MAXIMUS COMPLETION SYSTEMS

VALIDATION REPORT- NITRIDING

VALIDATION PROCESS – NITRIDING

Audit Performed by MAXIMUS COMPLETION SYSTEMS in the out


sourced Facility

Facility Name and address: Tropical Enterprises


124/12, GIDC Nandesari, Vadodara-40

Audit Date : 28.02.2019

Last Audit Date : 17.02.2018

Team Members

Siddharth Kesariya : Quality In charge


Ankit Khundhawala : COO

Details:

A) Machinery& Equipments :
Performance capability and Capacity and consistency checked: OK
B) Operators Skill &Training requirements:
Records and status and effectiveness verified : OK
C) Maximus Completion Systems Specification and procedures
Checked and Verified: OK
D) Identification of Material and Job Checked : OK
E) Calibration of Gauges and Instruments and Calibration Records
Checked and verified: OK
F) Procedures and Work instruction with acceptance criteria
Implementation and display verified: OK
G) Product Validation :
Checked by collecting a produced product: OK
H) Inspection and Testing and Reports preparation:
Checked and found available
I) Handling and delivery the product:
MAX/QC/10 ISSUE /REV NO:01/00 DATE:02/02/2013
MAXIMUS COMPLETION SYSTEMS

VALIDATION REPORT- NITRIDING

Checked and found being followed the out sourced validation


requirement specification MCSDP - 15
J) Non Conformance items and products:
Identified and kept separately

Material Specification:

MPH-961 - Salt Bath Carbo- nitriding with Mechanical Polish and


Oxidative Treatment with 0.0007” Minimum Case Depth

Acceptance Criteria as per material specification:

Effective Case Depth Requirements: The effective case depth is defined as


the depth to 50 HRc. This specification requires that the effective case to be
at least 0.0007” (0.02 mm).

Heat Treatment Cycles: Parts are to be clean and free from oxides, greases
and other contaminants prior to treatment. The heat treat cycle requirements
are listed in the Table below:

Process Step Bath Temperature Time at


Temperature
Preheat -- 570ºF - 750ºF (300ºC - 400ºC) 30mins – 1hour
Nitriding Nitriding 1075ºF ± 15ºF (580ºC ± 10ºC) 90mins – 2hrs*
Cooling Oxidizing 650ºF - 750ºF (340ºC – 10 – 15mins
400ºC)
Rapid Cool Water Bath not to exceed 120ºF ---
(50ºC)
Mechanical Surface mechanically processed using a technique appropriate to the
Processing desired Processing surface finish, e.g. abrasive treatment or
polishing/lapping.
Post- Oxidising 650ºF - 750ºF (340ºC – 10 – 30mins
oxidation 400ºC)
Rapid Cool Water Bath not to exceed 120ºF ---

MAX/QC/10 ISSUE /REV NO:01/00 DATE:02/02/2013


MAXIMUS COMPLETION SYSTEMS

VALIDATION REPORT- NITRIDING

(50ºC)
Cleaning Parts are to be thoroughly rinsed prior to immersion/coating with a
rust- preventative, e.g. Rust Veto MP20, 4212 or equivalent
*Process time to be recorded from the time when bath/charge temperatures have
equalized. The charge weight shall be such that the temperature drop shall not
exceed 70ºF (40ºC) and that equalization occurs within 30mins.

Surface Hardness: The surface hardness shall be 58 – 70 HRC.

Supporting Documents Attached:

01.Equipments calibration reports


02.Personnel qualification records
03.Material specification
04. Nitriding resulting records

Revalidation will be conducted on 28 Feb 2020

Siddharth Kesariya Ankit Khundhawala


Quality Incharge COO

MAX/QC/10 ISSUE /REV NO:01/00 DATE:02/02/2013