d eSEcsu gksrk gS ftls ijh{K.k fu”Ikfnr djus
monitor just before the start of the test by the person performing the test. okys O;fDr }kjk ijh{k.k izkjaHk gksus ds igys ekfuVj esa izof”V djk;k
tkrk gSA
A total of five litres is passed through the membrane and the membrane removed
immediately after the completion of the test and its colour compared with a eSEczsu ls dqy 5 yhVj mRikn ikfjr fd;k tkr gS vkSj ijh{k.k iwjk gksus ds
standard ASTM chart (in scale B). rRdky ckn eSEcszu gVk nh tkrh gS rFkk blds jax dh rqyuk ekud , ,l Vh ,e pkVZ
ls dh tkrh gS ¼Ldsy ch esa½
Results up to a level of B-6 are acceptable.
ch 6 Lrj rd ds ifj.kke Lohdk;Z gSaA
This test is done on all filters once a month.
;g ijh{k.k eghus esa ,d ckj lHkh fQYVjksa ij fd;k tkrk gSA

82 83
b) MILLIPORE GRAVIMETRIC TEST [k½ feyhiksj xzSohesfVªd ijh{k.k
In this test the millipore monitor consists of two identical membranes kept one bl ijh{k.k esa feyhiksj ekfuVj nks leku eSEcszuksa ls fufeZr gksrk gS ftlesa ,d ds Åij nwljh
below the other, the set being assembled in the manufacturer's factory. eEcszu j[kh tkrh gSA lsV fuekZrk dh QDVªh esa vlsacy fd;k tkrk gSA
A total of five litres is passed through the membranes in the monitor.
ekfuVj esa eSECkzsuksa ls dqy 5 yhVj inkFkZ ikl fd;k tkrk gSA
After the completion of test is sent to laboratory for testing, where 2 membranes
are weighed separately. ijh{k.k iwjk gksus ds ckn ekfuVj iz;ksx’kkyk esa ijh{k.k ds fy, Hkstk tkrk gS tgka nksuksa eSEcszuksa dk
vyx&vyx otu fd;k tkrk gSA
The difference of the weights of the top & the bottom membranes gives the solid
contaminants in the product. Åijh vkSj fupyh eSECkzsuksa ds otu esa varj mRikn esa Bksl iznw”kdksa dks iznf’kZr djrk gS
The acceptable limit is 0.22 milligram per litre maximum. Lohdk;Z vf/kdre lhek 0-22 fexzk@yhVj gS
The test is done once in three months. ;g ijh{k.k rhu eghus esa ,d ckj fd;k tkrk gS

84 85
19. Microbiological sampling procedure 19- lw{e tSfod uewuk izfØ;k

The Quality Control In-charge coordinates with D.G.C.A. approved laboratory xq.koRrk fu;a=.k izHkkjh 2 yhVj ds Lvjykbt lSaiy fVu izkIr djus esa Mh th lh , vuqeksfnr
for getting 2 litres sterilized sample tins in which samples are to be transported. iz;ksx’kkykvksa ls leUo; djrk gS ftuesa uewus Hksts tkrs gSaA
The bottom sample of the tank to be sampled is drawn and the same is collected Vsd ds isanh dk uewuk ftldh tkap dh tkuh gksrh gS mls fudkyk tkrk gS vkSj mls 2 yhVj ds
in the sterilized 2 litres sample tin. LVjykbt lSaiy fVu esa tek fd;k tkrk gSA
The sample tin is then placed in its wooden container, sealed & the Sample Label
with all required details fixed on it.
rRi’pkr uewus dk fVu blds ydM+h ds daVsuj esa j[kk tkrk gS lhy fd;k tkrk gS vkSj lHkh
vko’;d fooj.kksa ds lkFk uewus dk ysoy bl ij fpidk;k tkrk gSA
This sample is then sent to Laboratory where it is tested for growth of microbes.
;g uewuk iz;ksx’kkyk es Hkstk tkrk gSa vkSj bldk lw{e tSfod ijh{k.k fd;k tkrk gSA
The specified acceptable limits for the sample are 7 colonies per litre.
uewus dh fofufnZ”V Lohdk;Z lhek,a 7 dkWyksuh @ yhVj gSA
The frequency of this test is once a year.
bl ijh{k.k dh ckjackjrk o”kZ esa ,d ckj gSA
The Test Reports received from Laboratory are recorded in the Microbiological
Test Record iz;ksx’kkyk ls izkIr ijh{k.k fjiksVZ lw{e tSfod ijh{k.k fjdkM esa fjdkMZ dh tkrh gSA

86 87
ekud izpkyu izfØ;k,a & foekuu ,l ch ;w

vuqyXu & 1
xq.koRrk fu;a=.k tkap dksM

tkap dksM fooj.k tkap dk le;


1 HkaMkj.k VSad ckWVe uewuk izfrfnu lqcg
2 HkaMkj.k VSad ckWVe uewuk mRikn izkfIr ds igys
3 HkaMkj.k VSad ckWVe uewuk mRikn izkfIr ds ckn
4 HkaMkj.k VSad ckWVe uewuk mRikn fu”iknu ds igys
5 HkaMkj.k VSad ckWVe uewuk Hkkjh cjlkr ds ckn
6 fQYVj lsijsVj lai uewuk ikjh ‘kq# gksus ij
7 fQYVj lsijsVj lai uewuk izR;sd izpkyu ds nkSjku
8 buysVs Lvªsuj lai uewuk Vsad Vªd@VSad oSxu izkIr gksus ds ckn
9 ekbØksfud @ izh & fQYVj lai uewuk ikyh dh ‘kq#okr ij
10 vkmMysV Lvsªuj lai uewuk VSad Vªd@VSad oSxu dh yksfMax ds ckn
11 gkbMªsaV yks IokbaV uewuk izfrfnu lqcg
12 ckmtj Vsad ckWVe ,oa fQYVj lai uewus ikyh dh ‘kq#okr ij
13 ckmtj Vsad ckWVe Vki vi ds ckn
14 ckmtj Vsad ckWVe Hkkjh cjlkr ds ckn
15 fj¶;wfyax midj.k Vsad ckWVe ,oa fQYVj lai uewus foeku dh fj¶;wfyax ‘kq# gksus ls igys
16 fj¶;wfyax midj.k Vsad ckWVe ,oa fQYVj lai uewus foeku dh fj¶;wfyax iwjh gksus ds ckn
17 fjysDls’ku pSacj lai uewuk izfrfnu lqcg
24 VSad Vªd @ VSad oSxu lai uewuk vuyksfMax ls igys
25 VSad Vªd @ VSad oSxu lai uewuk yksafMax ds ckn
26 foeku VSad uewuk fM¶;wfyax ds igys
27 ckmtj Vsad ckWVe uewuk fM¶;wfyax ds ckn

uksV % tks ,- ,l- ,Q- 24 ?kaVs dke u djrs gksa] muesa ikjh dh ‘kq#okr dks izfrfnu lqcg i<+k tk,A

88 89

You might also like