Schedule - MDB, SMDB 1-2
Schedule - MDB, SMDB 1-2
Schedule - MDB, SMDB 1-2
SERVICE VOLTAGE 380V/220V, 3P, 4W, 60Hz DATE : 12 OCT-2016 SERVICE VOLTAGE 380V/220V, 3P, 4W, 60Hz DATE : 12 OCT-2016
SMDB -01 LIGHTING PANEL BOARD SUB MAIN DISTRIBUTION PANEL SMDB -02 POWER PANEL BOARD SUB MAIN DISTRIBUTION PANEL
C.B C.B WIRE DEMAND LOAD PHASE 1 PHASE 2 C.B C.B WIRE DEMAND LOAD PHASE 1 PHASE 2
LOAD D.F PHASE 3 LOAD D.F PHASE 3
POLE
POLE
COLOR NO
AMP TYPE SIZE LOAD CONNECTED LOCATION %
COLOR NO
AMP TYPE SIZE LOAD CONNECTED LOCATION %
VA VA VA VA VA VA VA VA VA VA
R 1 3065 R 1 9060
Y 2 3 50 4x16+E16MM2 DB-LPP-GYM-GF GROUND FLOOR 10475 87.8% 9195 3065 Y 2 3 63 4x25+E16MM2 DB-PP-BF BASEMENT FLOOR 34000 80% 27380 9060
B 3 3065 B 3 9060
R 4 2941 R 4 5180
B 6 2941 B 6 5180
R 7 856 R 7 4406
Y 8 3 40 4x10+E10mm2 DB-LP-DW-BF BASEMENT FLOOR (DEWANIAH) 2569 100% 2569 856 Y 8 3 50 4x16+E16mm2 DB-PP-DW-BF BASEMENT (DEWANIAH) 17698 74.6% 13218 4406
B 9 856 B 9 4406
R 10 5043 R 10 8916
Y 11 3 50 4x16+E16mm2 DB-LPP-STAFF BASEMENT (STAFF HOUSE) 16460 92% 15130 5043 Y 11 3 63 4x25+E16mm2 DB-ACP- STAFF BASEMENT FLOOR 26750 100% 26750 8916
B 12 5043 B 12 8916
R 13 4375 R 13 17523
B 15 4375 B 15 17523
R 16 4236 R 16 10147
Y 17 3 40 4x16+E16mm2 DB-LP-GF-2 GROUND FLOOR (MAIN VILLA) 12708 100% 12708 4236 Y 17 3 100 4x35+E16mm2 DB-PP-GF GROUND FLOOR (STORE) 42000 72% 30440 10147
B 18 4236 B 18 10147
R 19 10696 R 19 5133
Y 20 3 80 4x35+E16mm2 DB-LY EXTERNAL LIGHTING 33035 97% 32089 10696 Y 20 3 50 4x16+E16mm2 DB-PP- FF 1 FIRST FLOOR (MAIN VILLA) 21800 71% 15400 5133
B 21 10696 B 21 5133
R 22 1270 R 22 5320
Y 23 3 40 4x16+E10mm2 DB-LPP-DW-GF GROUND FLOOR (DEWANIAH) 3810 100% 3810 1270 Y 23 3 50 4x16+E16mm2 DB-PP-FF2 FIRST FLOOR (MAIN VILLA) 20800 76% 15960 5320 1400
B 24 1270 B 24 5320
R 25 888 R 25 122228
2(4x240)mm2+
100%
Y 26 3 40 4x16+E10mm2 DB-LP-GYM-SWP-GF G.F (GYM & SWIMMING) 2664 2664 888 Y 26 3 800 E(1x120)mm2+ DB-R ATTIC FLOOR 369156 99% 366686 122228
B 27 888 B 27 122228
R 28 3650 R 28
Y 29 3 40 4x16+E10mm2 DB-LP-FF 2 FIRST FLOOR ( MAIN VILLA) 10950 100% 10950 3650 Y 29 3 100 SPARE
B 30 3650 B 30
Y 29 3 40 4x16+E10mm2 DB-LP-FF 1 FIRST FLOOR ( MAIN VILLA) 9763 100% 9763 3254 DEMAND FACTOR 93.3 %
B 30 3254
TOTAL MAXIMUM DEMAND 563739 VA
R 28 8518
MAXIMUM AMP 857.5 Amp
Y 29 3 63 4x25+E16mm2 DB-LPP-ATT ATTIC FLOOR 28024 91% 25554 8518
POLE
CABLE SIZE 4x120mm2+E70mm2 COLOR NO
AMP TYPE LOAD CONNECTED LOCATION %
SIZE VA VA VA VA VA
CABLE LENGTH 10m (AS PER SITE)
R 1 48792
3
VOLTAGE DROP 0.006 % Y 2 300 4x120MM2+E70MM2
SMDB 01 MAIN VILLA - ELECTRICAL ROOM 152406 96% 146376 48792
B 6 187913
R 7
Y 8 3 200 - - - - SPARE
B 9
R 10
Y 11 3 80 - - - - -
SPARE
B 12
710115 VA
CABLE SIZE
1500 A
4(4x300mm2)+E 2(1X150mm2)
SMDB-02
CABLE LENGTH