METHOD STATEMENT

COMPANY

Lead/Supervisor/CP PRASANTH

Scope of work 81PGC21AP001/81PGC22AP001/81PGC23AP001 CCWS


PUMPS,82PGC21AP001/82PGC22AP001/82PGC23AP001 CCW
PUMPS AND 81PGB10BB001 EXPANSION TANK TOUCH PAINTING
AND INSPECTION

Description of Start date/time 26/12/2019


equipment/system (KKS)
UNIT 3-CCW PUMP Finish date/time 02/01/2020
(Please specify location) GROUPS

Name Role/Trade

Personnel involved ZAKA UR REHMAN HSE Manager


Foreman

Key Plant, equipment & Hand Tools


tools to be used

Method of access and Ladders, Scaffolding


egress to the work area

Fall protection measures Safety Harness

Sequences of operations 1- Make sure the Equipment’s are Isolated

Specific staff training


(please provide certificate

Chemicals characteristics As Per attached Product data Sheet.


(if applicable)

(please attach MSDS)

SWL’s

Risk Assessment GE-GAMA-PS5-Sonmez-001


reference

Control measures Mandatory PPE, Full Body Harness


(including PPE)

Additional Safety Area isolation


Precautions

________________________________________________________________________________________________________
Emergency Rescue Plan See GAMA rescue plan.

This method statement is valid for the duration of this task only

Raised by PRASANTH

Additional information

METHOD STATEMENT BRIEFING RECORD

Briefed delivered by Ömer Burcu

Position Foreman

Date 20/06/2019

We (the undersigned) have read and understood the attached method statement and we will
comply with the specified requirements and control measures. If the work activity changes or
deviates from that originally envisaged, we will seek for further advice and request an
amended method statement

Name (print) Signature Date

Muhammed Jahangir

Iqbal Hasan

Talha Mahmut