Professional Documents
Culture Documents
BBP-PP.04-Shop Floor Control
BBP-PP.04-Shop Floor Control
BBP-PP.04-Shop Floor Control
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
BUSINESS BLUEPRINT
PRODUCTION MODULE
ON SAP ERP
AT
Submitted By
SCENARIO – PP.04
Shop Floor Control
Page 1 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
CONTENTS
1. SHOP FLOOR CONTROL (BULK PRODUCTION, PACKING, BUNDLING) .......................................................................................................................... 3
1.1 SAP BEST PRACTICE ...................................................................................................................................................................................................................... 3
1.2 TO BE PROCESS FLOWCHART ........................................................................................................................................................................................................ 4
1.3 PROCESS BLUEPRINT ...................................................................................................................................................................................................................... 5
1.4 IMPLEMENTATION CONSIDERATIONS ........................................................................................................................................................................................... 12
1.5 PROCESS STEP MAPPING .............................................................................................................................................................................................................. 13
Page 2 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Page 3 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Page 4 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
1.02
Daily production report is prepared. This is prepared Process Order: 1. Validation for
to record the daily production, no of batches, BOM
manpower utilization, and target and production Production manager will use this transaction to create 2. Validation For
variance as per shift. This is Created By shift in daily production plan against production plan. Costing
charge and approved by production in charge and
production manager. Input Fields:
Planned order(R) :
Production and consumption entry is done into ERP Process order type(R) :
system. This is done on the next day of production Partial Conversion(R) :
done.
Page 5 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
Note:
1. Following order types will be available into
system to create process order.
PI01 Bulk Production
PI02 Packing
PI03 Bundling
PI04 Assembly
Page 6 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
Page 7 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
1.03
Material Staging: Issue Slip Output
MIR is prepared by production team and sent to store Store manager will do this transaction to issue raw
department Store department issue the material materials/ packing materials against process order.
against same. Issuance of material is done on daily Transfer posting will be done from general store to
basis. production floor.
Note :
1. System will propose FEFO (First Expiry First
Out) for raw materials. User can overwrite this.
2. Batch determination will be done in background.
3. An Output will be printed from system after
transfer posting.
4. This transaction will be done on the same day
when physical stock is getting transferred.
1.04
Page 8 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
Releasing of process order will ensure that material is
available at production floor and standard cost estimate
is available for finished goods or semi finished goods.
Input Field:
Note:
1.05
Process Order Confirmation : 1. DPR Fields
Transaction will be done to record actual production, 2. BOM
overheads and consumption against process order. Validation
It will be done by production team. 3. Auto Batch
Generation
Input Fields:
Note::
1. Production entry will be done into system on next
Page 9 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
day of production..
2. Shift wise confirmation will be done.
3. Production entry will be done at production floor
always.
4. Fields related to DPR will be incorporated to this
screen.
5. Change will not be allowed for BOM components.
Only quantity can be changed within tolerance
limit.
6. Scrap/by-product generation will be also
confirmed here.
7. Backdated Production entry will be allowed for
one working day.
8. Batch Number generation:
Page 10 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Step TO BE Process
AS IS Process, Requirements & Expectations Gap / Comment
No. (R-Required, O-Optional)
1.07
Technical Completion :
Input Fields:
Note:
1. Transaction will be performed in mass at the
end of month.
Page 11 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Prerequisites Bill of Material, Resource, Master Recipe, Production Version and Planned Order
Enhancements 1. Validation For BOM change in process order.
2. Validation For BOM change in Order confirmation
3. Batch Number
4. DPR Fields addition at confirmation screen.
Outputs Issue Slip
KPIs Process Cycle Time, Actual v/s Standard BOM, Costing Variance.
Users
Changes
Authorizations
Improvements
Page 12 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
None
None
Material SAP
3 MF60 S Store Manager
Staging
None
Release
COR2/CO Production SAP
Process 4 S
R5 Manager
Order
None
Production SAP
Confirmation 5 COR6N S
Manager
Page 13 of 14
Business Blueprint
Process Owner : Mr. Sreekumar Consultant : Mr. Nudrat Maab Ahmad Process code:PP.04 Version : 1.0
Technically
Completion Production SAP None
6 COHVPI S
Manager
Page 14 of 14