Contractor shall furnish all labor and materials necessary to the project located at Camella Alta
Subdivision Brgy. Biga 1, Silang Cavite.
Contractor shall construct the structure in conformance with the plans, specifications and break down
signed by owner and contractor and will do so in workmanlike manner.
Contractor shall complete the work fully finished within the time frame set for the date work started.
Owner shall pay contractor the sum PHP 989,305.00 in installments basis.
We are happy to present the following quotation for the Total Renovation of Camella Alta lot based on
RCBULAWAN CONSTRUCTION SERVICES specifications.
SCOPE OF WORK
A. Masonry Works
1. Poured concrete of post.
2. Poured concrete of slab.
3. Alignment of hollow blocks.
4. Stucco or platter of alignment of hollow blocks.
5. Provision of AC.
6. Installation of tiles.
7. Floor drain.
8. Downspout.
9. Installation of Finn stone.
10. Exhaust range vent hood.
B. Welding/ Iron Works
1. Installation of steel trusses.
2. Installation of window grill.
3. Installation of steel gate.
4. Installation of grills in terrace.
5. Installation of iron base of water tank.
6. Installation of mirror in dining area.
7. Installation of mirror in front of staircase.
C. Electrical Works
1. Installation of panel board.
2. Installation of all switches, outlets, wiring.
3. Installation of lightings.
D. Plumbing Works
1. Installation of kitchen sink.
2. Installation of faucet.
3. Waterline of lavatory area.
4. Waterline of parking area.
E. Carpentry Works
1. Installation of 4 wardrobes (1piece) per bedroom.
2. Open shelves under the staircase.
3. Hanging cabinet in kitchen area.
4. Cabinet with pull out kitchen drawer under the kitchen sink.
5. Installation of jamb (excluding door) in ground floor bedroom and laundry area.
D. Painting Works
1. Interior and exterior of the house.
2. Grills.
3. Gate.
4. Iron base of water tank.
Project: Renovation
Location: Camella Alta Silang Cavite
Subject: Total Renovation
Date: April __, 2019
Please see attached separate quotation for the unit, supply and installation of the following;
Description Total
1. Materials Cost P 520,955.00
2. Labor Cost P 493,000.00
Please confirm your acceptance of this quote by signing this document: Signature: _________________
Print Name: ________________
Date: ______________________
If you have any questions concerning this quote, contact Richard C. Bulawan at 0942-969-0233.