Cost Estimate For Concrete Production
Cost Estimate For Concrete Production
TENDER RATE
S/NO MATERIAL DESCRIPTION UNIT
N
1.00 CEMENT
2.00 BLOCKS
3.00 GRANITE
4.00 SAND
5.00 FILLING
Bitumen
Asphalt
B.) PLANTS/INSTRUMENTS
D.) LABOUR
1 Supervision 4 No Ls 35,000.00
6 Admin 4 No 8,000.00
SUMMARY
Material 1,116,500.00
Plant/Instruments 401,500.00
Diesel/Petrol 206,740.00
Labour 125,400.00
=N 37,002.80
P.W. NIGERIA LIMITED
QUARRY
IBADAN QUARRY DAILY REPORT DATE: 09-07-2013
ITEM DESCRIPTION
1 CRUSHER
(a) HOU 7.00 HRS (AVAILABILITY) %
(b) TOTAL 1,775.00 TONS
(b) PROD - m3/HR
(c) STAN 3.00 HRS
REMARKS:
(i) CRUSHING STARTED @ 7.10AM DUE TO DELAY AS A RESULT OF STONE JAM IN THE PRIMARY JAW
(ii) AND PATCHING OF MESH ON THE FINAL SCREEN
(iii)………………………………………………………………………………………………………………………………………………
TOTAL 1,775.00
TOTAL
4 DELIVERIES TO QUARRY
(a) MC1… - Tons
(b) S125… - Tons
(c) 60/70….. - Tons
5 BLASTING
PRIMARYSECONDARY
A. ……..HOLES - -
B. EXPLOSIVES - -
C. ANFO (kg) - -
D. NONT DET - -
E. N DET CONT - -
F. CORD - -
G. ELECTRIC DET - -
REMARKS ……………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………
6 DRILLING - ACTIVITIES
REMARKS: ……………………………………………………………………………………………………………
…………………………………………………………………………………………………………………..………
7 EXPLOSIVE
REMARKS …………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………………………
……………………………………………
………………………………………………………………………..
……………………………………………………………………………
…………………………………………………………………………….
…………………………………..…………………………………………
6375
1000
318
650
315
4750
85
…………………………………………..
……………………………………………