Respondent’s Characteristics

Project Manager’s Perception

Direction: Read each statement carefully and fill up / check the given appropriate line
or box.

Example:

Fill up below:

Name: (Optional) Gender:  Male

 Female

Age and Working Experience

Project Manager’s Age:

Number of Years of Experience


In Construction Industry:

Working Experience in Construction types:

Residential:  Years of Experience:


Building:  Years of Experience:
Industrial:  Years of Experience:
Civil:  Years of Experience:
There some question we prepare for you Ma’am / Sir, It would be a great pleasure if you answer
this question and a great help for our Research Study. Thank you for your time Ma’am / Sir.

1. Have you experience falling behind schedule on one of your construction projects?

2. What are the factors affecting that delay?

3. What are the solution you’ve made to counteract that in order to prevent from happening
that again?
Check the appropriate box for Yes and
NO, or fill up the box with the require
information.

YES NO
MATERIAL
Is material always available when you
need it?
How many hours do you estimate are
lost per week due to material not being
available? Hrs. Hrs.

TOOLS
Are tools always available when
needed?
Are tools in acceptable shape?
Are tools supplied always the right
ones for the job?
Are there any specific tools in short
supply? (please name)
How many hours do you estimate are
lost per week due to tools not being
available or acceptable for the job?
Hrs. Hrs.
EQUIPMENT
Are equipment always available when
needed?
Are equipment in acceptable shape?
How many hours do you estimate are
lost per week due to equipment not
being available or acceptable for the
job? Hrs. Hrs.

YES NO
DRAWINGS
Are all drawings complete when
needed?
Are all drawing clear?
How many hours do you estimate are
lost per week due to drawings not
being available or acceptable for the
job?

Hrs. Hrs.
Inspection Day
Are the inspector always present on
the day of inspection?
How often does the inspector do visit a
site?
How many hours do you estimate are
lost per week due to delay of
inspection or acceptable for the job?
Incompetent supervisors
Does your Supervisor work fast or
slowly?
Does your supervisor is the
responsible of defective works or
inappropriate application of tools and
materials?

How many hours do you estimate are


lost per week due to incompetent
supervisor or acceptable for the job?

Instruction time
Does the Engineer give you instruction
on time?
How long will you wait to take the
instruction?
How many hours do you estimate are
lost per week due to Delay of
instruction time or acceptable for the
job?
Poor communication
Can you communicate well to Engineer
officer or to the Boss?
Will it Affect to your Work?

How many hours do you estimate are


lost per week due Poor communication
skill or acceptable for the job?
Poor site conditions
Do you still continue to work even if the
weather is not well?
Does it affect to the work?
How many hours do you estimate are
lost per week due Poor site condition
or acceptable for the job?

Rework
Does it affect the cost or delay of the
project?

Specify some structure that most do


the rework?
How many hours do you estimate are
lost per week due to reworking of the
structure or acceptable for the job?