THIS CALCULATION IS TO DETERMINE THE SAFE SPACING BETWEEN SIDE BOOMS REQUIRED FOR POSITIONING AND LOWERING
OF PIPELINE INTO TRENCH.
INPUT DATA:
Trench details:
Height of skid Y1 = 1000.00 mm
Depth of cover dcover =
Y2 = 1000.00 mm
Depth of trench (Y4= Y2 + D) Y4 = 1921.90 mm
Verticle distance between pipe on skid and pipe on trench bottom Y5 = 2921.90
Trench gap on left side of pipe X1 = 150.00 mm
Trench gap on right side of pipe X2 = 150.00 mm
Trench side angle Ø = 16.00 Degree
Y4
X 3= ( tan ( 90− φ ) X3 = 551.10 mm
Wbottom
Width of trench at bottom W bottom=D+ X 1 + X 2 = 1221.90 mm
W top D X6 = 2123.00 mm
X 6= + X 4+
2 2
Side boom details:
Based on the information collected from site and it is suggested that overhanging to be considered is as given bellow:-
1. First side boom moving in forward direction ) - X8 = 4500 mm from trench centre
2. Second side boom ( behind side boom which will place the pipe section in the trench ) - X 8 = 3500 mm from trench centre
3. Third side boom ( behind second side boom which will place the pipe section in the trench ) - X 8 = 2500 mm from trench centre
4. The side boom will be placed in staggered position with respect to trench centre line. It will result in nearly same boom overhang ( X 7 )
which may vary from 2500 mm to 3500 mm which will give the more conservative results.
CALCULATIONS :
0 .5 E×OD steel
Rc = = 298.76 m
0 . 65×SMYS
CALCULATION FOR SAFE LIFT POINT SPACING:
A. Minimum spacing between two side booms with considering total weight of pipe
Capacity sideboom
S sideboom = = 46.54 m
SF capacity ×W total
4
sideboom
5×W steel×S δactual
δ actual= = 15.94 mm
384×E×I
B. Maximum allowable sag as per elastic bend radius
[√
X = R c−( AC )2
2
] X = 298.52 m
Check for bending moment : Mb max should be less than Mb allowable BENDING MOMENT IS SAFE
CALCUATIONS FOR POSITIONNING AND LAYING OF PIPELINE:
A. Maximum horizantal distance between cetere of trench and original position of pipe
X6 = 2.12 m
B. Total verticle distance to be covered Y5 = 2.92 m
During the process of positionning and laying of pipe it will bend in double curvature in horizantal as well as inverticle plane.
√
Dis tan ce max = ( X 26 +Y 25 ) Distance max = 3.61 m
D. Length of pipe string between touchdown point at roller on ground and touch down point at the trench bottom =
( = Ssideboom x number of side booms )
Dsb = 72.00 m
Ltotal arc
Lhalf arc = Lhalf arc = 36.00 m
2
G. Angle Lhalfarc
sin ϕ= Ф = 6.92 Degree
Rc
Therefore
Lhalfarc X = 296.58 m
X=
tan ( φ )
H. Maximum deflection S = 2.18 m
S=R c− X
I. Maximum allowable deflection
Sallowable
S allowable =2×S = 4.35 m
Check for max deflection = maximum allowable deflection should be more than the maximum distance to be covered
= DEFLECTION IS SAFE