Quanti Descri tion of Item Rate Amount

6 Excavation for roadway in Hard Rock(require blasting) by dnlling, blasting and breaking, tnmmng
of bottom and side slopes in accordancewithrequirementsof lines, grades and cross sections.
loading and disposal of cut road with in all leads upto 1000mtsas per MoRT&Hspectficaton
301 (5th revision) and as directed by the Engineer-in-Charge (Boulders of morethan 3cum in size).

unit : Cum Page 50 of MoRT&HSOB


Taking out put = 180Cum
(A) Labour
0.22 day Mate 370.00 day 8140
3.00 day Mazdoorunskilled 310.00 day 930 oo
1011 40
(B) Machinery
180.00 cum Rate as per G.O. Ms No 10, 87.00 cum 1566000
11.25 hrs Tipper 5.5 cum capacity (4 trips for hour) 919.70 hr 10346 63
2600663

(C) Over head charges on (A) + (B) @ 1350 90


(D) Total of (A) + C) 28368.93
(E) Add Contractors Profit at 10% on (E) 2836.89
Cost per 180 cum (E)+(F) 31205.82
Rate for 1 cum 173.37
Rate to be adopted 173.00
1 Cum