Employer’s Requirements 1-1R

1. INTRODUCTION

Mumbai Metro Line 7 Andheri East (-0.525) to Dahisar East-Excluding (15.450) of Mumbai
Metro Rail Project of MMRDA rail project proposes providing elevated corridor with 25 KV
Single Phase electrified Standard Gauge Railway system. It has one corridor and 13 Metro
stations as given below. Project Map for Mumbai Metro Line 7-Andheri East (-0.525) to
Dahisar East-Excluding (15.450) of Mumbai Metro Rail Project of MMRDA is enclosed as
Annexure-6 of particular specifications.

Sr Station Chainage
No.
1 Andheri(E) -00+004.446
2 Shankarwadi 01+565.264
3 JVLR Junction 03+156.886
4 Mahanand 04+218.500
5 Aarey 06+118.809
6 Pathanwadi 07+272.972
7 Pushpa Park 08+105.860
8 Bandongri 09+375.885
9 Mahindra & Mahindra 10+082.169
10 Magathane 11+760.757
11 Devi Pada 12+522.657
12 National Park 13+761.158
13 Oveari Pada 14+721.158

1.1 To control and monitor the metro railway system, a centralized Operational Control Centre
(OCC – 19°09’48.0”N ,72°51’38.3”E(tentative)) and Admin building will be located at Aarey..
However, till construction/commissioning of OCC at Aarey, operation of Traction/auxiliary
power supply system will be controlled from Back Up Control Centre (BCC) located in
Charkop depot.. This will subsequently act as Back Up Control Centre later when OCC
becomes functional at Aarey.