Professional Documents
Culture Documents
Business Scenarios - AP
Business Scenarios - AP
Scenario Status
ID
Utility invoice to
be paid against A utility bill is received for processing quoting
multiple cost multiple cost centres with a split for the cost
AP005 centres against each. Complete Complete
Delete an invoice
that has been While inputing a credit note, the document is
entered erroneously entered as an invoice. Delete the
AP009 incorrectly document from the system Complete Complete
Multiple documents have been entered onto
the system in a batch. Can you validate all the
AP010 Batch processing documents in the batch in one go. Complete Complete
Credit note is received for an invoice. Can this
be processed against the original PO or an
AP011 Credit notes alternative PO? Complete
Upload the image against an invoice where
Document this is missing. Can multiple documents be
AP012 Attachments attached against an entry. Complete Complete
Process invoices against a supplier who is set
up for CIS (both gross and net). Are
AP013 CIS deductions deductions shown in line with the set up? Complete Complete
Additonal
Interface payment Can an additional payment be made to an
for sundry already established SS via a setup/payment
AP035 suppliers file Complete Complete
Will sundry supplier payments be
AP036 Sundry Suppliers automatically loaded as immediate terms Complete Complete
E-Invoice
-Interface invoice load and interface file with zero's at the
numbers beginning of the invoice number - check
APINT005 beginning with 0 oracle that they have come through Complete Complete
E-Invoice - Cancel, release hold or amend the description
Cancelling and on an invoice submitted via this innterface.
APINT006 amending invoices Can this be done? Complete Complete
Done
Done
But if we discard the line and PO number was
entered at Header Level, then even after
matching to new PO in Line 2, the header PO will
remain the same
It can be cancelled
Yes
Functionality remains same as EBS. System will
automatically create CIS Invoice payable to HMRC
upon payment of CIS Supplier
Yes
Yes
?
?
?
?
?
?
?
?
?
?
?
Test Script ID Test Script Module
Title
Test Scenario Detail User Role Frequency of
Process
Additional Details for Test Integration IDs Report IDs Control IDs
MOD_ref Process IDs Comments
Script Corrections
Required
Old Book: Dr Acuumulated Dep 300
Dr IC Receivable 700
Cr Asset Cost 1000
10.06
9.15
0.91
Employee Pat Ogeh Shashank Rathi Preparer
Manager Mariam Anamoah Owner
Auditor Evofin Owner's manager
Receipt 1000
Invoice 1000
Current Process
Create Credit Memo -300
Create supplier as customer
Create invoice on this customer 300
Receipt creation via AIMS 300
Close Credit Note??!
299.98
1146.18
349.72
Dr Expense
Cr Accrual
Dr. Accrual
Cr. Payable
Dr. Payable
Cr. Expense