PT.

KHARISMA SAMUDRA
INSPECTION,CONSULTAN,SHIP ENGINEERING & GENERAL SUPPLIER

FLF HANA
WALL THICNESS MEASURMENT TEST REPORT

Date Of Examination : October 20 , 2017

" Terima Kasih Atas Kepercayaan Yang Telah Anda Berikan Kepada Kami "
PT. KHARISMA SAMUDRA

LIST OF CONTENT

ATTACHMENT

Certificate Of Approval Class


Qualification and Certification of UT Level II
Sertification Of Calibration Thikness Measurment

REPORT DESCRIPTION PAGE

Air Tube ME I & ME II

Drawing and Result Test of Air Tube ME I & ME II ...................................... 1


PT. KHARISMA SAMUDRA

ATTACHMENT
PT. KHARISMA SAMUDRA

AIR TUBE ME I & ME II


WALL THICNESS MEASURMENT TEST REPORT
PT. KHARISMA SAMUDRA
JL. BELLER. BUKIT CINTA DAMAI 1.BALIKPAPAN (0542-870 6058)
pt.kharismasamudra.bpn@gmail.com

WALL THICKNESS MEASURMENT TEST REPORT


NAME OF SHIP FLF HANA OWNER PT. Sejahtera Karunia Lines MEASURMENT IN Millimeter ( mm )

CLIENT NAME PT. Sejahtera Karunia Lines REPORT NO 13 / KS-BPN / TEK / UTG / X / 2017 PAGE NO 1

NAME OF ITEM Air Tube ( ME I & ME II ) LOCATION Dock PT. GBU ,Balikpapan TESTING DATE October 20 , 2017

DRAWING AIR TUBE WALL THICKNESS MEASURMENT TEST


Sketched :
A A

D B D B

C C
240

240
1 1

2 2
1770

1770

Tube I Tube I

3 3
230

230

Note :
Inspection Area
1, 2, 3 (A - B - C - D)

Act. Thickness (mm) Remark


Part No. Item Spec. Spot No. Req.
A B C D

1 (Head) - 15.9 15.7 15.6 15.8


-
Tube I 2 (Middle) - 15.5 15.3 15.7 15.6
3 (Bottom) - 15.7 15.7 15.9 15.7
1 (Head) - 15.6 15.6 15.8 15.6
Tube II - 2 (Middle) - 15.4 15.6 15.5 15.5
3 (Bottom) - 15.6 15.8 15.6 15.7

Tested by : PT. Kharisma Samudra Reviewed by : PT. Sejahtera Karunia Lines Surveyor : Biro Klasifikasi Indonesia

SIGNATURE SIGNATURE SIGNATURE

NAME Hairil Anwar NAME NAME Hardi E P. Siagian

LEVEL Inspector UT Level II LEVEL DATE


DATE October 28, 2017 DATE