3. THE CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF EXISTING
& VERTICAL BARS
PIPES AND STRUCTURES TO CONFORM WITH THE PROPOSED SANITARY UTIITIES. UNION PATENTE UNION PATENTE FLORENCIO VILLEGAS/ MARY JANE VILLEGAS
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED FLOOR AND WALL OPENINGS. CONCRETE SUPPORT
CCIP WATER LINE M + A DESIGN STUDIO
ARCHITECTURE | INTERIOR DESIGN | CONSTRUCTION
CCIP WATER LINE MOBILE NO: +639064039868 EMAIL: ma_designstudio@yahoo.com
5. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE PLAN, ANY RELOCATION REQUIRED FOR FIN. FLR. LVL.
PVC
12. ALL WATER PIPES AND WATER TANKS SHAL BE THOROUGHLY FLUSHED AND DISINFECTED. SANITARY ENGINEER / MASTER PLUMBER
P-TRAP
PRC. REG. NO.
13. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED PTR NO. TIN NO.
(AT LEAST 3.00M. HIGH) TO ENSURE THAT THE SYSTEM ARE WATER TIGHT. REVISIONS
NO. DATE DESCRIPTION
100mm THK.
14. WORKMANSHIP: THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST FLOOR DRAIN R.C. SLAB with
DRAWN BY:
SECTION CHECKED:
DATE
PROJECT NO.