CENTRAL ELECTRICITY REGULATORY COMMISSION

(Legal Division)

Weekly Hearing Schedule for the month of February, 2020 (24.2.2020 to 28.2.2020)

S. No. Petition No. Petitioner Subject in Brief


Date, Day &
Time
25.2.2020 1. 375/MP/2019 NLDC Petition under Sub-Section (4) of Section 28 of Electricity
Tuesday Act 2003 and Regulation 10 of the Central Electricity
At 10.30 A.M. Regulatory Commission (Fee and Charges of Regional Load
Miscellaneous Despatch Centre and other related matters) Regulations,
Petitions 2019 for determining the NLDC Charges for the control
period 01.04.2019-31.03.2024.(On admission )
2. 374/MP/2019 NRLDC Petition under Subsection (4) of Section 28 of Electricity Act
2003 and Regulation 10 of the Central Electricity Regulatory
Commission (Fee and Charges of Regional Load Despatch
Centre and other related matters) Regulations, 2019 for
determining the NRLDC Charges for the control period
1.4.2019-31.3.2024. .(On admission )
3. 376/MP/2019 NERLDC Petition under Subsection (4) of Section 28 of Electricity Act
2003 and Regulation 10 of the Central Electricity Regulatory
Commission (Fee and Charges of Regional Load Despatch
Centre and other related matters) Regulations, 2019 for
determining the NERLDC Charges for the control period
1.4.2019-31.3.2024. .(On admission )
4. 400/MP/2019 WRLDC Petition under Subsection (4) of Section 28 of Electricity Act
2003 and Regulation 10 of the Central Electricity Regulatory
Commission (Fee and Charges of Regional Load Despatch
Centre and other related matters) Regulations, 2019 for
determining the WRLDC Charges for the control period
1.4.2019-31.3.2024. .(On admission )
5. 378/MP/2019 SRLDC Petition under Subsection (4) of Section 28 of Electricity Act
2003 and Regulation 10 of the Central Electricity Regulatory
Commission (Fee and Charges of Regional Load Despatch
Centre and other related matters) Regulations, 2019 for
determining the SRLDC Charges for the control period
1.4.2019-31.3.2024. .(On admission )
6. 399/MP/2019 ERLDC Petition under Subsection (4) of Section 28 of Electricity Act
2003 and Regulation 10 of the Central Electricity Regulatory
Commission (Fee and Charges of Regional Load Despatch
Centre and other related matters) Regulations, 2019 for
determining the ERLDC Charges for the control period
1.4.2019-31.3.2024. (On admission )
7. 430/MP/2019 NLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of NLDC fees and
charges for control period 2014-19.
8. 431/MP/2019 NRLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of NRLDC fees and
charges for control period 2014-19. (On admission )
9. 433/MP/2019 NERLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of NERLDC fees and
charges for control period 2014-19. (On admission )
10. 434/MP/2019 WRLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of WRLDC fees and
charges for control period 2014-19. (On admission )

1
11. 435/MP/2019 ERLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of ERLDC fees and
charges for control period 2014-19. (On admission )
12. 437/MP/2019 SRLDC Petition for truing up application under Regulation 8 of
Central Electricity Regulatory Commission (fees & charges
of Regional Load Despatch Centre and other related
matters) Regulations 2015 for truing up of SRLDC fees and
charges for control period 2014-19. (On admission )
13. 68/MP/2020 NLDC Petition for approval of Performance Linked Incentive for
NLDC for the financial year 2018-19 with reference to NLDC
Charges for the control period 1.4.2014 to 31.3.2019. (On
admission )
14. 185/MP/2020 NRLDC Petition for approval of Performance Linked Incentive for
NRLDC for the financial year 2018-19 with reference to
NRLDC Charges for the control period 1.4.2014 to 31.3.2019.
(On admission )
15. 186/MP/2020 NERLDC Petition for approval of Performance Linked Incentive for
NERLDC for the financial year 2018-19 with reference to
NERLDC Charges for the control period 1.4.2014 to
31.3.2019. (On admission )
16. 160/MP/2020 WRLDC Petition for approval of Performance Linked Incentive for
WRLDC for the financial year 2018-19 with reference to
WRLDC Charges for the control period 1.4.2014 to
31.3.2019. (On admission )
17. 184/MP/2020 SRLDC Petition for approval of Performance Linked Incentive for
SRLDC for the financial year 2018-19 with reference to
SRLDC Charges for the control period 1.4.2014 to 31.3.2019.
(On admission )
18. 159/MP/2020 ERLDC Petition for approval of Performance Linked Incentive for
ERLDC for the financial year 2018-19 with reference to
ERLDC Charges for the control period 1.4.2014 to 31.3.2019.
(On admission )
19. 432/MP/2019 SPL Petition under Section 79 of the Electricity Act, 2003 read
with the statutory framework governing procurement of
power through competitive bidding and Power Purchase
Agreement dated 7.8.2007 seeking compensation on
account of increased cost incurred by Sasan Power Limited
consequent to default of the Procurers( On admission )
20. 63/MP/2020 BALCO Petition under Section 79(1)(b) and 79 (1)(f) of the Electricity
Act, 2003 for claiming extension of Scheduled Delivery Date
on account of force majeure events falling within the scope
of Article(s) 3.1, 3.4.3, 4.7 and 9 of the Power Purchase
Agreement dated 23.8.2013 read with the addendum dated
10.12.2013 executed between the Petitioner and the
Respondent No. 1(TANGEDCO). ( On admission ).
21. 92/MP/2020 KWPCL Petition under Section 79 (1) (c), 79 (1) (f) and 79 (1) (k) of
alongwith the Electricity Act, 2003 read with Regulation 14 of the
I.A.No.5/2020 Central Electricity Regulatory Commission (Grant of
Connectivity, Long-term Access and Medium-term Open
Access in inter-State Transmission and related matters)
Regulations, 2009, seeking quashing of the letter & invoice
dated 7.11.2019 and the letter dated 8.11.2019 issued by
Power Grid Corporation of India Limited (PGCIL) for
claiming transmission charges ( Interlocutory application
for interim reliefs) ( On admission) .
22. 91/MP/2020 RUMSL Petition under Guideline 18 of the Guidelines for Tariff
Based Competitive Bidding Process for Procurement of
Power from Grid Connected Solar PV Power Projects
(Resolution number 23/27/2017-R&R.) issued by the Ministry
of Power, Government of India on 3.8.2017 under section 63
of the Electricity Act, 2003, seeking certain deviations from
the aforementioned guidelines ( On admission) .

2
23. 327/MP/2018 DIL Petition under Section 79(1)(f) of the Electricity Act, 2003 for
claiming compensation on account of occurrence of
‘Change in Law’ events as per Article 10.1.1 of the Case1
long-term Power Purchase Agreement dated 27.11.2013
read with Addendum No. 1 dated 20.12.2013 entered into
between Dhariwal Infrastructure Limited andTamil Nadu
Generation and Distribution Corporation Limited thereby
resulting into additional recurring/nonrecurring expenditure
by Dhariwal Infrastructure Limited for supply of 100 MW
Contracted Capacity from Unit 2 of its 2×300 MW coal based
thermal generating station located at Tadali, Chandrapur in
the State of Maharashtra to Tamil Nadu Generation and
Distribution Corporation Limited.
24. 299/MP/2019 SSPL Petition under Section 79 of the Electricity Act, 2003 read
with Article 12 of the Power Purchase Agreement dated
31.5.2017 executed between the Petitioner and Solar Energy
Corporation of India Ltd., for seeing approval of Change in
Law events due to enactment of the GST Laws
25. 360/MP/2019 Jyoti Solar Petition under Section 79 of the Electricity Act, 2003 read
with Article 12 of the Power Purchase Agreement dated
08.02.2017, with effective date of 22.12.2016, executed
between the Petitioner and Solar Energy Corporation of
India Ltd., for seeking approval of Change in Law events
due to enactment of the GST Laws.
26. 71/MP/2019 SPL Petition under Section 79 of the Electricity Act, 2003 read
with statutory framework governing procurement of power
through competitive bidding and Power Purchase
Agreement dated 7.08.2007 executed between Sasan Power
Limited and the Procurers for compensation and restoration
of project economics due to unprecedented, unforeseen
and uncontrollable depreciation of the INR vis a-vis USD
pursuant to Hon’ble Appellate Tribunal for Electricity’s
Judgment dated 18.1.2019 in Appeal No. 202 of 2016.
27. 169/MP/2019 JPL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 for adjudication of the issues
arising out of the Power Supply Agreement (PSA) dated
31.12.2014 for supply of 115 MW and PSA dated 26.12.2014
for supply of 100 MW of power to Kerala State Electricity
Board Ltd. (KSEBL)
28. 25/MP/2019 IEX Petition under Section 66 of the Electricity Act, 2003 read
with the Regulation 7 of the Central Electricity Regulatory
Commission (Power Market) Regulations, 2010 for approval
of introduction of the Green Term-Ahead Market (Renewable
Energy) Contracts at Indian Energy Exchange Limited.
29. 300/MP/2018 GMRKEL Petition under Section 79 (1) (b) & (f) of the Electricity Act,
alongwith 2003 read with Regulation 14 (3) (ii) and Regulation 8 (3) (ii)
I.A.No.6/2020 of the Central Electricity Regulatory Commission (Terms
and Condition of Tariff) Regulations 2014 and read with
statutory framework governing procurement of power
through Competitive Bidding and Article 10 and 13of the
respective Power Purchase Agreements, executed between
GMR Kamalanga Energy Limited and its beneficiaries,
seeking compensation on account of Change in Law events
impacting revenues and costs during the Operating Period (
Interlocutory application for amendments of the Petition).
30. 301/MP/2018 GMRWEL Petition under Section 79 (1) (b) & (f) of the Electricity Act,
alongwith 2003 read with statutory framework governing procurement
I.A.No. 7/2020 of power through competitive bidding and Article 10 of the
Power Purchase Agreements dated 17.3.2010, 21.3.2013 and
27.11.2013 executed between GMR Warora Energy Limited
and the Procurers for compensation due to Change in Law
impacting revenues and costs during the Operating Period (
Interlocutory application for amendments of the Petition).
31. 127/MP/2019 CSP(G)PL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and invoking Article 12.2.1 of the
Power Purchase Agreement dated 2.8.2016 seeking
Commission to acknowledge and approve promulgation of
the Central Goods and Services Tax Act, 2017, Integrated
Goods and Services Tax, 2017, and the Karnataka Goods
and Services Tax Act, 2017 as ‘Change in Law’.

3
32. 129/MP/2019 CSP(G)PL Petition under section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and invoking Article 12.2.1 of the
Power Purchase Agreement dated 2.8.2016 seeking
Commission to acknowledge and approve promulgation of
the Central Goods and Services Tax Act, 2017, Integrated
Goods and Services Tax, 2017 and the Karnataka Goods
and Services Tax Act, 2017 as ‘Change in Law’.
33. 130/MP/2019 CSP(G)PL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and invoking Article 12.2.1 of the
Power Purchase Agreement dated 2.8.2016 seeking
Commission to acknowledge and approve promulgation of
the Central Goods and Services Tax Act, 2017, Integrated
Goods and Services Tax, 2017 and the Karnataka Goods
and Services Tax Act, 2017 as ‘Change in Law’.
34. 134/MP/2019 CSP(G)PL Petition under section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and invoking Article 12.2.1 of the
Power Purchase Agreement dated 2.8.2016 seeking
Commission to acknowledge and approve promulgation of
the Central Goods and Services Tax Act, 2017, Integrated
Goods and Services Tax, 2017, and the Karnataka Goods
and Services Tax Act, 2017 as ‘Change in Law.
35. 135/MP/2019 CSP(G)PL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and invoking Article 12.2.1 of the
Power Purchase Agreement dated 2.8.2016 seeking
Commission’s approval for promulgation of Central Goods
and Services Tax Act, 2017, Integrated Goods and Services
Tax, 2017 and the Karnataka Goods and Services Tax Act,
2017 as ‘Change in Law’.
36 280/MP/2019 ECL Reference from the High Court of Calcutta under Article
226 of Constitution of India in Writ Petition No. 17044 of
2015 in the matter of Eastern Coalfields Limited & Anr. V/s
Eastern Regional Power Committee and Others.
26.2.2020 1. 11/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014 19 tariff
Wednesday block and determination of transmission tariff for 2019- 24
At 10.30 A.M. tariff block for assets under Establishment of Pooling
Transmission Stations at Raigarh (Kotra) and Raipur for IPP Generation
tariff. Projects in Chhattisgarh (Set A DPR1).
2. 79/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and determination of transmission tariff for 2019-24
tariff block for Transmission assets under Southern Region
System strengthening Scheme- XVIII in Southern Region.
3. 104/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014- 19 tariff
block and determination of transmission tariff for 2019 - 24
tariff block for Asset I :Combined Assets One circuit of 400
kV D/C Dehradun-Bagpat line along with associated bays at
both ends. Part of second circuit of 400 kV D/C Dehradun-
Bagpat T/L as 400 kV S/C Roorkee Dehradun line from
Dehradun end and partly as 400 kV S/C Saharanpur-Bagpat
line from Bagpat end using part of one circuit of 400 kV D/C
Roorkee Saharanpur line (under-NRSS XXI) at intersection
point along with associated bays at Dehradun and Bagpat
end Asset II: 400/220 kV, 315 MVA ICT-1 at Dehradun and
associated bays with 1 no. 220 kV line bay, 400/220 kV, 315
MVA ICT-II at Dehradun and associated bays with 1 no. 220
kV line bay, and 80 MVAR bus reactor at Dehradun and
associated bays and Asset III 04 Nos. 220 kV bays at
Dehradun sub-station under Northern Region System
Strengthening Scheme XVIII in Northern Region.
4. 506/TT/2019 PGCIL Petition for truing up of Transmission tariff for 2014-19 tariff
block and determination of transmission tariff for 2019-24
tariff block for Asset-1: 765 kV D/C Wardha-Aurangabad
line-II alongwith 2 nos. 330 MVAR switchable line reactor at
Wardha end and 1 no. 240 MVAR line reactor for Ckt.-III at
Aurangabad end and associated bays and Asset-2: 1 no.
240 MVAR 765 kV line reactor for Wardha-Aurangabad Ckt.-
IV at Aurangabad end under Transmission System
Strengthening in Wardha-Aurangabad corridor for IPP
projects in Chhattisgarh (IPP-G) in Western Region.

4
5. 76/TT/2020 PGCIL Petition for (i) Truing up of Transmission tariff for 2014-19
tariff block and (ii) Determination of Transmission tariff for
2019-24 tariff block For (i) Asset-1: 1 No. 315 MVA,
400/220/33 kV, 3-Phase Transformer at Biharshariff Sub-
station and 1 No. 315 MVA, 400/220/33 kV, 3-Phase
Transformer at Jamshedpur Sub-station, (ii) Asset-2: 1 No.
80 MVAR, 420 kV, 3-Phase Reactor at Rourkela Sub-station,
(iii) Asset-3: 1 No. 315 MVA, 400/220 kV, 3-Phase ICT at
Durgapur Sub-station, (iv) Asset-4: 1 No. 160 MVA, 220/132
kV, 3-Phase ICT at Siliguri Sub-station, (v) Asset-5: 1 No.
315 MVA, 400/220 kV, 3-Phase ICT at Rourkela Sub-station,
(vi) Asset-6: 1 No. 50 MVA, 132/66 kV, 3-Phase ICT at
Gangtok Sub-station under Provision of Spare ICTs and
Reactors for Eastern, Northern, Southern and Western
Regions under Regulation 86 of Central Electricity
Regulatory Commission (Conduct of Business)
Regulations, 1999.
6. 35/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and Determination of Transmission tariff for 2019-24
tariff block or 5 Nos. of Assets under Eastern Region
Strengthening scheme VII in Eastern Region.
7. 507/TT/2019 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block for 03 Nos of Assets under Augmentation of
transformation capacity and reactive compensation in
Eastern Region.
8. 20/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014 19 tariff
block and Determination of Transmission tariff for 2019 24
tariff block For Asset 1 765 kV Line Bay and 240 MVAR
Switchable Line Reactor at Jabalpur Pooling Substation for
765 kV S/C Jabalpur Bina ckt. III (IPTC), Asset (2) 765 kV
Line Bay and 240 MVAR Line Reactor (Non-switchable) at
Bina Sub-station for 765 kV S/C Jabalpur-Bina ckt.-III (IPTC),
Asset 3 765 kV Line Bay and 240 MVAR Line Reactor at
Jabalpur PS and 765 kV Line Bay and 330 MVAR Switchable
Line Reactor at Dharamjaygarh Sub-station for ckt.3 of 765
kV D/C (ckt. 3 and 4) Dharamjaygarh - Jabalpur PS
Transmission line (IPTC), Asset 4 765 kV Line Bay and 240
MVAR Line Reactor at Jabalpur PS and 765 kV Line Bay and
330 MVAR Switchable Line Reactor at Dharamjaygarh Sub-
station for ckt. 4 of 765 kV D/C (ckt.3 and 4) Dharamjaygarh -
Jabalpur PS Transmission line (IPTC) under Line Bays and
Reactor Provisions at POWERGRID Sub-stations associated
with System Strengthening common for Western Region
and Northern Region in Western Region.
9. 499/TT/2019 PGCIL Petition for truing up of transmission tariff for 2014 -19 tariff
block and determination of Transmission tariff for 2019- 24
tariff block for Transmission assets under Provision of
Spare Transformers and Reactors in North Eastern Region.
10. 513/TT/2019 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and determination of transmission tariff for 2019-24
tariff block for transmission assets under North Eastern
Region Strengthening Scheme-II (NERSS-II) Part-A in North-
Eastern Region.
11. 130/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block For Transmission assets under North Eastern
Region Strengthening Scheme-IV (NERSS-IV) in North
Eastern Region.

5
12. 52/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block For (i) Asset A 400 kV, 125 MVAR Bus
Reactor along with associated bays at Patna Sub-station, (ii)
Asset B : 400 kV, 125 MVAR Bus Reactor along with
associated bays at Ranchi (iii) Asset C : 160 MVA
Transformer (1st) and associated bays at Malda Sub-station,
(iv) Asset D : 160MVA Transformer (2nd) and associated
bays at Malda Sub-station, (v) Asset E : 01 no. 400 kV bay at
Malda Sub-station, (vi) Asset F : 160 MVA Transformer and
associated bays at 220/132 kV Birpara Sub-station, (vii)
Asset G : 160 MVA Transformer and associated bays at
220/132 kV Siliguri Sub-station under ERSS-IV project in
Eastern Region under Regulation 86 of Central Electricity
Regulatory Commission (Conduct of Business)
Regulations, 1999.
13. 327/TT/2019 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and determination of Transmission tariff for 2019-24
tariff block Combined 7 Nos of Assets under ERSS II Project
14. 128/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and determination of transmission tariff for 2019-24
tariff block for Asset-I: 400 kV D/C Allahabad Kanpur Line
along with associated bays at both ends including 2x50
MVAR Line Reactor at Kanpur end under Northern Regional
System Strengthening Scheme XXX.
15. 87/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block for Combined Asset-1, 2, 3 & 4 (Notional
DOCO:1.7.2011), under East-West Transmission Corridor
Strengthening Scheme in Western Region.
16. 483/TT/2019 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and determination of transmission tariff for 2019-24
tariff block for transmission assets 160 MVA, 220/132kV, 3-
Phase Auto Transformer at Kopili, (ii) 132 kV S/C Kopili-
Khandong Transmission Line along with associated bays,
(iii) 100 MVA, 220/132 kV, 3-Phase Auto Transformer and
associated bays at Dimapur Sub-station and (iv) LILO of 132
kV Dimapur-Kohima Transmission Line in North Eastern
Region.
17. 70/TT/2020 PGCIL Petition for truing up of Transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block For assets under WRSS XVII.
18. 60/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014-19 tariff
block and (ii) Determination of Transmission tariff for 2019-
24 tariff block For Transmission assets under System
Strengthening - XI in Southern Region.
19. 77/TT/2020 PGCIL Petition for transmission assets under Common System
associated with ISGS projects in Krishnapatnam area of
Andhra Pradesh in Southern Region.
20. 19/TT/2020 PGCIL Petition for truing up of transmission tariff for 2014- 19 tariff
block and determination of transmission tariff for 2019- 24
tariff block for combined assets consist of Asset-I LILO of
400kV S/C Ballabhgarh Bhiwadi Transmission line at
Gurgaon along with associated bays, Asset-II: 315 MVA,
400/220 KV ICT-I along with associated bays at GIS Sub-
Station at Gurgaon and Asset-III 315 MVA 400/220 KV ICT II
along with associated bays at GIS Sub Station at Gurgaon
associated with Northern Region System Strengthening
Scheme VI in Northern Region.
27.2.2020 1. 64/MP/2020 NTPC Petition under Section 79 of the Electricity Act, 2003 read
Thursday with Regulation 29 of the Central Electricity Regulatory
At 10.30 A.M. Commission (Terms and Condition of Tariff) Regulations,
Miscellaneous 2019 for approval of additional expenditure on installation
Petitions of various Emission Control Systems at Simhadri Super
Thermal Power Station Stage-I (2X500 MW) in compliance of
Ministry of Environment and Forests and Climate Change,
Government of India notification dated 07.12.2015.(On
admission)

6
2. 66/MP/2020 NTPC Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 29 of the Central Electricity Regulatory
Commission (Terms and Condition of Tariff) Regulations,
2019 for approval of additional expenditure on installation
of various Emission Control Systems at Rihand Super
Thermal Power Station Stage-III (1000 MW) in compliance of
Ministry of Environment and Forests and Climate Change,
Government of India notification dated 07.12.2015.(On
admission)
3. 67/MP/2020 NTPC Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 29 of the Central Electricity Regulatory
Commission (Terms and Condition of Tariff) Regulations,
2019 for approval of additional expenditure on installation
of various Emission Control Systems at Sipat Super
Thermal Power Station Stage-I (3x660 MW) in compliance of
Ministry of Environment and Forests and Climate Change,
Government of India notification dated 07.12.2015. (On
admission)
4. 501/MP/2019 NTPC Petition for approval of additional expenditure on account
of installation of various Emission Control Systems at
Rihand Super Thermal Power Station Stage-II (1000 MW) in
compliance with the Ministry of Environment and Forests
and Climate Change, Government of India notification dated
7.12.2015. .(On admission)
5. 502/MP/2019 NTPC Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 29 of the Central Electricity Regulatory
Commission (Terms and Condition of Tariff) Regulations,
2019 for approval of additional expenditure on installation
of various Emission Control Systems at Tanda Thermal
Power Station (440 MW) in compliance of Ministry of
Environment and Forests and Climate Change, Government
of India notification dated 7.12.2015.(On admission)
6. 467/MP/2019 NTPC Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 29 of the Central Electricity Regulatory
Commission (Terms and Condition of Tariff) Regulations,
2019 for approval of additional expenditure on installation
of various Emission Control Systems at Simhadri Super
Thermal Power Station Stage-II (2x500 MW) in compliance of
Ministry of Environment and Forests and Climate Change,
Government of India notification dated 7.12.2015. .(On
admission)
7. 461/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with applicable CERC (Terms and Condition of Tariff)
Regulations, 2019 for approval of Expenditure on
installation of various Emission Control Systems as
detailed in this Petition for compliance of Ministry of
Environment and Forests and Climate Change, Government
of India Notification dated 07.12.2015.(On admission)
8. 462/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with applicable CERC (Terms and Condition of Tariff)
Regulations, 2019 for approval of Expenditure on
installation of various Emission Control Systems as
detailed in this Petition for compliance of Ministry of
Environment and Forests and Climate Change, Government
of India Notification dated 7.12.2015 (On admission)
9. 463/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with applicable CERC (Terms and Condition of Tariff)
Regulations, 2019 for approval of Expenditure on
installation of various Emission Control Systems as
detailed in this Petition for compliance of Ministry of
Environment and Forests and Climate Change, Government
of India Notification dated 07.12.2015.(On admission)
10. 459/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with applicable CERC (Terms and Condition of Tariff)
Regulations, 2019 for approval of Expenditure on
installation of various Emission Control Systems as
detailed in this Petition for compliance of Ministry of
Environment and Forests and Climate Change, Government
of India Notification dated 7.12.2015.(On admission)

7
11. 460/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with applicable CERC (Terms and Condition of Tariff)
Regulations, 2019 for approval of Expenditure on
installation of various Emission Control Systems as
detailed in this Petition for compliance of Ministry of
Environment and Forests and Climate Change, Government
of India Notification dated 7.12.2015.(On admission)
12. 393/MP/2019 APCL Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 29 of the Central Electricity Regulatory
Commission (Terms and Condition of Tariff) Regulations,
2019 for approval of additional expenditure on account of
installation of various Emission Control Systems at Indira
Gandhi Super Thermal Power Station (3x500 MW) in
compliance with the Ministry of Environment and Forests
and Climate Change, Government of India Notification dated
7.12.2015.(On admission)
13. 101/MP/2019 DVC Petition under Sections 62(a) and 79(1) (a) of the Electricity
Act, 2003 read with Regulation 8(3) (ii) and 8 (7) of the CERC
(Terms and Conditions of Tariff) Regulations, 2014 read with
Regulation 111 of the CERC (Conduct of Business)
Regulations, 1999 for recovery of additional expenditure
incurred due to sharing of transportation cost of fly ash
consequent to Ministry of Environment and Forest,
Government of India Notification dated 25.1.2016 as
'Change in Law' Event.
14. 94/MP/2019 DVC Petition under Section 79 of the Electricity Act, 2003 read
with Regulation 14 (3) (ii) and Regulation 8 (3) (ii) of the
CERC (Terms and Condition of Tariff) Regulations, 2014 for
approval of Expenditure on installation of various Emission
control systems as detailed in this Petition for compliance
of Ministry of Environment and Forests and Climate
Change, Government of India Notification dated 7.12.2015.
15. 366/MP/2019 DBPL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and Article 10 of the Power
Purchase Agreements both dated 1.11.2013 entered into
between the Petitioner and the Respondents, seeking
approval of the cost to be incurred by the Petitioner on
account of change in law, for installation/retrofit of
Electrostatic Precipitators (ESP), installation of Flue Gas
Desulphurisation (FGD), installation of low NOx burners,
providing Over Fire Air (OFA) and any other measures for
compliance of the notification dated 7.12.2015 issued by the
Ministry of Environment, Forests and Climate Change,
Government of India in respect of Thermal Power Plants
installed/commissioned after 1.1.2003 and before
31.12.2016.
16. 377/MP/2019 DBPL Petition under Section 79(1)(b) read with Section 79(1)(f) of
the Electricity Act, 2003 and Article 10 of the Power
Purchase Agreement dated 19.08.2013 entered into between
the Petitioner and the Respondents, seeking approval of the
cost to be incurred by the Petitioner on account of change
in law, for installation/retrofit of Electrostatic Precipitators
(ESP), installation of Fuel Gas Desulphurisation (FGD),
installation of low NOx burners, providing Over Fire Air
(OFA) and any other measures for compliance of the
notification dated 07.12.2015 issued by the Ministry of
Environment, Forests and Climate Change, Government of
India in respect of Thermal Power Plants
installed/commissioned after 01.01.2003 and before
31.12.2016.
17. 446/MP/2019 SPL Petition under Section 79 of the Electricity Act, 2003 and
Article 13.2(b) of the Power Purchase Agreement dated
7.08.2007 and this Commission’s Order dated 8.10.2018 in
Petition No. 133/MP/2016 seeking provisional approval of
the additional capital and operational expenditure on
account of installation of various Emission Control System
in compliance of Ministry of Environment, Forest and
Climate Change Notification dated 7.12.2015 re: emissions.

8
18. 209/MP/2019 SEIL Petition under Section 79(1)(b) read with 79(1)(f) of the
Electricity Act, 2003 and Article 10.1 of the Power Purchase
Agreement dated 1.4.2013, for the approval and consequent
relief sought by the Petitioner due to a 'Change in Law'
event viz. the introduction of new environmental norms by
way of the Environment (Protection) Amendment Rules,
2015 issued by the Ministry of Environment, Forest and
Climate Change dated 7.12.2015, impacting the revenues
and costs of the Petitioner during the operating period
19. 210/MP/2019 SEIL Petition under Section 79(1)(b) read with 79(1)(f) of the
Electricity Act, 2003 and Article 34.1 of the Power Supply
Agreement dated 18.2.2016, for approval and consequent
relief sought by the Petitioner due to a 'Change in Law'
event viz. the introduction of new environmental norms by
way of the Environment (Protection) Amendment Rules,
2015 issued by the Ministry of Environment, Forest and
Climate Change dated 7.12.2015, impacting the revenues
and costs of the Petitioner during the operating period
20. 292/MP/2019 AP&NR Petition under Section 79(1)(b) and 79 (1)(f) of the Electricity
Act, 2003 seeking compensation of carrying cost in respect
of the Change in Law events allowed by this Commission
under the Power Purchase Agreement dated 25.3.2011
(PPA) executed between the Petitioner and the Respondent
No. 2 and the Power Supply Agreement (PSA) dated
5.1.2011 executed between Respondent No.1 and
Respondent No. 2.
21. 447/TL/2019 B-IITL Application under Section 14 of the Electricity Act, 2003
read with Central Electricity Regulatory Commission
(Procedure, Terms and Conditions for Grant of
Transmission License and other related matters)
Regulations, 2009 with respect to Transmission Licence to
Bhuj-II Transmission Limited.
22. 445/TL/2019 LVTPL Application under Sections 14, 15 and 79(1)(e) of the
Electricity Act, 2003 read with Central Electricity Regulatory
Commission (Procedure, Terms and Conditions for Grant of
Transmission Licence and other related matters)
Regulations, 2009 with respect to grant of transmission
license to Lakadia Vadodara Transmission Project Limited.
23. 442/TL/2019 LBTL Application under Sections 14, 15, 79(1)(e) of the Electricity
Act, 2003 read with Central Electricity Regulatory
Commission (Procedure, Terms and Conditions for Grant of
Transmission Licence and other related matters)
Regulations, 2009 with respect to Grant of Transmission
Licence to Lakadia Banaskantha Transco Limited.
24. 425/TL/2019 FTL Application under Section 14 of the Electricity Act, 2003
read with Central Electricity Regulatory Commission
(Procedure, Terms and Conditions for Grant of
Transmission License and other related matters)
Regulations, 2009 with respect to Transmission Licence to
Fatehgarh-II Transco Limited.
25. 397/TL/2019 APT Application under Section 14 of the Electricity Act, 2003
read with Central Electricity Regulatory Commission
(Procedure, Terms and Conditions for grant of
Transmission License and other related matters)
Regulations, 2009 with respect to Transmission Licence to
Ajmer Phagi Transco Limited.
26. 259/GT/2019 TPL Petition for determination of tariff of SUGEN 1147.5 MW
Power Plant for the period 1.4. 2019 to 31.3.2024.
27. 270/GT/2019 TPL Petition for truing up of tariff of SUGEN 1147.5 MW Power
Plant for the period 1.4. 2014 to 31.3.2019.
28. 268/GT/2019 TPL Petition for determination of tariff of UNOSUGEN 382.5 MW
Power Plant (SUGEN-40) from 1.4.2019 to 31.3. 2024.
29. 272/GT/2019 TPL Petition for truing up of tariff for UNOSUGEN 382.5 MW
Power Plant from 1.4.2014 to 31.3.2019

By order of the Commission


Sd/-
` (T.D. Pant)
Dy. Chief (Legal
24.2.2020