JSA Oil Drainage
JSA Oil Drainage
JSA Oil Drainage
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCE
RISIKO)
(URUTAN LANGKAH DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SEC
MENIMBULKAN BAHAYA)
1. Equipment Mobilization 1. Damage to existing utilization 4 1 T 1. Install the plate above the existing utilization
2. Soil from the work area 2 2 M 2. Periodical cleaning of existing road
3. Hit another vehicle/installation around 3. Placing personnel to direct equipment when it m
3 2 M
2 of 8
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCE
RISIKO)
(URUTAN LANGKAH DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SEC
MENIMBULKAN BAHAYA)
7. Rebar Installation 1. Tripping material 1. Applying good housekeeping in the work area, p
2 2 R
working night
2. Scratched material 2 2 R 2. Placing workers who are proficient in iron install
3. Tripping on an electric cable 2 2 R 3. Arranging electrical cables not to obstruct main a
4. Hit rebar material 2 2 R 4. Conduct a briefing on communication in the iron
5. Lightning strike 5 2 E 5. Immediately stop work when heavy rain falls
8. Moving material to the area 1. Overloaded. 2 2 R 1. Conduct a briefing on the correct manual handlin
2. Hit the formwork material. 2 2 R 2. Conduct a briefing about communication in work
3. Machine operation error. area
3. Ensure that the machines used have SILO and
4 1 T
carry out inspection of the heavy equipment before
4. Tripping material. 4. Applying good housekeeping in the work area, p
1 1 R
working night
9 Fabricated formwork in Laydown 1. Hit a work tool. 3 2 M 1. Placing workers who are proficient in formwork w
2. Hit the formwork material. 3 2 M 2. Conduct a briefing about communication in work
3. High wind speed 3 2 M area
3. Implement good housekeeping to prevent flying
10. Formwork Installation 1. Tripping material 1. Applying good housekeeping in the work area, p
2 2 R
working night
2. Scratched material 2 2 R 2. Placing workers who are proficient in formwork w
3. Tripping on an electric cable 2 2 R 3. Arranging electrical cables
4. Hit the formwork material. 2 2 R 4. Conduct a briefing about communication in work
5. Working at height. 5 1 T 5. Install lifeline using wiresling to put body harnes
11 Concreting Work 1. Tripping material 1. Applying good housekeeping in the work area, p
1 2 R
working night
2. Exposure to concrete mixture 1 2 R 2. Flatten the concrete mixture using a vibrator (oth
contact with the concrete mixture
3. Hit a mixer truck / concrete pump 3. Placing safety supervisors during casting work,
3 2 M
personnel stand near the mixer pump / concrete pu
4. Expose a bad work position 2 2 M 4. Conduct a briefing about communication in work
5. Working at height. 5 1 T 5. Install lifeline using wiresling to put body harnes
12 Finishing Work 1. Trash scattered 1. Applying good housekeeping in the work area, p
2 2 R
working night
3 of 8
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCE
RISIKO)
(URUTAN LANGKAH DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SEC
MENIMBULKAN BAHAYA)
( )
( ) ( ) ( ) Konsultan Supervisi
Supervisor Construction Manager Project HSE Manager
KONSORSIUM DOOSAN - HUTAMA KARYA
P
T.
P
L
N
E
4 of 8
MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 ADD-ON
PROJECT, BEKASI, INDONESIA
KSO DOOSAN – HUTAMA KARYA
F BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCEDURES R
RISIKO)
H DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN) (P
MENIMBULKAN BAHAYA)
tion 1. Damage to existing utilization 4 1 T 1. Install the plate above the existing utilization
2. Soil from the work area 2 2 M 2. Periodical cleaning of existing road
3. Hit another vehicle/installation around 3. Placing personnel to direct equipment when it mobilize
3 2 M
6 of 8
F BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCEDURES R
RISIKO)
H DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN) (P
MENIMBULKAN BAHAYA)
1. Tripping material 1. Applying good housekeeping in the work area, providing lighting if
2 2 R Fore
working night Co
2. Scratched material 2 2 R 2. Placing workers who are proficient in iron installations
3. Tripping on an electric cable 2 2 R 3. Arranging electrical cables not to obstruct main access
4. Hit rebar material 2 2 R 4. Conduct a briefing on communication in the iron installation work
5. Lightning strike 5 2 E 5. Immediately stop work when heavy rain falls
he area 1. Overloaded. 2 2 R 1. Conduct a briefing on the correct manual handling method
2. Hit the formwork material. 2 2 R 2. Conduct a briefing about communication in working in the fabrication
3. Machine operation error. area
3. Ensure that the machines used have SILO and SIO for the operator,
4 1 T
carry out inspection of the heavy equipment before work
4. Tripping material. 4. Applying good housekeeping in the work area, providing lighting if
1 1 R
working night
ork in Laydown 1. Hit a work tool. 3 2 M 1. Placing workers who are proficient in formwork work
2. Hit the formwork material. 3 2 M 2. Conduct a briefing about communication in working in the fabrication
3. High wind speed 3 2 M area
3. Implement good housekeeping to prevent flying material
ion 1. Tripping material 1. Applying good housekeeping in the work area, providing lighting if
2 2 R
working night
2. Scratched material 2 2 R 2. Placing workers who are proficient in formwork work
3. Tripping on an electric cable 2 2 R 3. Arranging electrical cables
4. Hit the formwork material. 2 2 R 4. Conduct a briefing about communication in working
5. Working at height. 5 1 T 5. Install lifeline using wiresling to put body harness hook
1. Tripping material 1. Applying good housekeeping in the work area, providing lighting if
1 2 R
working night
2. Exposure to concrete mixture 1 2 R 2. Flatten the concrete mixture using a vibrator (other media), minimize
contact with the concrete mixture
3. Hit a mixer truck / concrete pump 3. Placing safety supervisors during casting work, ensuring that no
3 2 M
personnel stand near the mixer pump / concrete pump maneuver line.
4. Expose a bad work position 2 2 M 4. Conduct a briefing about communication in working
5. Working at height. 5 1 T 5. Install lifeline using wiresling to put body harness hook
1. Trash scattered 1. Applying good housekeeping in the work area, providing lighting if
2 2 R
working night
7 of 8
F BASIC JOB STEPS POTENTIAL ACCIDENT OF HAZARDS RISK LEVEL(TINGKAT RECOMMENDED SAFE JOB PROCEDURES R
RISIKO)
H DASAR PEKERJAAN) (POTENSI DAPAT TERJADI KECELAKAAN/ SEV PROB EXPOSURE (REKOMENDASI PROSEDUR KERJA SECARA AMAN) (P
MENIMBULKAN BAHAYA)
( )
) ( ) ( ) Konsultan Supervisi
upervisor Construction Manager Project HSE Manager
KONSORSIUM DOOSAN - HUTAMA KARYA
P
T.
P
L
N
E
8 of 8