Professional Documents
Culture Documents
Route Mapping W-12
Route Mapping W-12
Route Mapping W-12
Residential Commercial
Large
No. of Lane
Small
No. of Houses 3933 Population- 11080
Auto -2
Auto- 3
Hydraulic Auto -
Hydraulic Auto - 1 Auto -1
1
Handcart – 4 Handcart -1
Existing Handcart -3
Other-0
Tipper- 1
No. of
Hywa-0
Vehicle
Hydraulic Auto-0
Required
Bulk Waste
Generator Taj Hotel--- 50 Kg
Collection
6:30 .AM 6:30 AM
Starting Time
Collection
1:00 PM 1:00 PM
Ending Time
Sweeping
6:30 .AM 6:30 AM
Starting Time
Sweeping
1:00 PM 1:00 PM
Ending Time
1. Attendance of labours should be two time in a day( 5:30 AM & 1:30 PM)
2. At 12:30 to 1:00 PM all collection vehicles will join the sweeping staff .
3. Commercial area – University to Makai Gate (Left side area)
Route Chart :--
Auto-1 Auto-2 Auto-3
A ZONAL INFORMATION
a ZONE: 01
d CONTROLLING OFFICER:
f TOTAL WARDS: 14
h TOTAL JAWANS 14
k TOTAL HH 53676
B ASSESMENT CATEGORIES
1 DEMOGRAPHIC DETAILS
1.3 HH 3933
1.17 MOST IMPORTANT PERSONS OF THE WARDS 1. Mr. Sachin Khaire ji(
Corporator ) -
985004777 , 2. Ex-
Corporator Mr. Ganu Pande ji,
Mr. Dewa Salempure, Mr.
Nyaneshwar Jadhaw, Mr. Anil
Bhingare, Mr. Kishor Snide
2.1 QUANTITY OF WET WASTE GENERATED ON DAILY BASIS WET – 2.5 TONS, DRY- 1.5 TONS
2.11 % OF HH WHICH SEGREGATE WASTE AT SOURCE 30%
2.14 NUMBER OF OD AREA & EXACT LOCATION 1. PAHAD SINGH PURA ROAD,
2. MASAN BHUMI AREA
2.15 LOCALITY WHERE MINIMUM WET WASTE IS PRODUCED & THAKUR GALI, PAHAD SINGH PURA
QUANTITY
2.16 LOCALITY WHERE MAXIMUM WET WASTE IS PRODUCED &
QUANTITY
2.17 LOCALITY WHERE MINIMUM DRY WASTE IS PRODUCED &
QUANTITY
2.18 LOCALITY WHERE MAXIMUM DRY WASTE IS PRODUCED &
QUANTITY
2.19 RANK THE SEGREGATION AT SOURCE ON SCALE 1-5 (1 WORST- 5 4
BEST)
2.2 WARD WHERE THE SITUATION IS BEST VIDYUT COLONY
2.27 WHAT IS BEING DONE WITH THE READY COMPOST PRODUCED Given free
AT THESE DECENTRALISED UNITS (SOLD OR GIVEN FREE)
3.11 IF YES, REASON FOR OPPOSING Due to fear of oder & mis-managment of
AMC
3.12 MEASURES TAKEN BY AMC/AGENCY TO CONVINCE COMMUNITY Tried but could not succesded
FOR DECENTRALISED COMPOSTING & WASTE MANAGEMENT
5 OTHERS
ANY OTHER OBSERVATION OR INFORMATION
C METHODOLOGY
vii MEET THE SCRAP DEALERS AND UNDERSTAND THE TYPES &
RATES OF THE RECYCLABLE GARBAGE