Inspection Test Plan
Drywall Construction
Verifying Document Inspection Code
Item Particular / Activity Inspection Stage Inspection / Testing Activities Required Controlling Document Description NSC MC RSS M&E Remarks
Cont
A. Pre‐construction Stage
Method Statement ,Shop Drawing & Prior work commencement Approval by consultant ‐Approved MethodStatement Approval by consultant
1 Calculation ‐Approved Sh口p Drawing R HP HP N/A
B. Construction Stage
Receipt of material Material delivery Check material conforming to approval record Delivery note Check list
1 IV RI RI N/A
Verification Code:
Legend:
IV: Inspection & Verification NSC: Nominated Sub-Contractor
RI: Random Inspection MC: Main Contractor
T: Test RSS: Resident Site Staff of the Supervision
RIN: Request for Inspection Form
CP: Control Point
HP: Hold Point