Professional Documents
Culture Documents
Validation Report Nitriding
Validation Report Nitriding
Team Members
Details:
A) Machinery& Equipments :
Performance capability and Capacity and consistency checked: OK
B) Operators Skill &Training requirements:
Records and status and effectiveness verified : OK
C) Maximus Completion Systems Specification and procedures
Checked and Verified: OK
D) Identification of Material and Job Checked : OK
E) Calibration of Gauges and Instruments and Calibration Records
Checked and verified: OK
F) Procedures and Work instruction with acceptance criteria
Implementation and display verified: OK
G) Product Validation :
Checked by collecting a produced product: OK
H) Inspection and Testing and Reports preparation:
Checked and found available
I) Handling and delivery the product:
MAX/QC/10 ISSUE /REV NO:01/00 DATE:02/02/2013
MAXIMUS COMPLETION SYSTEMS
Material Specification:
Heat Treatment Cycles: Parts are to be clean and free from oxides, greases
and other contaminants prior to treatment. The heat treat cycle requirements
are listed in the Table below:
(50ºC)
Cleaning Parts are to be thoroughly rinsed prior to immersion/coating with a
rust- preventative, e.g. Rust Veto MP20, 4212 or equivalent
*Process time to be recorded from the time when bath/charge temperatures have
equalized. The charge weight shall be such that the temperature drop shall not
exceed 70ºF (40ºC) and that equalization occurs within 30mins.