TCE-5360A-EL-739- Verification of Relay Setting With Generator Transformer Damage 22-5-2008

I primary 500

Proposed Proposed
by TCE by DEWA
PSM 1.35 1.35
TD 0.3 0.5
Transformer
Base Current 447
Primary
Current in Relay Operation with Relay Operation with Transformer Damage Curve
Amps TCE settings DEWA settings Details

Relay OT Multiple
in sec as Relay OT in Current in of Base Time in
I/Iset per NI I/Iset sec as per NI Amps Current secs
1500 2.222 2.635 2.222 4.392 894 2 1700
2500 3.704 1.599 3.704 2.665 1028.1 2.3 1000
3500 5.185 1.268 5.185 2.113 1117.5 2.5 700
4500 6.667 1.097 6.667 1.828 1117.5 2.5 8
5500 8.148 0.990 8.148 1.650 1341 3 5.5
6500 9.630 0.915 9.630 1.526 1788 4 3
7500 11.111 0.860 11.111 1.433 2235 5 2
8500 12.593 0.816 12.593 1.360
9500 14.074 0.781 14.074 1.302
10500 15.556 0.752 15.556 1.253
11500 17.037 0.727 17.037 1.212
12500 18.519 0.706 18.519 1.176
13500 20.000 0.687 20.000 1.145
14500 21.481 0.671 21.481 1.118
15500 22.963 0.656 22.963 1.093
16500 24.444 0.643 24.444 1.071
17500 25.926 0.631 25.926 1.051
18500 27.407 0.620 27.407 1.033
19500 28.889 0.610 28.889 1.016
20500 30.370 0.600 30.370 1.001
21500 31.852 0.592 31.852 0.986
22500 33.333 0.584 33.333 0.973
23500 34.815 0.576 34.815 0.961
24500 36.296 0.570 36.296 0.949
25500 37.778 0.563 37.778 0.938
26500 39.259 0.557 39.259 0.928
27500 40.741 0.551 40.741 0.919
28500 42.222 0.546 42.222 0.910
29500 43.704 0.541 43.704 0.901
30500 45.185 0.536 45.185 0.893
TCE-5360A-EL-739- Verification of Relay Settings for Generator Transformer Damage 22-5-2008

Relay Co-ordination Check for Generator Transformer

1000.000

Transformer Damage W/s


curve
Time in Seconds

100.000

10.000
Relay Operation as
Recommended by DEWA

1.000

Relay Operation as
Recommended by TCE

0.100
100 1000 10000 100000
Current in Amps